Chapter III
This chapter describes the supplies and materials needed for the
completion of this project. It includes the list of all tools and equipment used in
The quantity, unit, name and description of the supplies and materials
Table 1
Table 1 continued…
3 pc Handles, cabinet
20 pc Screws, wood
Inverter circuit
1 pc Battery, Lead Acid
1 pc Capacitor, 10µf 50V
1 pc Capacitor, 100µf 400V
2 pc Capacitor, 1000µf 25V electrolytic
1 pc Capacitor, 2.2µf 50V
2 pc Capacitor, 20J
1 pc Capacitor,4.7µf 16V
1 pc Capacitor, YIC EC 40000 MHz
1 pr Clip, jumbo alligator black and red
2 pc Diode, detector
4 pc Diode, R560G
1 pc Fuse, 1 Ampere 220V
1 pc Holder, fuse 1 Ampere 220V
1 pc IC, EM78P45APJ-6
3 pc IC, PC817
3 m Lead, soldering 60 x 40
1 pc LED, 5 mm red
1 pc LED, 5mm yellow
1 pc Lamp, pilot 220V 5 Watts
6 pc Resistor, 10Ω ½ Watt carbon
7 pc Resistor, 1k Ω ½ Watt carbon
1 pc Resistor, 1.8k Ω ½ Watt carbon
4 pc Resistor, 10kΩ ½ Watt carbon
2 pc Resistor, 2.2k Ω ½ Watt carbon
1 pc Resistor, 27k Ω ½ Watt carbon
1 pc Resistor, 3.3k Ω ½ Watt carbon
2 pc Resistor, 33k Ω ½ Watt carbon
1 pc Resistor, 330k Ω ½ Watt carbon
3 pc Resistor, 4.7k Ω ½ Watt carbon
1 pc Resistor, 510k Ω ½ Watt carbon
1 pc Rheostat 100k Ω
1 pc Tape, Electrical
7 pc Transistor, Bipolar Junction C1815, NPN
1 pc Transistor, L7805CV Bipolar Junction
15 m Wire, stranded AWG #16
14
Table 1 continued…
Table 2 shows the tools and equipment and their corresponding functions
Table 2
Tools Function
Electric drill drills and bores holes
Screwdriver drives screws
Claw hammer drives finishing nail
Soldering iron solders parts and connections
Long-nose pliers bends and holds wires, holds parts
Side cutting pliers cuts wires and insulation
Crosscut saw cuts wooden parts
Hack saw cuts metals
operate.
Table 3 shows the defect found during the try-out and the revision made to
Table 3
Defect Revision
Loose connection Tighten the loosen connection and
reconnect firmly
Volt meter doesn’t work Checked the connection of the volt
meter and connect if open
No power Checked the fuse and replace a new
one.
Loose threads of cabinet handles Replace a new one.
Table lamp do not lit. Checked the connections and solder the
open wire.
Construction Procedure
PD
PU M A T R
Table 4 shows the activities and time allotment in constructing the project.
Table 4
18
48 hours.
Cost
Table 5 shows the quantity, unit, name and description, and the cost of the
Table 5
As shown in Table 5 shows the total cost of the supplies and materials for
Table 6
Labor Cost
22
Table 7
As depicted in Table7 the overhead cost is Php 363.70 and the operation
cost is Php 545.55 which is 10% and 15% of the cost of supplies and materials
Table 8 reflects the source of cost and the cost per source.
Table 8
23
Php 6,196.25