Sie sind auf Seite 1von 8

Hardware, Software Systems and Networks 2

Page 1 of 8

Assignment Intakes

: :

Hardware, Software Systems and Networks 2 UC2F1101IT{ISS}/ UC2F1101IT{NC} / UC2F1101INT / UC2F1101IT{SE} UC2F1101MBT/ UC2F1101IT /

Date Assigned Date Due Lecturer Submission

: : : : Fathin Fakhriah Abdul Aziz Softcopy & Hardcopy

Assignment Overview

Learning Outcomes (Los 1, 3 & 4)

Explain the operation of current LAN & WAN standards, and explain

and apply TCP/IP and associated protocols and application. Explain the operation of programming language translator software

and apply that understanding to the development of suitable components of translator software. Explain the operation of hardware used in multimedia computer

systems and the facilities these provide to multimedia systems.

Scenario

Level 2

Asia Pacific University College of Technology and Innovation

2011

Hardware, Software Systems and Networks 2

Page 2 of 8

Netvalue Public Limited Company has hired your team as IT consultants. This company is the only supplier of business equipment and office supplies in South East Asia. The lack of competition has caused the owners not to make major investments into the business. A nationally recognized competitor recently opened for business with plans to put Netvalue out of business. In response to this, the owners of Netvalue have decided to reinvest substantial sum of money in the company. Netvalues locally own a 4 story building and currently have already grown to a level where they now have resources of 40 staff and this figure is still growing. They have developed and spread their business to 6 strategic locations throughout South East Asia with more upcoming offices in other locations planned for 2012. These new offices will incorporate the retail concept coupled with local sales offices.
1.

Netvalue first project is to develop a local area network. Before they invest money in the network, the owner wants to know more about networks, protocols multimedia and resources, of internet connections, language suitable operation programming

translator applications.
2.

There is a need to set up a network for all the computers in the organization itself. This will include its application servers, print servers and other devices to cater for the growing number of employees and to improve connectivity between branches all around Malaysia. Another reason for them to set up a network is to enable every computer (node) in the office to have internet access by sharing the fast internet connection and proper connectivity to its devices. Prepare and create a proposal for LAN and WAN Design, suitable network devices and finally justify your proposal for Netvalue Public Limited Company.

Level 2

Asia Pacific University College of Technology and Innovation

2011

Hardware, Software Systems and Networks 2

Page 3 of 8

3. Netvalue choosing a suitable programming language is one of the most important decisions an organization has to make when developing custom software. A poor choice can be a costly mistake, resulting in a program that is difficult to maintain, incompatible with other software, unproductive when used, or irreconcilable with existing platforms. The company currently use COBOL and Fortran. Three popular programming languages are C++, Java, and Visual Basic identified. This of the considerations that were outlined in this selecting a programming language was most important. Explain the operation of programming language translator software and apply that understanding to the development of suitable components of translator software.
4.

Netvalue

want

set up office

with approximately

35 to 40

employees. The goal is to determine the type of output devices they will need within the office. Consider the types and number of printers, types and number of display devices, audio devices, microphones, LCD projectors, considerations for the physically challenged, and whether fax machines, fax modem, and/or multifunction peripherals are needed. Finally explain the operation of hardware used in multimedia computer systems and the facilities provide to multimedia systems You are strongly encouraged to produce your own design, diagrams and/or figures in support of the area of research. However, if the information is extracted from external sources, please ensure that proper referencing is provided.

Level 2

Asia Pacific University College of Technology and Innovation

2011

Hardware, Software Systems and Networks 2

Page 4 of 8

Assignment Requirements

1. 2.

You are required to work in groups of three or four. Your report must be typed using Microsoft Word with Times New Roman font size 12. Expected length is from 2,800 to 3,000 words. You need to include a word count at the end of the report. Report should be in 1.5 spacing.

3.

You are required to prepare PowerPoint, print out 6 slides in page and attach it in the last page of the assignment.

4.

As part of project management team, you are required to develop a Gantt chart (project plan) that indicates clearly the activities required in order for the project to be a success.

5.

The report has to be well presented and should be typed. Submission of reports that are unprofessional in its outlook (dirty, disorganised, inconsistent look, varying coloured paper and size) will not fare well when marks are allocated.

6. Ensure that the report is printed on standard A4 (210 X 297 mm) sized paper. Paper weight of 80 grams and above is highly recommended. 7. The report should have a one (1) margin all around the page as illustrated below:

Level 2

Asia Pacific University College of Technology and Innovation

2011

Hardware, Software Systems and Networks 2


1 inch 1 inch

Page 5 of 8

1 inch

The Typed Text 1 inch 1 inch 1 inch 1 inch

8.

The assignment should attach front cover, assignment paper and marking scheme. A transparent plastic sheet can be placed in front of the report to protect the front cover.

9. Plagiarism is a serious offence and will automatically be awarded zero (0) mark.
10.

All information, figures and diagrams obtained from external sources must be referenced using the Harvard referencing system accordingly.

*IMPORTANT* You have to hand in your assignment hardcopy on time with the Coursework Submission and Feedback Form.

Level 2

Asia Pacific University College of Technology and Innovation

1 inch

2011

Hardware, Software Systems and Networks 2

Page 6 of 8

Check List for Assignment Requirements and Guidelines for the Report Please include the following marking grid as part of your hardcopy submission. Names and ID of group members: 1. 3. Group Leader Member 2. Member 4. Member

Your completed documentation should include the following: a. b. c. d. e. f. g. h. i. j. k. l. m. n. o.


Level 2

Group Work Word Documents Report print in A4 Sized paper Appropriate Words Length (< 3000) Front Cover Table of Contents Abstract Work Breakdown Structure (breakdown of tasks among the members) Introduction Chapter / Sections Conclusion Minutes of mandatory meetings References Marking Scheme PowerPoint Slide
Asia Pacific University College of Technology and Innovation 2011

Hardware, Software Systems and Networks 2

Page 7 of 8

p.

Gantt chart

Level 2

Asia Pacific University College of Technology and Innovation

2011

Hardware, Software Systems and Networks 2

Page 8 of 8

Marking Scheme for Group and Individual Criteria Marks allocate d Group Work (40%) Documentation & Report Content Meet Criteria Requirement References Individual Work (60%) Presentation Research and Critical Evaluation Analysis Reflection 20 15 5 1 10 25 15 10 2 3 4 Marks awarded

You are to present the above to your module lecturer in week 12 onwards. Failure to attend the presentation will mean a mark of zero. A hard copy of the slide printouts are to be submitted to the lecturer during the presentation together with a team work report in addition to the copy available in the documentation.

Level 2

Asia Pacific University College of Technology and Innovation

2011

Das könnte Ihnen auch gefallen