Sie sind auf Seite 1von 32

Alcatel-Lucent GSM

Create Extended Cells

BTS Document Reconfiguration Method Release B10

3BK 17430 0845 RJZZA Ed.05

BLANK PAGE BREAK

Status Short title

RELEASED MPI84 / MDR5


All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel-Lucent.

2 / 32

3BK 17430 0845 RJZZA Ed.05

Contents

Contents
Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1 Presentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.1 Cases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.2 Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.3 Restrictions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.4 Grouped Task Sequence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.2 Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.2.1 Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.2.2 Site Specific Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.2.3 External Tasks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.3 Scheduling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.4 Telecom/Supervision Outage and Operating Impact . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.5 Resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.5.1 Tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.5.2 Supplies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.5.3 Applicable Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Scenario . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.1 Before Going Onsite . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.2 Before You Start . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.2.1 Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.2.2 Required Knowledge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3 Scenario Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.1 Initial Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.2 Create Backup PRC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.3 Modify Logical Parameters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.4 Start Traffic on Extended Cell . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.5 Call Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.6 Create Adjacencies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.7 Final Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4 Reverse Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4.1 Lock Cells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4.2 Restore Logical Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4.3 Unlock Cells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4.4 Call Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4.5 Final Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 9 10 10 10 10 11 12 12 12 12 13 15 16 16 16 16 17 18 19 19 19 20 20 20 21 28 28 29 29 30 30 30 31 31 31

3BK 17430 0845 RJZZA Ed.05

3 / 32

Contents

4 / 32

3BK 17430 0845 RJZZA Ed.05

Preface

Preface
Purpose
This document describes how to create extended cells on an 9100 BTS. This method applies to BSS and OMC-R at technical release B10.

Whats New

In Edition 05
Improve Presentation (Section 1.1) due to 3 extended cells allowance on BTS and Multiple CCCH support.

In Edition 04
Update with the new equipment naming.

In Edition 03
Restriction 3BKA20FBR230654 added in Create Adjacencies (Section 2.3.6).

In Edition 02
Delivered in release. Update in Applicable Documents (Section 1.5.3) First official release of the document for B10 MR2.

In Edition 01
Overall document quality was improved following an editorial review. The following sections were updated: Create Extended Inner (Section 2.3.3.2) Create Extended Outer (Section 2.3.3.3). Start Traffic on Extended Cell (Section 2.3.4) First official release of the document for B10.

Audience

This document is intended for: Field service technicians Specialists

3BK 17430 0845 RJZZA Ed.05

5 / 32

Preface

Project managers Foremen.

6 / 32

3BK 17430 0845 RJZZA Ed.05

Preface

Assumed Knowledge

You must have a basic understanding of the following: Planning: Network architecture and reshuffling principles Scheduling. Implementation: Alcatel-Lucent operations and maintenance concepts for the BSS 9153 OMC-R operation Equipment (BSC, BTS, MFS) hardware configurations Windows environment.

3BK 17430 0845 RJZZA Ed.05

7 / 32

Preface

8 / 32

3BK 17430 0845 RJZZA Ed.05

1 Overview

1 Overview
This Overview gives information needed by project managers and foremen, for presentation to the customer and for site planning.

3BK 17430 0845 RJZZA Ed.05

9 / 32

1 Overview

1.1 Presentation
This scenario describes how to create and configure extended cells. The maximum range defined in GSM for the access to a cell is 35 km. The goal of an extended cell is to increase the maximum distance between the BTS and the MS, without changing the Air interface, to 70 km. Two different cells are combined in order to create the extended cell. One cell (Extended Inner) covers the range from 0 to 35 km and another cell (Extended Outer) covers the range from 35 to 70 km. According to the engineering rules: For 9100 BTS, the extended cell allows for several non -hopping TRXs Extended cells are supported only on 9100 BTS with SUMA LCS is supported on extended cells GPRS is supported on extended cells Both GSM and DCS frequency bands are allowed for extended cells 3 extended cells per BTS are allowed: 3 times (inner + outer) Multiple CCCH is not supported in Extended Cell.

1.1.1 Cases
The following cases apply: C1: Create Extended Cell C1.1: Create Extended Inner Cell C1.2: Create Extended Outer Cell. C2: Modify Single Cell to Extended Cell C2.1: Modify Single Cell to Extended Inner Cell C2.2: Modify Single Cell to Extended Outer Cell.

Note:

You can combine different cases to create the required configuration: To create an complete Extended Cell, use a combination of C1.1and C1.2 If one cell is already created, use a combination of C1.1 and C2.2 or C1.2 and C2.1 If both cells must be modified, use a combination of C2.1 andC2.2.

1.1.2 Options
O1: GPRS on extended cell can apply.

1.1.3 Restrictions
None.

10 / 32

3BK 17430 0845 RJZZA Ed.05

1 Overview

1.1.4 Grouped Task Sequence


The following figure shows the grouped task sequence for this scenario.

MSC

OMCR
Initial Checks

BTS

Create Backup PRC

Create Working PRC

Create Extended Inner Cell

Create Extended Outer Cell

Check Working PRC

Start Trafiic on Extended Cell

Call Tests

Create Adjancencies

Final Checks

3BK 17430 0845 RJZZA Ed.05

11 / 32

1 Overview

1.2 Preparation
1.2.1 Prerequisites
The following prerequisites apply: 9100 is installed and qualified Two sectors are needed: one for Extended Outer and one for Extended Inner cell Extended Outer Cell and Extended Inner Cell must have the same Frequency Range Enough resources (in terms of Abis timeslots and TCU) The antenna(e) are verified and functional.

1.2.2 Site Specific Information


At the OMC-R, a workstation must be available.

1.2.3 External Tasks


None.

12 / 32

3BK 17430 0845 RJZZA Ed.05

1 Overview

1.3 Scheduling
Note:
Time based on technical constraints In the following table, the number of resources shown does not take into account individual customer or safety requirements. Grouped Task Initial Checks OMC-R 1 ope. 15 min. Create Backup PRC 1 ope. 6 min. Create Working PRC 1 ope. 3 min. C2: + 11 min./ cell Create Extended Inner 1 ope. C1.1 13.5 min. C2.1 1 min. C2.2 1 min. Create Extended Outer 1 ope. C1.2 11.5 min. Check working PRC 1 ope. 1 min. Start Traffic 1 ope. 3 min. + 5 min./ cell C2: +4 min./ cell Call Tests 1 ope. 10min./ cell Create Adjacencies 1 ope. 9min./ cell 9 min./ cell C2: +4 min./ cell 10 min./ cell 31 min. + 5 min./ cell 1 min. C2.1 +1 min. C2.2 1 min. C1.2 11.5 min. C2: + 11 min./cell C1.1 13.5 min. 3 min. 6 min. Time/Task 15 min.

3BK 17430 0845 RJZZA Ed.05

13 / 32

1 Overview

Grouped Task Final Checks

OMC-R 1 ope. 15 min.

Time/Task 15 min.

Total time:

43 min. + 24 min./ cell C1.1 +13.5 min. C1.2 +11.5 min. C2 +1 min. + 15 min./ cell

ope.

: OMC-R Operator

14 / 32

3BK 17430 0845 RJZZA Ed.05

1 Overview

1.4 Telecom/Supervision Outage and Operating Impact


The following table describes the traffic outage and loss of supervision caused by each grouped task. Out. Ref. Grouped Task Initial Checks. Create Backup PRC Create working PRC. Create Backup PRC. Create Extended Inner Create Extended Outer. Check Working PRC Start Traffic on Extended Cell Call Tests. Oper. Impact -

Tel. Out -

GPRS Out -

Tel. Red -

Sup.Out -

Impacts... -

C2: 3 min. + 9 min./ cell

1 min. 30 sec.

Create Adjacencies Final Checks. -

TOTAL

C2: 3 min. + 9 min./ /cell

1 min. 30 sec.

3BK 17430 0845 RJZZA Ed.05

15 / 32

1 Overview

1.5 Resources
1.5.1 Tools
The following tables describe the necessary hardware tools, software tools, and forms.

1.5.1.1 Hardware Tools


Item Installation tools Mobile phone (bi-band, if possible) for call tests. Part Number Use at ... BTS BTS

1.5.1.2 Software Tools


Item Customer Documentation CD with the version associated with the current document edition. Remember that the document you are reading cannot be used as a paper version. It is online documentation using hypertext links which take you to other parts of a document on the same CD-ROM. All words in italics are hypertext links. Part Number Use at ... BTS, OMC-R

1.5.1.3 Forms
None.

1.5.2 Supplies
None.

1.5.3 Applicable Documents


You must have the following documents or have electronic access to the following documents: B10 BSS Methods Handbook BSS Configuration Handbook BSS Surveillance Handbook Network Reconfiguration Recommendations BTS NEM User Guide.

16 / 32

3BK 17430 0845 RJZZA Ed.05

2 Scenario

2 Scenario
This Scenario presents all checks needed before beginning the scenario, and all detailed tasks to be performed on each site.

3BK 17430 0845 RJZZA Ed.05

17 / 32

2 Scenario

2.1 Before Going Onsite


Before going onsite, you must check that the following information and supplies are available: All Prerequisites (Section 1.2.1) are met The customer has been informed of the: Date and time Site name and address Purpose of operation. Personnel are available (refer to Scheduling (Section 1.3)) Site Specific Information (Section 1.2.2) is available Tools (Section 1.5.1) are available and ready for operation Supplies (Section 1.5.2) are available and ready for operation Applicable Documents (Section 1.5.3) are available. Ensure that the technical release level of the delivered board is in accordance with the BSS hardware technical release document. Ensure that the method used at the BSS site is at the same level as at the OMC-R.

18 / 32

3BK 17430 0845 RJZZA Ed.05

2 Scenario

2.2 Before You Start


2.2.1 Checks
Perform the following operations: Check that all Prerequisites (Section 1.2.1) are met Check the availability of all necessary Tools (Section 1.5.1) and Supplies (Section 1.5.2) Inform the operator. Among the cases described in Cases (Section 1.1.1) and the options described in Options (Section 1.1.2), identify which cases and options apply to you.

2.2.2 Required Knowledge


You must be familiar with the following: Safety Rules and Precautions Telecom/Supervision Outage and Operating Impact (Section 1.4) The Reverse Procedure Grouped Task Sequence (Section 1.1.4) Operating Hints How to document Faults and Anomalies.

3BK 17430 0845 RJZZA Ed.05

19 / 32

2 Scenario

2.3 Scenario Description


This section describes how to create or configure an external cell.

Note:

Case-specific tasks are marked with C1, C2 in the Note column. Detailed tasks that do not have C1, C2 in the Note column are common to all cases and must always be performed.

2.3.1 Initial Checks


Note Task Description Perform an Audit Alarm State on the BSS. View Status of Managed Objects and Alarms on all the impacted TSUs (BTSs and Abis, if necessary). Print the reports and close the windows. Site OMC-R OMC-R To Do 10 min. 5 min. Outage None. None.

2.3.2 Create Backup PRC


Note Task Description Create PRC (Backup PRC), in restricted mode. The PRC opens automatically. Site OMC-R To do 1 min. Outage None.

This task creates a backup PRC for the Reverse Procedure (Section 2.4). OMC-R OMC-R 2 min. 1 min. None. None.

Copy BTS to PRC. Copy OMC Cells to PRC, if any.

Copy impacted cell(s) to Backup PRC; the cells belonging to the impacted BTS. Check PRC (check all, without forcing the Cell Administrative State). If the check produces error messages, correct the configuration as required and re-attempt the check. Continue corrections and checks until no error messages appear. Close PRC (Backup PRC). OMC-R 1 min. None. OMC-R 1 min. None.

20 / 32

3BK 17430 0845 RJZZA Ed.05

2 Scenario

2.3.3 Modify Logical Parameters


2.3.3.1 Create Working PRC
Note C2 Task Description Lock GPRS on Cell for the cell which will become Extended Inner or Extended Outer, if the cell is configured with GPRS. Create PRC (Working PRC). The PRC opens automatically. Copy BTS to PRC Copy OMC Cells to PRC. Site OMC-R To do 4 min. / cell Outage None.

OMC-R

1 min.

None.

C2

OMC-R OMC-R

2 min. 2 min./cell

None. None.

Note:Copy all the cells of the BTS, including the ones which will become Extended Inner or Extended Outer, into the PRC. C2 If the Hopping Type on the cell which will become Extended Inner or Extended Outer is different than NH, use Configure Logical Channels. OMC-R 1 min./cell None.

Note:The TRX channel hopping law will be removed. OMC-R 1 min./cell None

C2

Delete Frequency Hopping System.

Note:In the "Frequencies View" window, put NH for the Hopping Type and Altern. Hop. Type fields. C2 Change Cell Type to Extended Inner for the cell which will become Extended Inner, or to Extended Outer for the cell which will become Extended Outer. If the Extended Inner or Outer Cell has GPRS, use Set Cell Telecom Parameters to check and modify (if necessary) the GPRS parameters as follows: MAX_PDCH, MAX_PDCH_HIGH_LOAD and MIN_PDCH must have even values NB_TS_MPDCH must be set to 0 when the cell type is Extended Inner / Outer MAX_EGPRS_MCS is MCS4 for Extended Outer and MCS9 is for Extended Inner EN_NACC, EN_PSI_STATUS and EN_STREAMING are disabled. OMC-R 1 min./cell None

C2 O1

OMC-R

2 min./ cell

None.

Note:If LCS was activated on the cell, and the operator wants to keep it activated, do not set MAX_PDCH=0 on these cells.

3BK 17430 0845 RJZZA Ed.05

21 / 32

2 Scenario

2.3.3.2 Create Extended Inner


Note C1.1 Task Description Create Provisioning Cell. The cell is created in Working PRC and is in a locked state. C1.1 Use Set Cell Telecom Parameters. OMC-R Note: Set EN_PBGT_FILTERING to Disabled To have LCS on the cell, set MAX_PDCH>0 If the Extended Inner / Outer cells are PS capable, they must have the same value for the ACCESS_BURST_TYPE parameter. 2 min. None. Site OMC-R To do 2 min. Outage None.

22 / 32

3BK 17430 0845 RJZZA Ed.05

2 Scenario

Note C1.1 O1

Task Description To configure GPRS on a cell: Set the Routing Area Code Set the Routing Area Color MAX_PDCH, MAX_PDCH_HIGH_LOAD and MIN_PDCH must have even values NB_TS_MPDCH must be set to 0 when the cell type is Extended Inner / Outer MAX_EGPRS_MCS is MCS9 EN_NACC, EN_PSI_STATUS and EN_STREAMING are disabled When GPRS is created on the cell, you can also modify the following parameters: Min_PDCH NB_TS_MPDCH Max_Pdch_High_Load En_fast_initial_GPRS_access Ps_Pref_Bcch_Trx max_GPRS_Cs max _EGPRS_Mcs En_EGPRS If LCS with AGPS is activated, you can also modify the EN_CONV_GPS, EN_MS_Assisted_AGPS and EN_MS_BASED_AGPS parameters. To have EGPRS on the extended cell: Both inner and outer cells must have EGPRS declared (the EN-EGPRS parameter is set to Enable) All TRXs from inner and outer cells must support EDGE (all TRXs are TRAs).

Site OMC-R Note:

To do 2 min.

Outage None.

To have GPRS on the cell, Trx_Pref_Mark must be 0 for at least one TRX. To modify it for a block of TRX, use the Java Script Set/Update Circuit/Packet Mark Configuration Using Script. To modify only one cell, use the edit cell command (see Set Cell Telecom Parameters) If En_fast_initial_GPRS_access is set to Enable, respect the following rule: Min_PDCH >= En_fast_initial_GPRS_access + NB_TS_MPDCH.

C1.1

Create Radio Frequency.

OMC-R

0.5 min.

None.

Note:Use only Non Hopping for the Hopping Type. C1.1 Create TRX. OMC-R 0.5 min./TRX 1 min. None.

C1.1

Configure Logical Channels.

OMC-R

None.

3BK 17430 0845 RJZZA Ed.05

23 / 32

2 Scenario

Note C1.1

Task Description Configure TRX.

Site OMC-R

To do 0.5 min./TRX 0.5 min./ TRX

Outage None.

C1.1

Specify TRX Preference.

OMC-R

None.

Note:Select a non-null value. C1.1 Click on [ Apply and check ] in the "Edit Cell" window to save cell modifications in the Working PRC. Wait for the No error or warning message and click on [ Ok ]. If the check produces error messages, correct the configuration as required and re-attempt the check. Continue corrections and checks until no error messages occur. C1.1 Change Cell Type of the single cell to Extended Inner. Use Change Mate Cell to set Mate Cell parameters for the Extended Inner Cell. OMC-R 1 min. None OMC-R 0.5 min. None.

C2.2

OMC-R

1 min.

None

Note:Set the Mate Cell parameter to


Present

Mate cells must have the same LAC and the same BSIC. C1.1 Map Cell to a BTS Sector. OMC-R 1 min. None.

Note:Map the Extended Inner Cell.

24 / 32

3BK 17430 0845 RJZZA Ed.05

2 Scenario

2.3.3.3 Create Extended Outer


Note C1.2 Task Description Use Create Mate Cell to create an Extended Outer Cell. Site OMC-R To do 2 min. Outage None.

Note:Extended Inner and Extended Outer mate cells must have the same LAC and the same BSIC Select ExtendedOuter for the Cell Type parameter. C1.2 Use Set Cell Telecom Parameters. OMC-R 2 min. None.

Note:Set EN_PBGT_FILTERING to Disabled To have LCS on the cell, set MAX_PDCH>0 If the Extended Inner / Outer cells are PS capable, they must have the same value for the ACCESS_BURST_TYPE parameter.

3BK 17430 0845 RJZZA Ed.05

25 / 32

2 Scenario

Note C1.2 O1

Task Description To configure GPRS on a cell: Set the Routing Area Code Set the Routing Area Color MAX_PDCH, MAX_PDCH_HIGH_LOAD and MIN_PDCH must have even values NB_TS_MPDCH must be set to 0 when the cell type is Extended Inner / Outer MAX_EGPRS_MCS is MCS4 for Extended Outer EN_NACC, EN_PSI_STATUS and EN_STREAMING are disabled. When GPRS is created on the cell, you can also modify the following parameters: Min_PDCH NB_TS_MPDCH Max_Pdch_High_Load En_fast_initial_GPRS_access Ps_Pref_Bcch_Trx max_GPRS_Cs max _EGPRS_Mcs En_EGPRS If LCS with AGPS is activated, you can also modify the EN_CONV_GPS, EN_MS_Assisted_AGPS and EN_MS_BASED_AGPS parameters. To have EGPRS on the extended cell: Both inner and outer cells must have EGPRS declared (the EN-EGPRS parameter is set to Enable) All TRXs from inner and outer cells must support EDGE (all TRXs are TRAs).

Site OMC-R Note:

To do 2 min.

Outage None

To have GPRS on the cell, Trx_Pref_Mark must be 0 for at least one TRX. To modify it for a block of TRX, use the Java Script Set / Update Circuit / Packet Mark Configuration Using Script. To modify only one cell, use the edit cell command (see Set Cell Telecom Parameters) If En_fast_initial_GPRS_access is set to Enable, respect the following rule: Min_PDCH >= En_fast_initial_GPRS_access + NB_TS_MPDCH.

26 / 32

3BK 17430 0845 RJZZA Ed.05

2 Scenario

Note C1.2

Task Description Create Radio Frequency.

Site OMC-R

To do 0.5 min.

Outage None.

Note:Use only Non Hopping for the Hopping Type. C1.2 C1.2 C1.2 C1.2 C1.2 Create TRX. Configure Logical Channels. Configure TRX. Specify TRX Preference. Click on [ Apply and check ] in the "Edit Cell" window to save cell modifications in the Working PRC. Wait for the No error or warning message and click on [ Ok ]. If the check produces error messages, correct the configuration as required and re-attempt the check. Continue corrections and checks until no error messages occur. C1.2 Map Cell to a BTS Sector. OMC-R 1 min. None. OMC-R OMC-R OMC-R OMC-R OMC-R 0.5 min./ TRX 1 min. 0.5 min./TRX 0.5 min./ TRX 0.5 min. None. None. None. None. None.

Note:Map the Extended Outer cell.

2.3.3.4 Check Working PRC


Note Task Description Use the Check All option in Check PRC (Working PRC) (without forcing the Cell Administrative State) to check the parameters, hardware, and telecom impact of your PRC. If the check produces error messages, correct the configuration as required and re-attempt the check. Continue corrections and checks until no error messages appear. Site OMC-R To do 1 min. Outage None.

Note:For C2: For the cell which was modified from single to Extended Inner or Outer, ignore the following error message:
Cell should be locked.

3BK 17430 0845 RJZZA Ed.05

27 / 32

2 Scenario

2.3.4 Start Traffic on Extended Cell


Note C2 Task Description Shutdown Cell (WTC = 3 min.) Site OMC-R To Do 4 min./ Cell Outage START1

Note:Shut down the cell which was modified from single to Extended Inner or Outer. Activate PRC (Working PRC) in queued mode, with cell clean-up, without forcing the Cell Administrative State. Display Pending Activations List to see when the activation is finished. OMC-R 5 min./ cell Outage 1

The activation time depends on the number of cells activated. During the activation, supervision outage: 1 min. 30 sec. OMC-R OMC-R OMC-R 1 min. 1 min. 2 min. Outage 1 Outage 1 Outage 1

Close PRC (Working PRC). Perform Bar Cell for all extended inner cells. Use Unlock Cell for all the cells that were shut down and for the new cells. If GPRS is locked Unlock GPRS Traffic on Cell for the extended cell.

O1

OMC-R

2 min.

END1

2.3.5 Call Tests


Note Task Description Perform Call Test for the Extended Inner and Outer cell. Site BTS To Do 5 min./ cell Outage None.

This task must be done in parallel with the next task. Unlock Cell from Call Test is not necessary here. CHECK Display USD Detailed Cell Information. Check that calls are performed on the new cells. If calls fail, go to the Reverse Procedure (Section 2.4). O1 Perform GPRS calls on the extended cell (Inner / Outer). Check in the DTC report that each GPRS call is successful and print the DTC-report. OMC-R 15 min. None. OMC-R 5 min./ cell None.

28 / 32

3BK 17430 0845 RJZZA Ed.05

2 Scenario

2.3.6 Create Adjacencies


RESTRICTION
3BKA20FBR230654 When creating adjacencies, make sure to take into account that for one BSC only a maximum of 64 HOs are allowed.

Note -

Task Description Create Adjacency for the new cells.

Site OMC-R

To Do 5 min./ new cell(s)

Outage None.

Note:Create adjacencies between the Extended Inner and Extended Outer Cell. For each cell on the same OMC-R that must be adjacent to the new cells, Modify Adjacency to include the new cells. For each cell on the neighboring OMC-Rs that must be adjacent to the new cells, Modify Adjacency on neighboring OMC-Rs to include the new cells. OMC-R 2 min./ cell None.

neighbor OMC-R

2 min./ cell

None.

2.3.7 Final Checks


Note CHECK Task Description Perform an Audit Alarm State on the BSS. View Status of Managed Objects and Alarms on all the impacted TSUs (Abis and BTSs). Compare with reports from Initial Checks (Section 2.3.1). Site OMC-R OMC-R To Do 10 min. 5 min. Outage None. None.

3BK 17430 0845 RJZZA Ed.05

29 / 32

2 Scenario

2.4 Reverse Procedure


This section describes how to reverse the Create Extended Cell.

2.4.1 Lock Cells


Note Task Description In the SC, use Shut Down Cell Traffic to shut down all cells of the downstream BTSs (WTC = 3 min.). The GSM and GPRS traffic stops. Site OMC-R To Do 4 min./ cell Outage -

2.4.2 Restore Logical Configuration


Note C1 Task Description Create PRC (Delete_cell PRC). The PRC opens automatically. C1 C1 Copy BTS to PRC Copy OMC Cells to PRC OMC-R OMC-R 2 min. 2 min. Site OMC-R To do 1 min. Outage -

Note:Copy Extended Inner and Extended Outer cells. C1 Use Delete OMC Cell from PRC to delete Extended Outer and Extended Inner cells. Use the Check All option in Check PRC (Delete_cell PRC) (without forcing the Cell Administrative State) to check the parameters, hardware, and telecom impact of your PRC. Activate PRC (Working PRC) in queued mode, with cell clean-up, without forcing the Cell Administrative State. Display Pending Activations List to see when the activation is finished. OMC-R 1 min. -

C1

OMC-R

1 min.

C1

OMC-R

5 min./ cell

The activation time depends on the number of cells activated. During the activation, supervision outage: 1 min. 30 sec. OMC-R OMC-R OMC-R 1 min. 1 min. 5 min./ cell -

C1 -

Close PRC (Delete_cell PRC). Open PRC (Backup PRC). Activate PRC (Backup PRC) in queued mode, without cell clean-up, without forcing the Cell Administrative State. Display Pending Activations List to see when the activation is finished.

The activation time depends on the number of cells activated.

30 / 32

3BK 17430 0845 RJZZA Ed.05

2 Scenario

Note -

Task Description Close PRC (Backup PRC). Delete PRC. (Delete both the Backup PRC and Working PRC).

Site OMC-R OMC-R

To do 1 min. 2 min./ PRC

Outage -

2.4.3 Unlock Cells


Note Task Description In the SC, use Unlock Cell to unlock all cells. Traffic is restarted on the cells. If GPRS is locked Unlock GPRS Traffic on Cell for the extended cell. Site OMC-R To Do 1 min. Outage -

O1

OMC-R

2 min.

2.4.4 Call Tests


Note Task Description Perform Call Tests. Site BTS To Do 5 min./ cell Outage -

Perform call tests for all impacted cells. CHECK O1 Display USD Detailed Cell Information. Perform GPRS calls on the extended cell (Inner / Outer). Check in the DTC report that each GPRS call is successful and print the DTC report. OMC-R OMC-R 5 min./ cell 15 min. None.

2.4.5 Final Checks


Note CHECK Task Description Perform an Audit Alarm State on the BSS. View Status of Managed Objects and Alarms on all the impacted TSUs (Abis and BTSs). Compare with reports from Initial Checks (Section 2.3.1). Site OMC-R OMC-R To Do 10 min. 5 min. Outage -

3BK 17430 0845 RJZZA Ed.05