Beruflich Dokumente
Kultur Dokumente
Lajur Pipa Air Kotor Lt. 1
Lajur Pipa Air Kotor Lt. 1
4B 4B 9 9 9
UP
CRUSHER CRUSHER MIXING MIXING
KORIDOR
± 0.000
RUANG RAW MATERIAL
UNLOADING
RUANG MIXING ± 0.000
± 0.000 - 1.000
± 0.000
4B
MASUK
13
14
15
16
17
18
19
05
06
07
08
09
10
12
20
03
04
11
21
LIFT ± 0.000
DN
UP
19
10
12
13
14
15
16
17
18
20
02
03
04
05
06
07
08
09
11
01
21
TOILET WANITA
1000
± 0.000
AUTO LODER
+ 0.500 RUANG POS SECURITY
- 0.050 -1.000
P Ø4"
4A
P Ø4" ke Ø3"
P Ø3" - P0.050
Ø4"
IM IM IM IM IM IM IM IM IM IM IM IM IM IM IM IM IM IM TOILET PRIA
6100
± 0.000
UP
RUANG JANITOR
± 0.000
4
RUANG MOULD
± 0.000
GUDANG 2
FRONT GARDEN - 1.000
- 0. 050
RUANG TAMU
± 0.000
HASIL PRODUKSI ± 0.000
JALAN BETON
VOID
RUANG RESEPSIONIS
± 0.000
4B
9
RUANG RND RUANG GENSET
± 0.000 - 1.000
RUANG TAMU
± 0.000
ASSEMBLY AREA
± 0.000
SINGLE CRANE 3T 1400
2000 1400 RUANG ADM
1400 ± 0.000
RUANG MDP PANEL
9
2000 - 1.000
1800 1800 RUANG PRODUKSI
± 0.000
HB100 HB100
RUANG UTILITY
± 0.000 IM IM
4B
6100
6100
6100
2000 21 22 23 24 25 26
4500
± 0.000
SC T DRL BPC 1 2 1 2 1 2 QC BARANG KELUAR
± 0.000
LOADING
- 1.000
EBM EBM
2400
BPC T F
AUTO LODER
UP
DRH
700
1000
+ 0.500
4B 4B 4B 4B 4B