Beruflich Dokumente
Kultur Dokumente
Wang Sicheng W Si h
Energy Research Institute, NDRC Sep. 20, 2011 Dhaka
PV Market in China
Type of PV Systems
Rural Electrification
Power Supply Construction for Un electrified Power Un-electrified Regions, 15MW of PV installed in 2010. Annual demand is about 10-15MW
Independent power and capacity High efficiency (>75%) Long lifetime (>20yr, >10000 circles) L lif ti ( 20 10000 i l ) Deep discharge ability
Customized Solutions
10s kW class VRB-ESS VRB ESS
Off-grid power supply for remote area Telecom station use
MW class VRB-ESS
large scale renewable energy grid connection (wind farm)
2000W
6MW of PV installed in 2010 for industry and communication utilization. Annual demand in this field is about 5-8MW.
Solar Products
Torch
watch
Keychains
1W LED
10W LED
Constant Current Source Input Voltage: DC 9-18V,AC 200-300V Max. Current1.5AMax. Power20W Accuracy2% Accuracy2% Power Factor> 90%
50W LED
100W LED
Ourproductseries
Lamp100W, SolarPanel:200Wp~400Wp, roadwidth12m d idth 12
Lamp 80W,
10m SolarPanel:160Wp~400Wp, roadwidth10m road width 10m
Lamp 60W,
8m SolarPanel:120Wp~300Wp, roadwidth8m
Lamp 50W,
6m SolarPanel:100Wp~250Wp, roadwidth6m
BIPV
BAPV
Grid-Connected PV LS-PV)
63 LS-PV plants, ranged from 1MW to 20MW, have been installed by the end of 2010. Total capacity in this field is 406MW. 406MW
Sanan Opto-electronics built 1MW HCPV Power Plant at Germu, Qinghai Province.
Investor: Gansu Electric Power Investment Co. Technology: Anhui Yingtian New Energy Co.
4x LCPV, Finished in Jan., 2010, 2010 50kW for each tracker and 20 trackers in totally.
PV - Fish Pool
Grid-Tied
Installed PV (MW) d
2008
2009
2010
15 6
2.9 29 1.2
72.0 72 0 43.0
8.9 89 5.3
3 4 5 6
Government Supported Project (1) Concession Bidding for LS-PV in Western China Sponsored by National Energy Administration (NEA)
The First Concession Bidding for LS-PV: LS PV:
Dunhuang 10MW LS-PV plant in March of 2009. 13 companies attended the bidding China Guangdong Nuclear Power Group (ZGH) won the bid with offered FIT of 1.0928 Yuan/kWh. 2 of 10MW PV power plants were installed by ZGH and Guotou Huajing in 2010. 2010
The concession bidding for LS-PV will continue until the standard FIT comes out.
1National FIT for PV was released in July, 2011 21.15 Yuan/kWh for the projects finished before the end of 2011 31.0 Yuan/kWh for the projects finished after Dec Dec. 31, 2011
140 120 100 80 60 40 20 0 2006 2007 2008
RE 2006 2.266 0.247 0.001 0 001 0.001 0.076 0.012 2.603 2006 2.603 0.204 0.127 19.998 2007 26.667 19.668 07.10-08.06 20087-12 14.78 3.8 0.023 0 023 1.409 0.17 0.576 20.757 2008 40.514 2.178 0.241 1.156 33.501 2009 74.550 2.609 0.301 1.539 41.049 2010 122.845 29.927 36.601 20091-6 20097-12 20101-9 68.425 16.103 0.459 0 459 2.954 0.451 3.742 92.134 2011 160.000
2009
2010
The subsidy of FIT to LS-PV is coming g from the additional charge to the electricity consumed in whole China. 0.4 cents added to each kWh. 11 billion Yuan can be collected in 2010.
That is already not enough to cover the subsidy to wind, biomass power and PV.
Third Phase: Started in Jan., 2011; 10MW is the applied cap for each province; pp p p ; Subsidy: 50% for the PV modules and inverters and 6 Yuan/Wp for system integration; Mainly focus on BIPV and total approved capacity is around 120MW.
Annual Installation20GW1-2GW 2011-2015, 3-5GW 2016-2020. Annual Installation30-50GW1-2GW 2011-2015, 5-10GW 2016-2020