DETAIL OF MEASUREMENT Name of Work:- Construction of Maanpur Dharampur road km. 0/0 to 7/700 S.No. 1 (Sh.

:- Construction of missing culverts at km 0/760, 2/060, 3/290 and 5/270) Description of Item No Length Breadth Height 2 3 4 5 6 Qty 7

Excavation of earth work and disposal of all excavated earth upto a lead of 20 mtr. and lift upto 1.50 mtr D/S Toe wall U/S Tow wall Catch pit Hume pipe In wing wall 1 1 1x/2 1 2
Total

2.3 2.40 2.40 (3.0+6.60)1/2 3.20

1.25 0.60 1.30 2.30

(0.50+1.70)1/2 2.00 0.20 (1.80+2.00)1/2 (1.50+1.00)1/2

3.16 2.88 1.81 11.86 18.4 38.11 cum 152.43 cum

Total qty of 4 Nos. culvests 2 Providing and laying cement concrete 1:4:8 (One cement four sand, eight graded crushed stone aggregate 40mm Wing wall Total Total qty of 4 Nos. culvests Providing and laying Cement Concrete 1:3:6 (one cement, three sand, six graded crushed stone aggregate 40mm nominal size) Toe wall D/S U/S In catch pit Under pipe Wing walls (i) (ii) (iii) Total Total qty of 4 Nos. culvests 4 Providing and laying Cement Concrete 1:2.5:5 In abutments In tow wall U/S In catch pit

38.11x4

3.20

2.30

0.40

5.89 5.89 Cum 23.55 cum

5.89x4

1 1 1x/2 1 2 2 2

2.30 2.40 2.40 6.60 3.00 3.00 3.00

1.15 0.60 1.30 1.90 (1.85+1.5)1/2 (1.50+0.50)1/2

0.20 0.20 0.20 0.20 0.40 0.40 2.75

29.60x4

0.53 0.29 1.81 1.72 4.56 4.02 16.68 29.60 Cum 118.41 cum

1 1x

3.30 1.43

0.45 0.45

2.00 1.70

2.97 3.42 6.39

Prepared by kutaal 4/20/2012

Page 1

D/S Upto pipe level 1st Step 2nd Step 3rd Step 4th Step 5th Step 6th step Above pipe level in parapets

1 1 1 1 1 1 1 2 2

2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.85 1.85

0.95 0.85 0.75 0.65 0.55 0.45 0.45 0.45 (0.45+0.30)/2

0.30 0.30 0.30 0.30 0.30 0.30 1.95 0.45 0.15

Deduction for pipe

2x

0.50

0.45

Net Qty. after Deduction

Total qty of 4 Nos. culvests 5 Providing and laying (to level for slope) and jointing reinforced concrete light duty non pressure pipes in 1.5 class NP2 i) 900 mm dia 1
Total

10.92x4

6.39 cum 0.57 0.51 0.45 0.39 0.33 0.27 1.76 0.75 0.21 11.63 cum 0.71 0.71 cum 10.92 cum 43.66 cum

7.50

7.5 7.5 Rmt

Total qty of 4 Nos. culvests 6 50 mm thick cement concrete flooring in catch pit 1x
Total

7.50x4

30.00 Rmt

1.20

2.26
2.26 Sqm

Total qty of 4 Nos. culvests 7 Excavation in earth work and banking in 20cm thick layers including breaking clods, ramming 1
Total

2.26x4

9.04 Sqm

6.60 6.65x4

(0.60+0.95)/2

6.65
6.65

Total qty of 4 Nos. culvests 8 Filling behind retaining wall 2


Total

26.60 Cum 0.600 2.15 7.74


7.74

3.00

cum Prepared by kutaal 4/20/2012 Page 2

7 7.74 cum

Total qty of 4 Nos. culvests 9 Providing and fixing 100 mm dia P.V.C. pipe forwall holes. In wing weep

7.74x4

30.96 cum 1.5 1.2 5.8 4.8


10.6

2 2
Total

2 2

Total qty of 4 Nos. culvests

10.60x4

42.40 Rmt or = 43 Nos

Prepared by kutaal 4/20/2012

Page 3

Prepared by kutaal 4/20/2012

Page 4

Prepared by kutaal 4/20/2012

Page 5

= 43 Nos

Prepared by kutaal 4/20/2012

Page 6

ABSTRACT OF COST
Name of Work:- Construction of Maanpur Dharampur road km. 0/0 to 7/700 S.No. (Sh.:- Construction of missing culverts at km 0/760, 2/060, 3/290 and5/270) DESCRIPTION OF ITEM Quantity Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. 152.43 128.15 Cum Rates Unit Amount (Rs.)

19534

Providing and laying cement concrete 1:4:8 (One cement, four sand, eight graded crushed stone aggregate 40mm (forty millimeter) Nominal size) and curing complete including mechanically mixing and vibrating excluding cost of form work including carriage of material with in all lead and lifts In foundation and plinth
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:3:6

23.55

2293.10

Cum

54003

118.41 4
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204

2928.35

Cum

346746

43.66 5
Providing and laying reinforced cement concrete pipe NP2 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection work, back filling, concrete and masonary work in head walls and parapets clause 1108.900mm dia

3170.60

Cum

138428

Cement concrete flooring 1:2:4 (one cement : two sand: four graded crushed stone agg. 20mm nominal size laid in one layer finished with coated neat cement (50 cm thick) Excavation in earth work and banking in 20cm thick layers including breaking clods, ramming and dressing ground for the purpose of making embankment or filling up ground depressions upto a lead of 20 mtr. And lift upto 1.50 mtr. Pick work C/O

30.00 9.04

1975.70 216.20

Rmt Sqm

59271 1954

26.60

56.65

Cum

1507 621443

S.No.

DESCRIPTION OF ITEM Filter material behind retaining wall / breast wall as per Specification 1204.3.8 in a width of 600 m Providing weapholes in brick masonry / stone masonry /plain reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full with of the structures with slop of 1(v):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7

Quantity

Rates

Unit

Amount (Rs.)

30.96

563.90

Cum

621443 17458

43.00

253.70

Nos.

10909

Grand Total
Say `= 6.50 lacs

649811

Addl. Assistant Engineer Baddi Sub Division HPPWD Baddi

Assistant Engineer Baddi Sub Division HPPWD Baddi

5.89

2293.10

Cum

13506

29.61

2928.35

Cum

86708

10.92

3170.60

Cum

34623

7.50 2.26

1975.70 216.20

Rmt Sqm

14818 489

6.65

56.65

Cum

377

7.74

563.90

Cum

4365

11.00

253.70

Rmt

2791

7.50 0.60 Earth Cushion 0.95 1.70 2.00 1.00

3.00

2.00
1.85

3.00

3.55
0.45

0.30 0.30 0.30 0.30 0.30


0.50
1.25

2.40 1.70 L-SECTION

0.55 0.65 0.75 0.85 0.95

1.30

0.30 2.30

0.40

0.50

2.75

1.50

0.40 0.40 0.40 2.30 SECTION OF WING WALL

1.00

3.55

0.40