METHOD STATEMENT EMBANKMENT OF RUNWAY Approved by : EMBANKMENT OF RUNWAY SERIES NO : BHM(GK)/QC/MS/EMB DATE : 10/1/2004 REVISION : 0

1.0 SCOPE OF WORKS The work shall include forming and shaping embankment, slope and closed turfing for runway as per approved construction drawing.(KLPC/161/C/EW/STD/01) 2.0 WORK DESCRIPTION 2.1 Generally the embankment for runway is type 3 according to the construction drawing.(KLPC/161/C/EW/LAY/01) 2.2 The settlement plate and surface marker will be installed before backfilling work for monitoring settlement of the embankment as per drawing. (KLPC/161/C/EW/STD/02) 2.3 Fill material for use in forming embankments shall be suitable material obtained from excavation in cutting or borrow pit. 2.4 Prior to commencement of the works, the selected sample from the source of cutting or borrow pits shall be sent for laboratory test for Proctor Test, moisture content, Atterberg limit and sieve analysis to determine its suitability for forming embankments. 2.5 Trial compaction shall be carried out at the designated area of the site to determine the pattern of compaction for each main type of material to be used. 2.6 Unsuitable material should be removed after stripping topsoil. The Resident Engineer will decide the depth of unsuitable material to be remove depends on site condition. 2.7 After that replace the area with suitable material and compacted properly. 2.8 Every layer should be about 300mm thickness and compacted to 90% of maximum dry density. 2.9 The density test shall be earned out in every compacted layer to comply with BS1377. 2.10 On the fill slope, the filling shall be in layer and with extended width of one meter extra for cut back and formed the compacted slope. 2.11 The slope will be protected with closed turfing to avoid any landslide occurs. 2.12 Allow surcharged minimum 1 .0m thick of extra fill as pre loading for about 3 months after the embankment completed. 2.13 After that the surcharge will be scrapped out from the embankment depends on R.E approval. 2.14 The slope will be protected with closed turfing to avoid any landslide occurs.
RESPONSIBILITY FORM/REF.

SE/CS

N/A

SE/CS

N/A

SE/CS

BHM/GK/ITC/001

LT/COW

N/A

LT/COW

N/A

SE/CS

N/A

SE/CS LT/COW

N/A N/A

LT

QA/BHC/CCT

SE/CS

N/A

SE/CS SE/CS

N/A N/A

RE/SE

BHM/GK/ITC/001

SE/CS

N/A

Page 1

MS-Embankment

METHOD STATEMENT EMBANKMENT OF RUNWAY Approved by : EMBANKMENT OF RUNWAY SERIES NO : BHM(GK)/QC/MS/EMB DATE : 10/1/2004 REVISION : 0

3.0 MATERIALS 3.1 Granular material 3.2 Turfing material

4.0 MACHINERIES 4.1 Excavator 4.2 Compactor 4.3 Back pusher or Back hoe 4.4 Motor grader

Note : RE COW S SE CS LT = = = = = = Resident Engineer Clerk of Work Contractor's Surveyor Contractor's Site Engineer Contractor's Site Supervisor Contrator's Lab Tecnician

Page 2

MS-Embankment

METHOD STATEMENT SUB BASE Approved by : SUB BASE SERIES NO : BHM(GK)/QC/MS/SB DATE : 10/1/2004 REVISION : 0

1.0 SCOPE OF WORKS The work shall include laying of sub base material as per approved specification by the S.O or Construction drawings.

2.0 WORK DESCRIPTION 2.1 Prior to the laying of sub base, the material shall be approved by the S.O' Reprsentative and comply to specifications. 2.2 Ensure the underlaying subgrade have been shaped and compacted in accordance to the specification prior to laying work. 2.3 Sub base shall be placed over full width of formation to a compacted thickness of 250mm by using back pusher. 2.4 Sub base shall be trimmed to the required level, superrelevation and grade using motorgrader. 2.5 Trimmed sub base shall be compacted using vibrator roller to not less than 95% of the maximum dry density.

RESPONSIBILITY

FORM/REF.

RE/SE/CS

N/A

SE/CS

N/A

SE/CS

N/A

SE/CS

N/A

LT/COW

N/A

3.0 MATERIALS 3.1 Sub base material. (Sand or quarry dust)

4.0 MACHINERIES 4.1 Motor Grader 4.2 Back Pusher 4.3 Vibratory Roller 4.4 Water Tanker

Note : RE COW S SE CS LT = = = = = = Resident Engineer Clerk of Work Contractor's Surveyor Contractor's Site Engineer Contractor's Site Supervisor Contrator's Lab Tecnician

Page 3

MS-Sub Base

METHOD STATEMENT ROAD BASE Approved by : ROAD BASE SERIES NO : BHM(GK)/QC/MS/RB DATE : 10/1/2004 REVISION : 0

1.0 SCOPE OF WORKS The work shall include laying of road base material as per approved specification by the S.O or Construction drawings.

2.0 WORK DESCRIPTION 2.1 Prior to the laying of road base, the material shall be approved by the S.O' Reprsentative and comply to specifications. 2.2 Ensure the underlaying sub base have been shaped and compacted in accordance to the specification prior to laying work. 2.3 Road base shall be placed over full width of formation to a compacted thickness of 450mm by using back pusher.

RESPONSIBILITY

FORM/REF.

RE/SE/CS

N/A

SE/CS

N/A

SE/CS

N/A

2.4 Moisture content shall be maintained at the correct moisture content for LT/COW compaction by sprinkling with water from water truck or by open drying as may be necessary. 2.4 Road base shall be trimmed to the required level, superrelevation and grade using motorgrader. 2.5 Trimmed road base shall be compacted using vibrator roller to not less than 95% of the maximum dry density. SE/CS

N/A

N/A

LT/COW

N/A

3.0 MATERIALS 3.1 Sub base material. (Crusher run)

4.0 MACHINERIES 4.1 Motor Grader 4.2 Back Pusher 4.3 Vibratory Roller 4.4 Water Tanker

Note : RE COW S SE CS LT = = = = = = Resident Engineer Clerk of Work Contractor's Surveyor Contractor's Site Engineer Contractor's Site Supervisor Contrator's Lab Tecnician

Page 4

MS-Road Base

METHOD STATEMENT SPRAYING OF PRIMECOAT Approved by : SPRAYING OF PRIMECOAT SERIES NO : BHM(GK)/QC/MS/SPC DATE : 10/1/2004 REVISION : 0

1.0 SCOPE OF WORKS The work shall include spraying of primecoat as per approved specification by the S.O or Construction drawings.

2.0 WORK DESCRIPTION 2.1 The primecoat material shall be cut-back bitumen grade SS-1K conforming to the requirements of MS 159. 2.2 Spraying of primecoat shall only be carried out in dry weather, when the surface to be treated is essentially dry. 2.3 The roadbase surface shall be inspected and approved by S.O's Representative prior to spraying. 2.4 The roadbase shall be swept using the power broom and all debris removed using the compressed air blower. 2.5 Spraying will be performed via pressure distributor to ensure even distribution over the whole surface of the roadbase. 2.6 The primecoat will be left undisturbed for 24 hours after application until cured sufficiently to laying binder course.

RESPONSIBILITY

FORM/REF.

SE/CS

N/A

SE/CS

N/A

RE/SE/CS

N/A

LT/COW

N/A

LT/COW

N/A

SE/CS

N/A

3.0 MATERIALS 3.1 Cut-back bitumen SS-1K

4.0 MACHINERIES 4.1 Power broom 4.2 Compressed air blower 4.3 Pressure distributor for bituminous material 4.4 Storage tanks for bituminous materials

Note : RE COW S SE CS LT = = = = = = Resident Engineer Clerk of Work Contractor's Surveyor Contractor's Site Engineer Contractor's Site Supervisor Contrator's Lab Tecnician

Page 5

MS-Spraying Primecoat

METHOD STATEMENT ASPHALTIC CONCRETE BINDER COURSE Approved by : ASPHALTIC CONCRETE BINDER COURSE SERIES NO : DATE : REVISION :
BHM(GK)/QC/MS/ACBC 10/1/2004 0

1.0 SCOPE OF WORKS The work shall include laying Asphaltic Concrete Binder Course as per requirements of the specification and shall be provided as per approved mix design. 2.0 WORK DESCRIPTION 2.1 A trial area for testing of the binder course shall be prepared in order to demostrate that the mixing, laying and compaction of the binder course conforms to the requirements of the specification. 2.2 This trial area shall be within the limits of the proposed extension runway. 2.3 The proposed methods to be utilised for the trial compaction may be defined as : Type 1 : 2 passes static with tandem roller 2 passes vibrate with tandem roller 8 passes with pneumatic tyre roller 2 passes static with tandem roller 2 passes static with tandem roller 2 passes vibrate with tandem roller 10 passes with pneumatic tyre roller 2 passes static with tandem roller
RESPONSIBILITY FORM/REF.

SE/CS

N/A

SE/CS SE/CS

N/A N/A

Type 2 :

The method which achieves the required compaction will be adopted for the permanent works. 2.4 Laying of binder course shall only be performed in dry weather when the surface to be covered is dry. 2.5 All laying rolling and finishing work shall be carried out during daylight hours unless suitable flood lighting is provided. 2.6 The surface to be covered shall be cleaned prior to laying binder course. 2.7 The binder course shall be transported to the site using tip trucks with covers to protect the asphalt and discharged directly into the hopper of the paver machine. 2.8 Binder course delivered to the site shall have a temperature not less than 125'C. 2.9 The asphaltic concrete paver shall be guided by use of sensor to ensure the binder course is laid to the required thickness and tolerance of uniform surface. 2.10 Laying of the binder course shall commence along the lower side of the carriageway progressing to the higher side and shall not be performed in a downhill direction. 2.11 The binder course shall be laid to achieve the specified thickness and surface profile with a uniform surface texture free from indentations and irregularities. SE/CS N/A

SE/CS

N/A

SE/CS SE/CS

N/A N/A

LT/COW

N/A

LT

N/A

SE/CS

N/A

SE/CS

N/A

Page 6

MS-ACBC

METHOD STATEMENT ASPHALTIC CONCRETE BINDER COURSE Approved by : ASPHALTIC CONCRETE BINDER COURSE SERIES NO : DATE : REVISION : SE/CS
BHM(GK)/QC/MS/ACBC 10/1/2004 0

2.12 Prior to initial rolling, the temperature of the asphalt shall not be less than 110'C.

N/A

2.13 Compaction of the asphalt shall commnece as soon as possible after laying and in strict accordance to the specification. The sequence of compaction by the compaction plant shall adhere to the methods adopted from the trial compaction to achive the required compacted density of 95-100% Marshall density. 2.14 Core samples to determine the compacted layer thickness and compacted density of the asphalt shall be taken after 24 hours of placing asphalt. 2.15 The asphaltic binder course shall not be opened to any trafficking within 4 hours from commencement of rolling.

LT/COW

N/A

LT/COW

N/A

SE/CS

N/A

3.0 MATERIALS 3.1 Binder Course Material

4.0 MACHINERIES 4.1 Asphalt Paver 4.2 Pneumatic Tyre Roller 4.3 Steel Wheeled Tandem Roller

Note : RE COW S SE CS LT = = = = = = Resident Engineer Clerk of Work Contractor's Surveyor Contractor's Site Engineer Contractor's Site Supervisor Contrator's Lab Tecnician

Page 7

MS-ACBC

METHOD STATEMENT SPRAYING OF TACKCOAT Approved by : SPRAYING OF TACKCOAT SERIES NO : BHM(GK)/QC/MS/STC DATE : 10/1/2004 REVISION : 0

1.0 SCOPE OF WORKS The work shall include spraying of tackcoat as per approved specification by the S.O or Construction drawings.

2.0 WORK DESCRIPTION 2.1 The tack coat material shall be rapid setting bitumen emulsion of grade RS-1K conforming to the requirement of M.S 161. 2.2 Spraying of tack coat shall only be carried out in dry weather, when the surface to be treated is essentially dry.

RESPONSIBILITY

FORM/REF.

SE/CS

N/A

SE/CS

N/A

2.3 The pavement surface shall be inspected and approved prior to spraying. 2.4 Spraying will be performed for the whole surface of the binder to be subsequently covered with wearing course. 2.5 The tack coat will be leave undisturbed for 15 to 20 minute after application before laying of wearing course.

RE/SE/CS SE/CS

N/A N/A

SE/CS

N/A

3.0 MATERIALS 3.1 Bitumen emulsion

4.0 MACHINERIES 4.1 Power broom 4.3 Manual portable hand sprayer

Note : RE COW S SE CS LT = = = = = = Resident Engineer Clerk of Work Contractor's Surveyor Contractor's Site Engineer Contractor's Site Supervisor Contrator's Lab Tecnician

Page 8

MS-Spraying Tackcoat

METHOD STATEMENT ASPHALTIC CONCRETE WEARING COURSE Approved by : ASPHALTIC CONCRETE WEARING COURSE SERIES NO : DATE : REVISION :
BHM(GK)/QC/MS/ACWC 10/1/2004 0

1.0 SCOPE OF WORKS The work shall include laying Asphaltic Concrete Wearing Course as per requirements of the specification and shall be provided as per approved mix design. 2.0 WORK DESCRIPTION 2.1 A trial area for testing of the wearing course shall be prepared in order to demostrate that the mixing, laying and compaction of the wearing course conforms to the requirements of the specification. 2.2 This trial area shall be within the limits of the proposed extension runway. 2.3 The proposed methods to be utilised for the trial compaction may be defined as : Type 1 : 2 passes static with tandem roller 1 passes vibrate with tandem roller 9 passes with pneumatic tyre roller 2 passes static with tandem roller 3 passes static with tandem roller 1 passes vibrate with tandem roller 8 passes with pneumatic tyre roller 2 passes static with tandem roller
RESPONSIBILITY FORM/REF.

SE/CS

N/A

SE/CS RE/SE/CS

N/A N/A

Type 2 :

The method which achieves the required compaction will be adopted for the permanent works. 2.4 The paver shall be guided by use of long beam with sensor to ensure the wearing is laid to the required thickness and unifomity. 2.5 The wearing course shall be laid to achieve the specified thickness and surface profile with a uniform surface texture free from indentation and irregularities. 2.6 Prior to initial rolling, the temperature of the asphalt shall not be less than 110'C. 2.7 The paver shall be operated continuosly as for as is practicable with continuous supply. 2.8 Compaction of the asphalt shall commence as soon as possible after laying and in strict accordance to the specification. The sequence of compaction by the compaction plant shall adhere to the methods adopted from the trial compaction to achieve the required compacted density of 98-100%. SE/CS N/A

SE/CS

N/A

SE/CS

N/A

SE/CS

N/A

LT

N/A

2.9 Core sample to determine the compacted layer thickness and compacted SE/CS density of the wearing course shall be taken after 24 hours placing the wearing.

N/A

Page 9

MS-ACWC

METHOD STATEMENT ASPHALTIC CONCRETE WEARING COURSE Approved by : ASPHALTIC CONCRETE WEARING COURSE SERIES NO : DATE : REVISION : SE/CS
BHM(GK)/QC/MS/ACWC 10/1/2004 0

2.10 The wearing course shall conform to the specification for the thickness tolerance. 2.11 The wearing shall not be opened to any traffic within 6 hours from commencement of rolling.

N/A

SE/CS

N/A

3.0 MATERIALS 3.1 Wearing Course Material

4.0 MACHINERIES 4.1 Asphalt Paver 4.2 Pneumatic Tyre Roller 4.3 Steel Wheeled Tandem Roller

Note : RE COW S SE CS LT = = = = = = Resident Engineer Clerk of Work Contractor's Surveyor Contractor's Site Engineer Contractor's Site Supervisor Contrator's Lab Tecnician

Page 10

MS-ACWC