OML UPGRADE Phase 1 Project

ENGINEERING, PROCUREMENT AND CONSTRUCTION OF OPERATION AND SECURITY CAMPS (OSC)

WORK PACKAGES- Work Break Structure


. .

TOTAL E & P NIGERIA LIMITED OML 58 UPGRADE Phase 1 Project Obagi Operation and security Camps (OSC) EPC OF OPERATION AND SECURITY CAMPS

WORK PACKAGES BREAKDOWN STRUCTURE


WP.1 WP.2 WP.3 WP.4 WP.5
ONLY) PRELIMINARIES SURVEY / ENGINEERING

MANAGEMENT, PROJECT CONTROL AND ADMINISTRATION PROCUREMENT, SUPPLY & TRANSPORTATION (OPERATION .AND SECURITY CAMPS ONLY) CONSTRUCTION (OPERATION AND SECURITY CAMPS

WP.6 WP.7 WP.8 WP.9

OBAGI BASE CAMPS- DECOMMISSIONNING & DEMOLITION MOPOL CAMP DECOMMISSIONNING AND DEMOLITION EPC OF OSC HELIPAD AREA OSC SERVICES TO COMPANY

WP.10 WP.11 WP.12


(O.F.S)

OSC CONSTRUCTION CAMP DECOMMISIONNING AND REMOVAL OSC- SAFETY ACTION IMPLEMENTATIONEPC EPC OF COVERED WALKWAY TO OBAGI FLOW STATION

1|Page

TOTAL E & P NIGERIA LIMITED OML 58 UPGRADE Phase 1 Project Obagi Operation and security Camps (OSC) EPC OF OPERATION AND SECURITY CAMPS

WP.1

PRELIMINARIES

1. Mobilisation 2. Site installation 3. Disposals 4. Facilities / Temporary work / Temporary Utilities / Services 5. Construction camp : Operation and maintenance 5.1 5.2 5.3 5.4 5.5 Administration and operation Catering and laundry service Maintenance Clearing Waste disposal

6. Site / Plant / Camp Access and Transport 7. Equipment and Material 8. Interfaces 9. Pre- commissioning / Commissioning 10. 11. 12. 13. 14. 15. 16. 17. 18. 19.
2|Page

Work at or after completion Material and work generally Samples / Approvals Mock Up Accuracy / Setting out generally Service generally Security Protect against the following Protect the following Specific limitation on Method / Sequence / Timing.

TOTAL E & P NIGERIA LIMITED OML 58 UPGRADE Phase 1 Project Obagi Operation and security Camps (OSC) EPC OF OPERATION AND SECURITY CAMPS

WP.2 SURVEY / ENGINEERING


1. Survey by contractor 2. Detailed Engineering 2.1 OCS New Facilities

2.1.1 Civil, Structure and External Works 2.1.2 Structure 2.1.3 Architecture 2.1.4 Electrical Works 2.1.5 Mechanical & Piping 2.1.6 HVAC 2.1.7 Plumbing 2.1.8 Telecommunications 2.1.9 Instrumentation 2.1.10 2.1.11 2.1.12 2.1.13 2.2 HSC Pre- commissioning and commissioning Maintenance PJM ( Project Management ) Documents

Decommissioning and Demolition of the Obagi Base

Camp 2.3 2.4 Decommissioning and Demolition of Mopol Camp Helipad

3. Construction Engineering 4. Operation and maintenance Engineering 5. Final Documentation

3|Page

TOTAL E & P NIGERIA LIMITED OML 58 UPGRADE Phase 1 Project Obagi Operation and security Camps (OSC) EPC OF OPERATION AND SECURITY CAMPS

WP.3 MANAGEMENT, PROJECT CONTROL, ADMINISTARTION

1. Management of the works


1.1 1.2 1.3 1.4 Management General Programme / Progress / Reporting CONTRACTINR Personnel

2. Nominated MANUFACTURERS and sub CONTRACTORS

4|Page

TOTAL E & P NIGERIA LIMITED OML 58 UPGRADE Phase 1 Project Obagi Operation and security Camps (OSC) EPC OF OPERATION AND SECURITY CAMPS

WP.4

PROCUREMENT, SUPPLY & TRANSPORTATION (OPERATION .AND SECURITY CAMPS ONLY) 1. General 2. Procurement, Supply and Transportation. 2.1 Purchasing /Expediting / Material Control System/

Forwarding 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 Inspection and testing Supply of Bulk Material Assignment of company Items Operating Consumable and First Bill Supply of Spare Parts VENDORS Assistance Custom clearance Procurement and supply

5|Page

TOTAL E & P NIGERIA LIMITED OML 58 UPGRADE Phase 1 Project Obagi Operation and security Camps (OSC) EPC OF OPERATION AND SECURITY CAMPS

WP.5 CONSTRUCTION (OPERATION AND SECURITY CAMPS ONLY)

. 5.1 Operation Camp .5.2 Security Camps


5.1

Operation Camp
5.1.1.1 Engineering 5.1.1.2 Site Documentation 5.1.1.3 Workshop and Fabrication Activities 5.1.1.4 Construction Activities 5.1.1.5 Interface and Coordination Activities 5.1.1.6 Electrical and instrumentation Activities 5.1.1.7 Full Pre- Commissioning and commissioning & Start up 5.1.1.8 Hand over

5.1.1 General

5.1.1.9 Responsibility 5.1.1.10 Warranty 5.1.1.11 Quality Assurance 5.1.2 Site preparation 5.1.3 Site Access and Roads 5.1.4 Earthworks 5.1.5 Roads, kerbs, car parks, infrastructures, technical plants, lighting plinths 5.1.6 Drainage above and below ground/ networks 5.1.7 Sewerage disposal treatment
6|Page

TOTAL E & P NIGERIA LIMITED OML 58 UPGRADE Phase 1 Project Obagi Operation and security Camps (OSC) EPC OF OPERATION AND SECURITY CAMPS

5.1.8 Buried works / networks 5.1.9 Water supply networks 5.1.10 5.1.11 5.1.12 5.1.13 5.1.14 Fire water loop Boreholes Landscaping Fences and gates Operation camps and security camps construction

works 5.1.14.1 Civil and structure 5.1.14.1.1 Footing and Foundation 5.1.14.1.2 Civil and structure 5.1.14.1.3 Structural Steel framing works 5.1.14.1.4 Masonry : Brick / Block walling works 5.1.14.2 Architecture 5.1.14.2.1 Covering , Roofing and waterproofing 5.1.14.3 Cladding / Rain screen 5.1.14.4 External Joinery 5.1.14.5 Internal Joinery 5.1.14.6 Lining. Light dry partitions, movable partition and insulation 5.1.14.7 Insulation 5.1.14.8 Ceilings 5.1.14.9 Surface preparation and paint 5.1.14.10 5.1.14.11 5.1.14.12 5.1.14.13
7|Page

Walls and Floors ceramic tilling PVC flooring Special floors finishes False / Raised floors

TOTAL E & P NIGERIA LIMITED OML 58 UPGRADE Phase 1 Project Obagi Operation and security Camps (OSC) EPC OF OPERATION AND SECURITY CAMPS

5.1.14.14 5.1.14.15 5.1.14.16 5.1.14.17 5.1.14.18 5.1.14.19 5.1.14.20 5.1.14.21

Building Equipment Balustrades / walkways/ staircase Sanitary appliance and fittings Signage Loose Furniture Restaurant , Kitchen, Laundry, equipment Kitchen / small catering equipment Electrical works Purpose General Scope of work

5.1.14.21.1 5.1.14.21.2 5.1.14.21.3

5.1.14.21.3.1 HV Distribution 5.1.14.21.3.2 HV/LV transformer 5.1.14.21.3.3 LV Distribution 5.1.14.21.3.4 Cable trays, conduits and trunking. 5.1.14.21.3.5 UPS Distribution 5.1.14.21.3.6 Lighting / Small power and welding socket system 5.1.14.21.3.7 Earth and lightning Protection system

5.1.14.22 HAVC Works 5.1.14.22.1 Purpose 5.1.14.22.2 Reference documents 5.1.14.22.3 Scope of work 5.1.14.22.4 Contractor responsibility 5.1.14.22.4.1 Responsibility matrix 5.1.14.22.5 Contractor Bulk material
8|Page

TOTAL E & P NIGERIA LIMITED OML 58 UPGRADE Phase 1 Project Obagi Operation and security Camps (OSC) EPC OF OPERATION AND SECURITY CAMPS

5.1.14.23

Plumbing Works

5.1.14.23.1 Purpose 5.1.14.23.2 Scope of work 5.1.14.23.2.1 Cold water / portable water networks 5.1.14.23.2.2 Hot water production distribution networks 5.1.14.23.2.3 Drainage network 5.1.14.23.2.4 Rain water Evacuation network 5.1.14.23.2.5 Garden watering system/ landscaping 5.1.14.23.2.6 Car wash area 5.1.14.23.2.7 Water Properties 5.1.14.23.2.8 Design Criteria 5.1.14.23.2.9 Supply and distribution of hot and cold water 5.1.14.23.2.10 Pipes: Type Installation Testing.

5.1.14.23.3 Contractor Bulk material

5.1.14.24

Mechanical works

5.1.14.24.1 Diesel Generators 5.1.14.24.2 2 Fuel tanks , and associated works 5.1.14.24.3 Borehole pumps 5.1.14.24.3.1 5.1.14.24.3.2 General Bore hole Pumps : Scope of works

5.1.14.25
9|Page

Incinerator Package

5.1.14.25.1 General

TOTAL E & P NIGERIA LIMITED OML 58 UPGRADE Phase 1 Project Obagi Operation and security Camps (OSC) EPC OF OPERATION AND SECURITY CAMPS

5.1.14.25.2 Scope of supply and service 5.1.14.26 Water treatment package

5.1.14.26.1 General 5.1.14.26.2 Scope of supply and service 5.1.14.27 Sewage treatment Package

5.1.14.27.1 General 5.1.14.27.2 Scope of supply and service 5.1.14.28 Telecommunication Works

5.1.14.28.1 Introduction 5.1.14.28.2 Purpose 5.1.14.28.3 General requirement 5.1.14.28.4 Power supply 5.1.14.28.5 Bounding and grounding 5.1.14.28.6 Equipment earthing 5.1.14.28.7 Cable earthing 5.1.14.28.8 Lightning protection 5.1.14.28.9 Area classification and gas detection system 5.1.14.28.10 System interfaces 5.1.14.28.11 Telecommunication system description 5.1.14.28.11.1 5.1.14.28.11.2 5.1.14.28.11.3 5.1.14.28.11.4 5.1.14.28.11.5 5.1.14.28.11.6 5.1.14.28.11.7
10 | P a g e

PAGA system Telephony system LAN/ Data system Aero VHF radio System Operation VHF Radio System MF/HF SSB Radio system INMARSAT System

TOTAL E & P NIGERIA LIMITED OML 58 UPGRADE Phase 1 Project Obagi Operation and security Camps (OSC) EPC OF OPERATION AND SECURITY CAMPS

5.1.14.28.11.8 5.1.14.28.11.9

Entertainment system CCTV System

5.1.14.28.11.10 Fibre optic System 5.1.14.28.11.11 Cat 6 cabling system 5.1.14.28.11.12 Access control system 5.1.14.29 Technical system

5.1.14.30 Fire detection equipment 5.1.14.30.1 Purpose 5.1.14.30.2 Scope of work 5.1.14.30.2.1 Detectors 5.1.14.30.2.2 Cables 5.1.14.30.2.3 Conduits 5.1.14.30.2.4 Manual call points 5.1.14.30.2.5 Audible alarm device 5.1.14.30.2.6 Response indicator 5.1.14.30.2.7 Fire alarm control panel 5.1.14.31 Fire fighting equipments 5.1.14.31.1 Scope of work 5.1.14.31.2 Scope of supply and service 5.1.14.32 Squash court 5.1.14.32.1 Scope of work 5.1.14.33 Football Pitch

5.1.14.33.1 Scope of work

5.2

Security Camps
5.2.1.1 Engineering 5.2.1.2 Site Documentation

5.2.1 General

11 | P a g e

TOTAL E & P NIGERIA LIMITED OML 58 UPGRADE Phase 1 Project Obagi Operation and security Camps (OSC) EPC OF OPERATION AND SECURITY CAMPS

5.2.1.3 Workshop and Fabrication Activities 5.2.1.4 Construction Activities 5.2.1.5 Interface and Coordination Activities 5.2.1.6 Electrical and instrumentation Activities 5.2.1.7 Full Pre- Commissioning and commissioning & Start up 5.2.1.8 Hand over 5.2.1.9 Responsibility 5.2.1.10 Warranty 5.2.1.11 Quality Assurance 5.2.2 Site preparation 5.2.3 Site Access and Roads 5.2.4 Earthworks 5.2.5 Roads, kerbs, car parks, infrastructures, technical plants, lighting plinths 5.2.6 Drainage above and below ground/ networks 5.2.7 Sewerage disposal treatment 5.2.8 Buried works / networks 5.2.9 Water supply networks 5.2.10 5.2.11 5.2.12 5.2.13 Fire water loop Boreholes Landscaping Fences and gates

WP.6

OBAGI BASE CAMPS- DECOMMISSIONNING & DEMOLITION


Summary Description
12 | P a g e

TOTAL E & P NIGERIA LIMITED OML 58 UPGRADE Phase 1 Project Obagi Operation and security Camps (OSC) EPC OF OPERATION AND SECURITY CAMPS

The Obagi COMPANY existing base camp demolition work ( Phase 2 of the work ) shall consists in a complete dismantling and demolition of the existing base camp, including all buried works and services, except the telecom tower and adjacent building. Summary Description CONTRACTOR shall demolish the structure in a safe manner and shall take all measure to protect his personnel and COMPANYs staff. He shall remain solely responsible for any accident arising and consequences thereof.

MOPOL CAMP DECOMMISSIONNING AND DEMOLITION

WP.7

Summary Description The existing Obagi Mopol camp demolition Work (Phase 4 of the Work) Shall consist of complete dismantling and demolition of the Mopol camp, including all buried works and service. Summary Description CONTRACTOR shall demolish the structure in a safe manner and shall take all measure to protect his personnel and COMPANYs staff. He shall remain solely responsible for any accident arising and consequences thereof.

WP.8

EPC OF OSC HELIPAD AREA

13 | P a g e

TOTAL E & P NIGERIA LIMITED OML 58 UPGRADE Phase 1 Project Obagi Operation and security Camps (OSC) EPC OF OPERATION AND SECURITY CAMPS

Contractor shall carry out all necessary topographical survey of the area to facilitate the design of the helipad. Contractor shall also carry out any other study or survey required to design the Helipad as stipulated in the COMPANY Specification. CONTRACTOR shall design the Helipad based on relevant nation standards, regulations and codes that exist. In case of lack of obligatory local national standards, international norms and standards shall be applied. CONTRACTOR shall design the following aspects of the Helipad and submit in the form of drawings and documents for COMPANY and relevant authority approval. Construction of Helipad: The final topographical level for the site shall be achieved in the decommissioning and demolition phase of construction camp and Mopol camp to satisfy the design requirement of the Helipad.

WP.9
14 | P a g e

OSC SERVICES TO COMPANY

TOTAL E & P NIGERIA LIMITED OML 58 UPGRADE Phase 1 Project Obagi Operation and security Camps (OSC) EPC OF OPERATION AND SECURITY CAMPS

9.1

Operation Camp 9.1.1 9.1.2 General Reference documents

9.2 9.3 9.4 9.5 9.6 9.7 9.8 9.9

Service and facilities to company Catering service Laundry Services Cleaning Services Maintenance Fuel generators Medical Services Fire Services

9.10 Communications 9.11 COMPANY Vehicles 9.11.1 9.11.2 9.11.3 9.11.4 Bikes Waste disposal Additional service to COMPANY Services to COMPANY at CONTRACTORs Engineering office.

WP.10 OSC CONSTRUCTION CAMP DECOMMISIONNING AND REMOVAL

15 | P a g e

TOTAL E & P NIGERIA LIMITED OML 58 UPGRADE Phase 1 Project Obagi Operation and security Camps (OSC) EPC OF OPERATION AND SECURITY CAMPS

The Obagi- COMPANYs existing Construction Camp demolition ( Phase 3 of the WORK) shall consists in a complete decommissioning , dismantling and demolition of the existing Construction Camp, including all buried works and services, roads, kerbs, and perimeter precast fence in order to allow construction of HELIPAD. All contractors carrying out the Demolition work must be DPR certified and approved.

WP.11 OSC- SAFETY ACTION IMPLEMENTATIONEPC


CONTRACTOR shall assign as part of their HSE Management, personnel skilled in the environment field (CV to be submitted to COMPANY). CONTRACTOR shall organise and implemental awareness training of his personnel. Regular environmental audit by COMPANY will be scheduled and implemented. CONTRACTOR shall provide an organisation capable of providing assistance to construction and pre- commissioning team at any stage of the CONTRACTOR. CONTRACTOR shall provide, as a minimum, a SITE HSE manager, a safety and Environmental co-ordinator, a work permit administrator, according to the requirements sated in EXHIBITS. CONTRACTOR Shall be fully responsible for the safety and environmental performance of his SUBCONTRACTORS. CONTRACTOR shall comply with the COMPANY requirements. This work covers all the activities with respect to safety. 11.1 Operation Camp 11.2 Safety Improvement program

16 | P a g e

TOTAL E & P NIGERIA LIMITED OML 58 UPGRADE Phase 1 Project Obagi Operation and security Camps (OSC) EPC OF OPERATION AND SECURITY CAMPS

WP.12 EPC OF COVERED WALKWAY TO OBAGI FLOW STATION (O.F.S)


CONTRACTOR Scope of work consists of the Detailed Engineering and Construction of covered walkway connecting the new OSC facility and the flow station facility. The covered walkway shall have design life of 25 years.