11 Testi n g System/ Volume/ Performa n ce/ In tegratio n / Accepta n ce Obtain/ prepare source data matching all the scenarios. Try to obtain production source data if possible for testing. If possible have more rounds of testing. Perform Unit testing Test for negative cases too. If there are changes, do regression testing. Ensure the configuration similar to production environment while testing. Identify system related issues and include them in System Testing. Configure and useSchedulers. Perform Volume testing with various data. Use source data from production if available. Otherwise use generate data using tools for volume testing. Identify all other external components and include them for Integration testing. Desig n Desig n Desig n Desig n R equireme n ts R equireme

n ts R equireme n ts R equireme n t l BuildBuildT estTest TestTest I mpleme n t I mpleme n t I mpleme n t I mpleme n t

s d

B Build

Support

SupportSupport

2002. Infosys Technologies Ltd. 12 I mpleme n tatio n

N eed to plan in advance for the implementation phase. N eed to collaborate withdifferent stake holders to successfully implement various aspects of the applicationsuch as DataStage jobs, Control-M schedule, Unix scripts, ACR application, etc. In case of a new environment like grmetlprod01, there needs to be a testimplementation phase to iron out any environment related surprises. Awareness of the new processes in place for DataStage implementation such as thedeployment using W BSD. This will help in resolving problems and reducing delays A well developed deployment checklist which can be reused across projects Desig n Desig n Desig n Desig n R equireme n ts R equireme n ts R equireme n ts R equireme n t l BuildB TestTest I mpleme n t I mpleme n t I mpleme n t I mpleme n tSupportSupport SupportSupport u

s d i l d

B Build T e s t

T est

2002. Infosys Technologies Ltd. 13 Support Supported DataStage applications after implementation and successfully turned over afew applications to ESS. N eed to plan well in advance for the involvement of TOC for the application turnover. Also a comprehensive knowledge article listing all the issuesfaced and the resolution from the UAT through support phase is very critical for thesupport team.

Based on the criticality of the application, a clear escalation procedure/support planshould be put in place to address environment related issues. This should be plannedin advance with the DataStage support team as well as the DB hosting team. Ability and experience to provide 24*7 support is critical for most of the high volumeData W arehouse ETL applications. Infosys Global Delivery Model suits for round theclock support with onsite-offshore resources. Familiarity with all the support/turnover activities and systems like remedy to managethe post implementation/ turnover effectively. Desig n Desig n Desig n Desig n R equireme n ts R equireme n ts R equireme n ts R equireme n t l BuildB TestTest I mpleme n t I mpleme n t I mpleme n t I mpleme n tSupportSupport SupportSupport u

s d i l d

B Build T e s t

T est