Beruflich Dokumente
Kultur Dokumente
EXERCISE EMPEX 2
Hosted by:
Government Office for London
Riverwalk House
1st Floor
157 – 161
London
SW1P 4RR
Draft EMPEX 2
Page 1 of 12
Draft EMPEX 2
Table of Contents
Introduction Page 3
Exercise Arrangements Page 4
- location
- briefing
- exercise objectives
- DTI exercise
objectives
- Exercise rules
GEG Terms of Reference Page 5
Structure of the GEG Page 6
Participation Pages
7- 8
Exercise scenario Page 9
Method & timetable Pages 9 – 10
Joint post exercise report Pages
10
Draft EMPEX 2
Page 2 of 12
Draft EMPEX 2
Introduction
The Telecoms Industry National Emergency Plan requires
an annual test of the Plan. The first Emergency Planning
Exercise – EMPEX 1 - took place on 20th January 2005.
EMPEX follows the series of Harmony exercises which
tested the Memorandum of Understanding between BT
and C&W .
Draft EMPEX 2
Page 3 of 12
Draft EMPEX 2
Exercise Arrangements
Location
Government Office for London
1st Floor
Riverwalk House
157-161 Millbank
London
SW1P 4RR
Briefing
This will be conducted for all the participants, including
GEG members, from 0930 to 0950 by the industry exercise
planners at Riverwalk House. The exercise starts
immediately afterwards.
Exercise Objectives
- test the procedures and processes of the TI-EPF
MoU/National Emergency Plan
- incorporate the EMPEX 1 recommendations as
appropriate
- include participation of central government/devolved
administrations and industry as appropriate
- provide familiarisation for those people who would
use the MoU in a real event
communications bridge
- audio telecommunications conference facilities
Exercise Rules
- the exercise will be played in real time
- messages (telephone, fax, e-mail) to be headed with
“Exercise EMPEX2”
- all messages/issues to be logged using appropriate
operation logs
- if a real incident occurs the exercise may be
terminated
Draft EMPEX 2
Page 6 of 12
Draft EMPEX 2
Draft EMPEX 2
Page 7 of 12
Draft EMPEX 2
Participation3
Gregor.Lindsay@scotland.gsi.gov.uk
Industry
Draft EMPEX 2
Page 9 of 12
Draft EMPEX 2
Exercise Scenario
- single wide geographical area to be affected;
- severe weather, storms and flooding, snow and ice
affecting both fixed and mobile infrastructure;
- central Scotland/Edinburgh [key location] with North
East also affected;
- selected number of Communications Service
Providers (CSPs) affected;
- invocation of the NEAT process.
13.00 – 14.00
- 2nd NEAT call
- GEG Incident Controller attends 2nd NEAT call and
gives response
- updated telecommunications impact assessment
- shopping list of requirements for assistance
- offers of assistance from other CSPs
14.00 - 14.30
- GEG prepares final report
14.30 – 15.00
- 2nd (final) industry media bridge attended by GEG
media rep. to agree updated media statement
15.00 – 15.30
- 3rd industry NEAT bridge with final closing reports
from industry, GEG Incident Controller
15.45 – 16.15
- hot wash-up review: industry, GEG, media, [OFCOM,
GO-North East, Scottish Executive], observers
16.30 – 17.00
- hot wash-up exercise review led by industry EMPEX 2
industry planning team and close
BR2
Content & Communications Industries
December 2006
Draft EMPEX 2
Page 12 of 12