Sie sind auf Seite 1von 1

PLAN COFRAJ PLACA PESTE ETAJ 2

A B BC C CD D E EF SCARA 1:50 F G H HI I IJ J K
6715

295 535 325 345 345 305 535 490 355 500 535 305 345 345 325 535 295

410 405 1185 135 1055 135 555 135 565 135 1590 410

15

15
7

7
15

15
7

7
100 100 100 100

100

100

100

100
135

135

135

135

135
35 35 35 35
25 25 25
1510 1510 1510

35

35

35

35
55

55
55

55
315

315
+9.65

+9.65

+9.65

+9.65
+9.40

+9.40

+9.40

+9.40
+9.65

+9.65

+9.65

+9.65

+9.65
+9.40

+9.40

+9.40

+9.40

+9.40
165

165

165

165

165

165

165

165
+9.65

+9.65
+9.40

+9.40
4

64
80 80 80 80 80 80
64

4
65 65 65 65 65 65 65 65 65

280

280
25 40 25 40 25 40 25 40 25 40 25 40 25 40 25 40 25 40

6 6

30

30

30

30

30

30

30
30

30

30

30

30

30

30

30
+9.80

+9.80

+9.80

+9.80

+9.80

+9.80
410

410
80 15 20 45 15 20 45 20 45 25 40 15 25 40 15 20 45 15 20 45 15 20 45 80

115

115

115

115

115
65 65 65 65 65 65 65 65
115

145

115
65 GOL SCARA 65

85

85

85
115

115

115

115

m 115
173

125
50 25 40 25 40 50

5 5

cm
30

30

30

30

30

30

30

30

30

30

30

30

30

30
+9.80

+9.80

+9.80

+9.80

+9.80
0c
4

20
20

4
25

=2
15 20 45 15 17 48 15 25 40 15 17 48 15 20 45

20
m
50 50

l. =

pl.
65 65 65 65 65

0c

cm
100

100

15
7

Hp

H
=2
80 80 80
15

cm7
= 17
100 50 70 30 50 70 30 50 80 70 70 30 50 100 50 50 30 70 50 100

pl.

cm
GOL LIFT

= 17
17 c

H
30 150 285 150 185 150 185 150 205 150 215 100 365 150 360 150 185 150 420 100 365 150 165 150 205 150 185 150 185 150 285 150 30

17
H pl.

180
173

pl. =

H pl.
173

l. =
125 20 180 20 125

Hp
350 H

350

350

350

350

350

350

350

350

350
585

585
470

470
250

250
+9.65 +9.65 +9.65 +9.65 +9.65 +9.65 +9.65 +9.65 +9.65 +9.65 +9.65 +9.65
317

23 17

23 17

23 17

23 17

23 17

23 17

23 17

23 17

317
45 20

20 20

20

20

20 20

20 20

20

20

20 20

45 20
40 25

15 25

15 25

40 25
m
40

40

40

40

40

40

40

40

40

40

40

40

40

40
0c
65

65

65

65
=2
+9.40 +9.48 +9.45 +9.45 +9.48 +9.40 +9.48 +9.48 +9.45 +9.45 +9.48 +9.40

pl.
+9.65

+9.65

+9.65

+9.65
+9.45

+9.45

+9.45

+9.45
+9.65

+9.65
+9.40

+9.40
+9.65

+9.65

+9.65

+9.65

+9.65
+9.48

+9.48

+9.48

+9.48

+9.48
H
30 505 30 640 30 620 30 505 30 815 30 470 30 505 30 620 30 640 30 505 30

m
0c
120

120

120

120

120

120

120

120

120

120

120

120
cm
cm
=2

25
= 17
4 4

pl.
cm
30

30
l. =
H

cm
Hp
= 17

H pl.

= 17
H pl.

H pl.
+9.65 +9.65 +9.65 +9.65 +9.65 +9.65 +9.65 +9.65 +9.65 +9.65 +9.65 +9.65
48 17

48 17

38 17

38 17

38 17

38 17

38 17

38 17

38 17

38 17

48 17

317
35 20

35 20

35 20

35 20

35 20

35 20

45 20
300

300
40 25

30 25

30 25

40 25
55

55

55

55

55

55

55

55

55

55

55

55

55

55

55

55
65

65

65

65

65

65
397.5

397.5
+9.40 +9.48 +9.45 +9.45 +9.48 +9.40 +9.48 +9.48 +9.45 +9.45 +9.48 +9.40

c m
17
30 65 30 410 30 640 30 620 30 505 30 815 30 470 30 505 30 620 30 640 30 410 30 65 30

l. =
Hp
34 34
2595

2595
1505

1705

1935

1705

1705

1705

1935

1705

1935

1935

1705

1505
765

765

765

765

765

765

765

765

765

765

765

765

765

765
cm
165

165
m
0c

= 17
cm

=2
cm

H pl.
25

pl.
= 17

l. =

H
cm

Hp
m

H pl.
0c
= 17

=2

1610
H pl.

pl.
H
397.5

397.5
+9.65 +9.65 +9.65 +9.65 +9.65 +9.65 +9.65 +9.65 +9.65 +9.65 +9.65 +9.65
48 17

48 17

38 17

38 17

38 17

38 17

38 17

38 17

38 17

38 17

48 17

317
35 20

35 20

35 20

35 20

35 20

35 20

45 20
40 25

30 25

30 25

40 25
300

300
55

55

55

55

55

55

55

55

55

55

55

55

55

55

55

55
65

65

65

65

65

65
+9.40 +9.48 +9.45 +9.45 +9.48 +9.40 +9.48 +9.48 +9.45 +9.45 +9.48 +9.40

30 65 30 410 30 640 30 620 30 505 30 815 30 470 30 505 30 620 30 640 30 410 30 65 30

cm
17
3 3

l. =
30

30
Hp
120

120

120

120

120

120

120

120

120

120

120

120
+9.65

+9.65
+9.40

+9.40
+9.65

+9.65

+9.65

+9.65
+9.45

+9.45

+9.45

+9.45
+9.65

+9.65

+9.65

+9.65

+9.65
+9.48

+9.48

+9.48

+9.48

+9.48
cm

cm
= 17

= 17
m

m
0c

0c
H pl.

H pl.
=2

=2
+9.65 +9.65 +9.65 +9.65 +9.65 +9.65 +9.65 +9.65 +9.65 +9.65 +9.65 +9.65
pl.

pl.
H

H
48 17

23 17

23 17

23 17

23 17

23 17

23 17

23 17

23 17

317
20 20

20

20

20 20

20 20

20

20

20 20

45 20
40 25

15 25

15 25

40 25
40

40

40

40

40

40

40

40

40

40

40

40

40

40
250

250
470

470
65

65

65

65
cm
+9.40 +9.48 +9.45 +9.45 +9.48 +9.40 +9.48 +9.48 +9.45 +9.45 +9.48 +9.40

25
585

585
350

350

350

350

350

350

350

350

350

350
l. =
30 505 30 640 30 620 30 505 30 815 30 470 30 505 30 620 30 640 30 505 30

cm

Hp
= 17
173
30 150 285 150 185 150 185 150 205 150 215 100 365 150 360 150 185 150 420 100 365 150 165 150 205 150 185 150 185 150 285 150 30

H pl.
100 50 70 30 50 70 30 50 80 70 70 30 50 100 50 50 30 70 50 100

cm
80 80 80

17
15

7
100

100

15
65 65 65 65 65
7

50 50

l. =
15 17 48 15 17 48 15 25 40 173 15 17 48 15 20 45

Hp

4
20

2 2

20
4

30

30

30

30

30

30

30

30

30

30

30

30

30

30
+9.80

+9.80

+9.80

+9.80

+9.80
50 25 40 173 25 40 50
173
115

115

115

115

115

115
65 65
115

145

115
65 65 65 65 65 65 65 65 65

85

85

85
115

115

115

115

115
80 15 20 45 15 20 45 20 45 25 40 15 25 40 15 20 45 20 45 15 20 45 15 20 45 80
410

410
1 1
30

30

30

30

30

30

30
30

30

30

30

30

30

30

30
+9.80

+9.80

+9.80

+9.80

+9.80

+9.80
25 40 25 40 25 40 25 40 25 40 25 40 25 40 25 40 25 40 N
280

280
65 65 65 65 65 65 65 65 65
+9.65

+9.65
+9.40

+9.40
80 80 80 80 80 80

4
64

64
4

165

165

165

165

165

165

165

165
V E
+9.65

+9.65

+9.65

+9.65
+9.40

+9.40

+9.40

+9.40
+9.65

+9.65

+9.65

+9.65

+9.65
+9.40

+9.40

+9.40

+9.40

+9.40
L. IN
DIVID
315

315
P+ UAL
9.00 1E+M A
S GR. (95.5
0)m
L. IN
DIVID
RISC REZIS

55

55
55

55
P+ UAL
MIC T E 7.2 1E+M A
DE INNTA IV GR. 4 (93.84
1510 1510 1510 CEN

E
RISC REZIS )m
35

35

35

35

ALINIER
DIU MIC TEN
L. IN DE IN TA IV
DIVID CEN L. IN
25 25 25 NC 1
0567 7
P+1 UALA
E
DIU DIVID
P+1 UALA BETON ARMAT

60
GR. .14 (93.6

3.00
4

min
35.7 E

8.90
min EDIF 5 RISC REZIS 4)m GR. 8.46 (95 +M
35 35 35 35 60 5.0
0 ICAB
IL
SA

SB
MIC TE
DE INNTA II
RISC R EZ
MIC ISTENT
.06)m
135

135

135

135

135

EDIFIC
37.45 CND DE IN A IV

13.30
SC
6

IU CEN
5 CON
TUR
A

NC 6
DIU INFRASTRUCTURA
100

100

100

100

3
S

23.6 5
43
100 100 100 100

10.0
UBS B

ABIL

9
OL

9.59 5
8.38

4.87
8
sau P10

PIPER
C25/30 cu P10 12 ; XC3 SAU XC4; T3/T4; (conform detaliilor de executie);
C

27.7 5
4

1
2.13

11.53
S2 D

CEN NT
DIU
5.00%
-1.20
CEM II/B-M42,5N; Cl 0,3%; Dmax 16mm; S3-T3/T4;
E

NC 6
15

15
7

E
63.0

NC 11
18.00
balc 80/1

6.05

oane D PARTIM
15

15
%
4

RDUL
AME ZONA oane
7

7
F

N
AGR AJATA
-raport maxim A/C: 0,50;

4
8.38
3019
RAC
G

E IN
EME

22.1
COLOORD
S1

3 NT H

USC ANA

COM
60 ATA
B LOC I

NC 1 -dozaj minim ciment: 300kg/mc.

BULEV
min FA AZIN UINT
ART NTANA 1819
EC
J

5.00 EZIA 8
Hma Rh = 2S OLECT

4.00 58
2

N
27 A

60
3.00
K
1

.92

min
31 x=1 + IVE
8.6 P+3E

balc
410 405 1185 135 1055 135 555 135 565 135 1590 410
SD

BAZ
IN R GR 60
RISC . REZIS 0m (+

3.00
ALE ETE

min
8% NTIE min
E PIE TE 104.8 5.00
TON MIC
DE IN NTA II

60

6.00
DRU ALA 0)
2.31 5
MD
E SE
8%
RVIT
SA
CE
NC 1
0035
NDIU 6.80
4.21
5
6

SUPRASTRUCTURA
UTE 8

5.02 5
SB

9.45
Structura de Rezistenta 12.05 SC

NC 1 C25/30 ; XC1; T3; (conform detaliilor de executie);

4
295 535 325 345 345 305 535 490 355 500 535 305 345 345 325 535 295 2.22 1773

EDIFIC
16.58 5

12.3
NC 1 A

7 4

oane
1770
CEM II/B-M42,5N; Cl 0,3%; Dmax 16mm; S3-T3/T4;
S2

11.1
4 L. IN
B

2.22 5
BAZ balc

29.69
IN H
IDRA oane DIVID
UAL
C

balc
ABIL
Tipul Structural - Sistem structural dual: sistem NTI
-raport maxim A/C: 0,50;
SUD

P A
D

97.2 -0.45 4.36 +M


(9
BAL 2 E S1
GR. 1.26)m
6715 structural în care încarcarile verticale sunt preluate în 37.45
CON
F

EDIF
3

RISC REZIS
MIC TE
DE IN NTA IV
-dozaj minim ciment: 300kg/mc.

7
ICAB 10.60
principal de cadre spatiale, în timp ce încarcarile
G

CEN

13.7
2
IL DIU

12.6
H 2

BAZ
IN R min 60

95
1

BAL ETE
laterale sunt preluate partial de

12.3 5
I

CON NTIE 5.00


SI

3.00
11.1
CON

min
J

NC 3

60
BAL
sistemul în cadre si partial de pereti structurali,
K

CON 531/2

91
BAL
A B BC C CD D E EF F G H HI I IJ J K
SD

L. C
individuali sau cuplati: Sistem dual cu pereti P
OLE
CTIV C35/45 cu XC0; T3; (conform detaliilor de executie);
21.5 +5E+6R E
1 (10
predominanti: sistem dual în care contributia peretilor GR.
RISC REZ
MIC ISTENT )m
8.41 CEM II/B-M42,5N; Cl 0,3%; Dmax 16mm; S3-T3/T4;

RE
DE IN A
la preluarea fortei taietoare, la baza cladirii, depaseste CEN II -raport maxim A/C: 0,50;

ALINIE
DIU
BAL
50% din forta taietoare de baza. CON
-dozaj minim ciment: 320kg/mc.

CON
BAL
CON

BAL
Factor de comportare "q" - DCH -Oţel
BAL
Regularitate in plan - NU CON
Otel beton B500 C - Agr. teh. 016-01/348-2016;
Regularitate pe verticala - NU Sarma de legat - STAS 889-89.

q = 5.0 x αu/α1 x 0.85 x 0.90 = 5.0 x 1.15 x


0.85 x 0.90= 4.40
ATENTIE:
αu/α1 = 1.15 ; ATENTIE: Clasa de ductilitate minima pentru armaturi va fi "C", implicand:
0.85 = reducerea factorului de comportare q din PENTRU TRASARE SI POZITIONAREA - Alungirea la forta maxima - Agt(A5) = min. 7.5% (recomandat 10%);
cauza neregularitatii in plan.
0.90 = reducerea factorului de comportare q din SCARILOR - TREPTELOR, PODESTELOR, - Alungirea la rupere - An = min. 16%;
- Raportul Rm/Re(Rp0,2) = min. 1.15 si max. 1.35
cauza neregularitatii in elevatie. PRECUM SI A RAMPELOR, SE VOR FOLOSI unde, Rm = rezistenta la tractiune,
Conform SR EN 1991-1-2-2004 (CR0/2012) PLANURILE DE LA SPECIALITATEA Re(Rp0,2) = limita de curgere.
incarcarea utila in camere este de 200 Kg/mp. ARHITECTURA !! INCADRAREA CONSTRUCTIEI
Sapele se vor realiza din beton simplu, C8/10, si
nu vor depasii 5cm in grosime (110 Kg/mp).
Clasa III de importanta =1.0 ATENTIE: IN CLASE SI CATEGORII
Zidaria de inchidere si compartimentare nu va avea - Constructii de importanta normala; PENTRU TRASARE SI POZITIONAREA
o greutate specifica mai mare de 950 Kg/mc sau 800 - Cladiri de tip curent, care nu apartin celorlalte AXELOR, PRECUM SI A RETRAGERILOR CATEGORIA DE IMPORTANTA 'C'
Kg/ml (30cm grosime). clase; GLOBALA A CLADIRII, cf.H.G. 755/197 (NORMALA)
Exemple: marea parte a constructiilor de locuit, FATA DE LIMITELE DE PROPRIETATE, SE
Peretii de zidarie: zidarie de caramida eficienta cu
urmatorul tip de alcatuire: zidarie confinata (ZC) -
social culturale, administrative VOR FOLOSI PLANURILE DE LA CLASA DE IMPORTANTA (CATEGORIA
confinata orizontal de grinzi din beton armat si vertical Factor de corectie λ=0.85
SPECIALITATEA ARHITECTURA !! DE IMPORTANTA SPECIFICA), cf. P100-1/2013 III
cu stalpisori din beton armat, astfel incat sa se
λ - factor de corectie care tine seama de contributia
realizeze contururi inchise, conform codului de modului propriu fundamental prin masa modala efectiva FACTOR DE IMPORTANTA SI DE EXPUNERE
proiectare CR6-2013.
AXELE NU SE VOR TRASA FOLOSIND 1.00
asociata acestuia, ale carui valori sunt: LA CUTREMUR), cf. P100-1/2013 - γI
Zidaria folosita va avea rezistenta declarata λ = 0,85 daca T1 ≤ TC si cladirea are mai mult de PLANURILE DE LA SPECIALITATEA
doua niveluri si
λ = 1,0 în celelalte situatii.
REZISTENTA SI STABILITATE ! ACCELERATIA TERENULUI PENTRU
Toate viciile si degradarile ascunse descoperite pe parcursul executiei se vor ATENTIE: PROIECTARE , cf. P100-1/2013 - ag 0,30
semnala proiectantului si expertului, care vor stabili masurile de remediere. Dat SE RECOMANDA EFECTUAREA DE MASURATORI PE COFRAJ INAINTE DE Lucrarile de terasamente si de sapatura a taluzurilor create in
fiind importanta acestor aspecte, proiectantul isi rezerva dreptul ca pe parcursul DEBITAREA SI FASONAREA BARELOR. urma excavatiilor se vor executa cu luarea tuturor masurilor ATENTIE! PENTRU TRASARE SI POZITIONAREA
GOLURILOR TEHNICE SE VOR CONSULTA PERIOADA DE CONTROL
executiei lucrarilor (dupa asigurarea accesului, dezvelirea unor elemente PREZENTA NOTA OBLIGA FOLOSIREA DE DISTANTIERI PENTRU A ASIGURA de asigurare a securitatii muncii in conformitate cu prevederile PREZENTUL PLAN ESTE DETALIAT PENTRU FAZA
ingropate, etc.) sa intervina cu unele amendamente. ACOPERIREA BARELOR DE REZISTENTA DIN ELEMENTELE DE REZISTENTA. legale si cu tehnologia de executie adoptata pe santier. D.T.A.C. IN SCOPUL OBTINERII AUTORIZATIEI DE (DE COLT) , cf. P100-1/2013 - TC 1,60
Contractorul trebuie sa verifice toate dimensiunile din desene (sa fie conforme
SE VA RESPECTA CU STRICTETE ACOPERIREA CU BETON A ARMATURILOR CONSTRUIRE SI CA URMARE NU SERVESTE PLANURILE DE INSTALATII !!
LONGITUDINALE: ESTE INTERZISA FOLOSIREA PREZENTEI
cu realitatea din teren) inainte de procurarea materialelor si inceperea lucrarilor. DREPT PLAN DE EXECUTIE. PROIECTANT GENERAL Acest desen și informațiile cuprinse în el nu pot fi copiate, reproduse sau utilizate, parțial sau în întregime decât cu acordul scris
Orice discrepanta aparuta in aceste desene trebuie raportata proiectantului
-grinzi a=3.0 cm DOCUMENTATII FARA AUTORIZATIA al PROIECTANTULUI și nu vor fi folosite în alt scop decât cel pentru care au fost elaborate.
PURAN ARCHITECTURE&DESIGN,BUCURESTI,
-placa a=1.5 cm DE CONSTRUIRE. SAP 2000 CSI CU #60643
inainte de inceperea oricarei lucrari. In caz contrar contractorul va avea intreaga EXECUTIA LUCRARILOR SE VA INCEPE DOAR STR SANDU ALDEA NR81 SECTOR1, RO15579793, Autodesk AutoCAD LT 2022
-elemente verticale a=2.0 cm e m a i l : a r h i t e c t u r a @ p u r a n . r o Asset ID(S):121899
Serial Number: 573-13065356
responsabilitate DUPA OBTINEREA AUTORIZATIEI DE CSI Structural Software S.R.L.
-fundatii a=5 cm
Necesarul de materiale (extrasele de armatura, cantitatile de beton, cofraje, SE VOR RESPECTA CU STRICTETE CIOCURILE ARMATURILOR. CONSTRUIRE, SI SE VA REALIZA IN VERIFICATOR - Descrierea reviziei
DATA
etc.) va fi calculat si de catre constructor si beneficiar inaintea inceperi lucrarilor TURNAREA BETONULUI SE VA FACE CONTINUU. CONFORMITATE CU DOCUMENTATIA TEHNICA NUME SEMNATURĂ
Reguli generale de betonare: -
sau inainte de fiecare etapa de executie. Atat constructorul cat si beneficiarul SECTIUNILE SI DETALIILE REPREZENTATE IN PLANURI VOR FI CONSIDERATE FAZA P.T.+D.E. EXPERT - nrc 8349
vor compara necesarul de materiale cu listele ce insotesc prezentul proiect. In TIP PENTRU CONDITII SIMILARE
Punerea in opera a betonului se va face in maxim 1 - ore din momentul PROIECTANT DE SPECIALITATE NUMĂR
caz de neconcordanta intre masuratorile din proiect si masuratorile efetive de REZISTENTA SI STABILITATE TITLU PLAN : PROIECT
plecarii betonului din statie, functie de temperatura amestecului, tipul de
pe santier, va fi anuntat proiectantul si vor fi facute corecturile de rigoare. In caz Rosturile orizontale de turnare a betonului se vor trata astfel incat sa se asigure S.C. ROFER DESIGN S.R.L. ICRD14
ciment.
contrar, proiectantul nu are nici o raspundere in legatura cu neconcordantele conditii pentru realizarea unui coeficient de frecare supraunitar intre cele doua
Inaltimea de cadere libera a betonului sa nu fie mai mare de 1,50 m. J40 / 14816 / 2014 C.U.I.: RO 33925348 PLAN COFRAJ PLACA PESTE ETAJ 2 2022
mai sus explicate. Adaosul de material datorat pierderilor de materiale va fi suprafete.
Betonul trebuie sa fie raspandit uniform in lungul elementului.
Bucuresti, Bdul Carol nr 70 et 2 ap 21, sector 2, ICRD04
adaugat de catre constructor in functie de tehnologia aleasa la fasonarea
!!!ATENTIE!!! Schimbarea grosimilor straturilor de pardoseala, a
email: ion.catalin.valentin@gmail.com; telefon : 0040761094577
2023
Turnarea noului strat se va face inainte de inceperea prizei betonului din
armaturilor, turnarii betonului, etc. SCARA
compartimentarilor si/sau a tipurilor de zidarii(ca greutati volumice), a stratul turnat anterior. SPECIFICAȚIE NUME SEMNATURĂ
TITLU PROIECT
CONSTRUIRE IMOBILE LOCUINTE COLECTIVE CU REGIM DE FAZA
Turnarea se va face continuu pana la rosturile tehnologice de lucru. 1:50 INALTIME 2S+P+3E, ORGANIZARE DE SANTIER, IMPREJMUIRE
Constructorul este obligat să studieze TOATE proiectele (în special cele de apă locatiei echipamentelor sau orice alta modificare de incarcari fata de
şi canalizare) înainte de începerea lucrărilor la acest obiectiv. tema initiala se face numai cu acordul scris al proiectantului. Durata maxima a intreruperilor de betoane, pentru care nu este necesara
luarea de masuri speciale la reluarea turnarii nu trebuie sa depaseasca
ȘEF PROIECT arh. Sorin PURAN 1:20 TEREN, RACORDURI / BRANSAMENTE UTILITATI
P.T.+
JUDETUL ILFOV, ORAS VOLUNTARI, STR. BULEVARDUL
Dacă în timpul lucrărilor se constată şi situaţii diferite de cele care au fost luate ATENTIE timpul de incepere a prizei betonului.
PROIECTAT Ing. Cătălin Ion
DATA
ADRES PROIECT
PIPERA, TARLAUA 4, PARCELA 93, N.C.: 100358 D.D.E.
în consideraţie în documentaţia tehnică, vor fi convocaţi la faţa locului atât - ROSTUL DE TURNARE A BETONULUI IN ELEMENTELE VERTICALE(STALPI) Pentru alte reguli generale se vor respecta prevederile cuprinse in NR. PLANŞĂ
03.2023 BENEFICIAR
proiectantul cât şi verificatorul, în vederea deciziei de intervenţie oportune. VA TINE CONT DE ARMAREA LONGITUDINALA A GRINZILOR(CIOCURI). normativul NE 012-99 cap. 12.3. DESENAT Ing. Cătălin Ion S.C. TWO PROPERTIES S.R.L. R06

Das könnte Ihnen auch gefallen