Sie sind auf Seite 1von 2

PATTERN COLLECTION: ACCESSORIES

Knit, Relax, Smile, Repeat!

2009 Universal Yarn All rights reserved. www.universalyarn.com This pattern may not be reproduced for business, trade or sale.

MENS STAG HORN HOLIDAY MITTS in CLASSIC WORSTED HOLIDAY

Men' Stag Horn Holiday Mitts

Finished Measurements Width: 4" Length: 6"

SPECIAL TECHNIQUES Built in I-Cord (RS rows): K2. Built in I-Cord (WS rows): Sl 2 pwise wyif.

MATERIALS Yarn: Classic Worsted Holiday by Universal Yarn (79% acrylic, 19% wool, 2% glitter) 100g / 197 yds Color 104 Red Glow, 1 ball Needles: US Size 7 (4.5mm) straight and double pointed needles OR SIZE TO OBTAIN GAUGE Notions: cable needle, waste yarn, yarn needle

MEN'S MITTS Left Mitt: With straight needles, cast on 46 sts. Row 1 (WS): P2, K2, P8, K1, P8, K2, P2, K19, P2. Row 2: Work 2 sts in Built in I-Cord (RS), P19, work 2 sts in Built in I-Cord (RS), work Row 1 of men's mitt patt chart across 21 sts, work 2 sts in Built in I-Cord (RS). Row 3: Work 2 sts in Built in I-Cord (WS), work row 2 of chart across 21 sts, work 2 sts in Built in I-Cord (WS), K19, work 2 sts in Built in I-Cord (WS). Work even in patt as set until piece measures 2" from beg, ending after a WS row. Insert Thumb Next row (RS): Work 2 sts in Built in I-Cord (RS), P2, with waste yarn P5, sl these sts back to LH needle and purl these 5 sts with yarn used for Mitt, continue in patt to end. Continue in patt as set until piece measure 6" from beg, ending after a WS row. Bind off all sts as follows: cast on 1 st, K1, SSK, sl 2 sts back to LH needle, * K1, SSK, sl both sts back to LH needle; rep from * until all sts have been joined, knit last 2 sts on RH needle through back loops and fasten off, leaving a 24" end. Thumb Remove waste yarn and sl 9 live sts to dpns, dividing them evenly. With RS facing, beg at RH side of thumb, join yarn and K5 live sts, pick up and knit 3 sts around thumb opening, K4 live sts, pick up and knit 3 sts around thumb opening to start of rnd. Rnd 1: Knit, dec 3 sts evenly around. Rnd 2: Knit. Rnd 3: Rep Rnd 1. Work even in St st (knit each rnd) on rem sts until thumb measures 1" from pickup. Bind off all sts as for hand. Right Mitt: With straight needles, cast on 46 sts. Row 1 (WS): P2, K19, P2, K2, P8, K1, P8, K2, P2. Row 2: Work 2 sts in Built in I-Cord (RS), work Row 1 of Men's mitt patt chart across 21 sts, work 2 sts in Built in I-Cord (RS), P19, work 2 sts in Built in I-Cord (RS). Row 3: Work 2 sts in Built in I-Cord (WS), work Row 2 of chart, work 2 sts in Built-in I-cord (WS), P19, work 2 sts in Built in I-Cord. Work even until piece measures 2" from beg, ending after a WS row. Insert Thumb Next row (RS): Work 2 sts in Built in I-Cord (RS), work next row of chart across 21 sts, work 2 sts in Built in I-Cord (RS), P14, with waste yarn P5, sl these 5 sts back to LH needle and purl 5 with yarn used for mitt, work in patt to end. Work remaining Thumb same as Left Mitt. FINISHING Using yarn end and mattress stitch, sew side seam, turning one st from built-in I-cord to inside. Weave in ends. Block.

GAUGE 1 rep Men's Mitt patt = 3"; 19 sts and 26 rows = 4". SAVE TIME, CHECK YOUR GAUGE

ABBREVIATIONS beg beginning cn cable needle dec decrease dpns double-pointed needles K knit LH left hand P purl patt pattern pwise purlwise rem remain(ing) Rep repeat RH right hand Rnd round RS right side Sl slip SSK slip, slip, knit st(s) stitch(es) St st stockinette stitch WS wrong side wyif with yarn in front

SPECIAL ABBREVIATIONS C4F: Sl 2 sts to cable needle, hold at front of work, K2, K2 from cable needle. C4B: Sl 2 sts to cable needle, hold at back of work, K2, K2 from cable needle.

Men's Mitt Cable Pattern (Panel of 21 sts) Row 1 (RS): P2, K8, P1, K8, P2. Row 2 (and all even rows): K2, P8, K1, P8, K2. Row 3: Rep Row 1. Row 5: P2, C4F, K4, P1, K4, C4B, P2. Row 7: P2, K2, C4F, K2, P1, K2, C4B, K2, P2. Row 9: P2, K4, C4F, P1, C4B, K4, P2. Row 10: K2, P8, K1, P8, K2. Rep Rows 1-10 for Stag Horn Cable patt.

Das könnte Ihnen auch gefallen