Sie sind auf Seite 1von 2

1/2

Concordia University
Center for Continuing Education
CE-1276/B1 Project Management/PM

Create a Gantt chart into Excel


Excel does not contain a built-in Gantt chart format; however, you can create a Gantt chart in Excel by
customizing the stacked bar chart type.

The following steps show you how to create a Gantt chart like the following example.

Step 1. Enter the sample data


Open a new worksheet in Excel and enter the following values in cells A1 through D6:

A B C D
1 Start Date Completed Remaining
2 Task 1 08/01/2000 205 10
3 Task 2 10/15/2000 200 120
4 Task 3 12/15/2000 140 200
5 Task 4 02/06/01 44 345
6 Task 5 05/06/01 0 380

Note The values in columns C and D (Completed and Remaining) represent numbers of days.

Select cell B2 and format with the date format you want to use for the chart by clicking Cells on the
Format menu, and then clicking the Number tab.

Click Date in the Category list, and select the format you want to use in the Type list.

Step 2. Create a stacked bar chart


Select cells A1:D6 and click Chart Wizard.

In step 1, click Bar under Chart Type, and then click the Stacked Bar sub-type (you can see the name of
each chart sub-type at the bottom of the dialog box).

Click Next, Next, and then Finish.

Step 3. Make the chart look like a Gantt chart


Double-click on the chart area. This is the series for Start Date. If default colors are set in Excel 2002, this
series is blue.
2/2

On the Patterns tab of the Format Data Series dialog box, click None for Border and None for Area,
and then click OK.

Double-click the category (x) axis, which in a bar chart is the vertical axis. (In a bar chart, the traditional x-
and y-axes are reversed.) Click the Scale tab, and select the values in reverse order check box.

Click the Font tab, click 8 under Size, and then click OK.

Click inside the chart area and make it wider.

Making August 1 2000 as a start date.


Double-click the value (y) axis, which in a bar chart is the horizontal axis. After completing the last step,
this axis should be located at the top of the chart plot area.

To see the serial number for a date, enter the date in a cell, and then format that cell with the
General number format.

Click the Scale tab and type the following values in the appropriate boxes:
Minimum: 36739
Maximum: 37441
Major unit: 61
Minor unit: 1

These values are serial numbers that represent the dates to be used for the value (y) axis.

The minimum value 36739 represents the date August 1, 2000.


The maximum value 37441 represents the date July 4, 2002.
The major unit of 61 represents about two months
The minor unit 1 represents one day.

To move dates above the chart click on the Scale tab, select the value (y) axis crosses at maximum
value check box.

Click the Alignment tab, and under Orientation, type 45 in the Degrees box.

Click the Font tab, and under Font style, click Bold. Under Size, click 8, and then click OK.
Right-click the legend, and click Format Legend on the shortcut menu.

Enlarge the chart area.

Click the Placement tab, and click Bottom.

Within the legend, click Start Date so that it is selected, and then press Delete.

After completing these steps, you should have a chart that looks similar to the example.

To remove blue bars.


Click on blue bar within the chart area, Select the pattern and put the check marks inside “border” – none
ad “area” – none.

You can enlarge the chart area.


For the printing select print pre-view and then “landscape”.