Sie sind auf Seite 1von 2

Electromechanical Equipment Lot No27 - Bidding Documents BUON KUOP Hydropower Project

Section I - INVITATION FOR BIDS (IFB)

The ELECTRICITY OF VIETNAM (EVN) represented by the Hydropower Project Management Unit
No.5 (HPPMU No.5) (hereinafter referred to as “the Employer”) invites sealed Bids for the supply of the
Electromechanical Equipment for the following Project:
1. Name of Project
Buon Kuop Hydropower Project
2. General information of the Project
The project with installed capacity of 2x140MW, located on the Srepok river, 350 km north-east of
Ho Chi Minh City. The main role of the project is generating electricity and supplying the power to
the central power system of Vietnam after the year 2008.
3. Scope of supply
Scope of supply for this package shall comprise:
- For the goods offered from abroad:
The design; manufacturing; supplying of equipment, necessary materials and spare parts; factory
testing; finishing; painting; seaworthy packing for export; insuring; shipping to the Ports of Ho
Chi Minh City.
- For the goods offered from within Employer’s country:
The design; manufacturing; supplying of equipment, necessary materials and spare parts; factory
testing; finishing; painting; packing; inland transportation with insurance; delivery to the Buon
Kuop Powerhouse.
- Technical services:
Providing necessary information for designing of civil work relating to electromechanical
equipment; qualified personnel for instructing and supervising to the site erection, necessary
adjustment, modification, site testing and commissioning until completion, preparation of
relevant as-built drawings, training; directing Employer’s personnel during the Reliability Test
Run.
Scope of supply for this package shall cover - to make a complete Package so as to ensure a normal
operation of the Power Plant for generating electricity to the National Power Grid - but not limited
to:
• Two Generating units and related valves;
• Auxiliary mechanical equipments;
• Power house conveying systems;
• Electrical and control equipments;

• 220/110kV Switchgears and power transformers;


• Spare parts.
4. Source of Funds
Bidders who offer goods originated from OECD’ member countries and China are not required to
arrange the finance for the package. EVN will arrange an Export Credit Agency (ECA) backed
finance to fund for this package.

PECC 2 Vol 1: Commercial document


Section I: Invitation for Bids
1
Electromechanical Equipment Lot No27 - Bidding Documents BUON KUOP Hydropower Project

Bidders who offer goods originated from outside of OECD’ member countries and China are
required to arrange the finance for the package based on their own credit terms or through an ECA
in the form of Supplier or Buyer Credit. The Loan agreement shall be guaranteed by the Ministry of
Finance of Vietnam.
According to the authorization of the Employer, The HPPMU No.5 now invites sealed bids from eligible
Bidders for the supply of Electromechanical Equipments and Technical Services under this package.
Interested eligible Bidders may obtain further information from and inspect the bidding documents at the
office of the Employer with the following address:

ELECTRICITY OF VIETNAM

Hydro Power Project Management Unit No.5

Truong Chinh Street, Buon Ma Thuot City, DakLak Province - VIETNAM

Tel.: (84-50)-850 729

Fax.: (84-50)-850 637


A complete set of bidding documents may be purchased by interested Bidders upon payment of a
nonrefundable fee of USD 500 (five hundred United State Dollars) from 7h30 am to 4h30 pm
Vietnamese Standard Time from October 28, 2004 at the above address.
Bidders or their designated representatives are invited to attend the pre-bid meeting at 9h00 Vietnamese
Standart Time on November 30,2004 at the office of the Employer and a official site visit on November
30,2004, immediately arranged after the meeting.
Bids must be delivered to the above address on or before 11h00 Vietnamese Standard Time on January
26, 2005 (called deadline for submission of bids). Bids shall remain valid for the period of 180 days
reckoned from deadline for submission of bids.
Bids must be accompanied by a security of USD1,000,000 (One million United State Dollars) and must
be submitted with the Bid, not sent separately and shall remains valid for a period of 210 days reckoned
from deadline for submission of bids.
Bids will be opened in the presence of bidders’ representatives who choose to attend at 13h00 on
January 26, 2005 at the office of the Employer.

Date: October 27 , 2004


FOR AND ON BEHALF OF THE EMPLOYER

Nguyen Cuong Lam


Director
Hydropower Project Management Unit No.5