Moraolla Hy dropow 2 Prsiet
AY.
MORAGOLLA HYDROPOWER PROJECT
_LOT A2 ~ MAIN CIVIL WORKS.
GINEER’S ET Number crow
| TRANSMITTAL -——__— :
| (ET) ET sue Date: Sepramber 15,2022 |
To the Cont on From the Engineer
| China Gezhouba Group Company Limited | Nippon Koei JV Fichtner
‘ a i
| Contents of transmittal:
| The Gags Cnsestn Drawings |
DrawingNo, Rev, ‘Title i
AR-301 3 Access Road, Aocess Road to Surge Tank, General Layout
| aR 304 4 Access Road, Access Road t Surge Tank, Plan & Profile CH{0~220 to 0470
AR-305 4 Aeeess Road, Access Road to Surge Tank, Plan & Profil CH.0=870 1 0-720
| ag -320 3 coess Road, Access Road to Surge Tank, section at 0540 to 0580
| AR - 365 1 Access Road, Access Road to Surge Tank, Branch to Adit 2, Culvert (1)
| AR-366 1 _Rovess Road, Agcess Road fo Surge Tank, Branch Adit2, Culver (2)
j AR 1 Access Road, Access Road to Surge Tank, Branch to Adit 2, Culvert-
| Reinforcement Arrangement
AR-371 | Aseess Road, Acces Road fo Surge Tank, Culver at sation 0-447 60,
; Plan, Sections and Details
| ag-372 \ ‘Access Road, Access Road to Surge Tank, Culvert at station 0447.60, |
| Reinforcement Arrangement
Contrast RP Vorumnes
| | Sub-Clause 8.12
Deseripions Consnition Drawings |
|
| |
| Nov 1
\
Reiedy —~/~S~SCUsvued by the Enineor Receipt Adinowlelgment
Name: Sampath Narasinghe | Name: Dr. Tatsuo [ryo. Contractor's Receipt Stamp (Date)
Signature | signature
|
]
|
f |
Date: Date:
[PSR ees ie | one is
Notes The Engineer's submission of documents to the Contractor shall be made on this Engineer's Transmittal
(ED form.
ev
ce: r re
Srpat{Ebe 8) wit dewings Jeo
ce
4) File x
AX
ETD Page Toft
Sign document controler:
Form ET sue 1 = SeptemberTEARS
A jis
ssc
13.00
RELOCATION
ca
ct ia
evan) |
in +
[canara sins
"ak WL 3 RSUED
NoTES:
1) Aldmuaons ae. res ues ore
(9h dneeg us pois sud a ST 101 -.
THE DERDCARTC SUGHIST PEMIBUC OF SUT
TUNISTRY OF PONER AND RENEWABLE ENERGY
CEYLON ELECTRICITY BOARD
[GREEN PONER DEVELOPVENT ANO ENERGY EFFICIENCY
IMPROVEMENT INVESTWENT PROGRAM (Tan 1),
MORAGOLLA HYDROPOWER PLANT
CCONTRAGTNO, CEBIPOMOSLLAZ
NIPPON KOEI » 0+» FICHTNER
‘CONSTRUCTION DRAWING FORLOT AZ: MAIN CIVIL WORKS
|FOR CONSTRUCTION,
‘ACCESS ROAD
sas x 2 ACCESS ROAD TO SURGE TANK
7 com emma 3
| Ta0ve ae Amey Segoe —| yw | ue seca iaaeihell
ER Re igre w [6 are wa [oe m=
5 er] owe esa [reas [apmoes | rmmene: AR = a] sae Pevase
sraveato
STAC
wera. bien 1a sostehicpeneteom |
oa
ea
sous | com
sa
0)
fee esee
Hig
ze §
a
a5
svar | sae
carve | sane | ose
sna | ese | oon
snve | sas
sms
ores:
1 Almensons ain rots nls tern ta
(1 The deaig as pon sad 9 ST 104.
on om
oo
« 2 am
seuce Sh
THE DANOCRRTIC SORT AUR OF STANT
[MNISTRYO= PONER AND RENEWABLE ENERGY
CEYLON ELECTRICITY BOARD
‘GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY
INPEOVENENT NVESTUENT PROGRAM (rancho 1}
MORAGOLLA HYDROPOWER PLANT
‘CONTRACT NO CEBPONOOLLAZ
LONGITUDINAL SECTION
ERIN
NIPPON KOED 9:00.00 FICHTNER
‘CONSTRUCTION DRAWING FOR LOT AZ: MAIN CIVIL WORKS
ACCESS ROAD
ACCESS ROAD TO SURGE TANK
PLAN & PROFILE CH.0#220 TO CH. 0+470
[FOR CONSTRUCTION
; =e, =
Dramucns AR = 304 Hy] saw a8UCTION,
|
TRU
OR CON
IFO
ores:
1) Alger wont ws oho
()Mesroneg as pve toa 8 ST 105-0
ow 90
scale x PF
ay
seas te
su | some | eo
THEDANEATE SEA ST RRC OF SLA
MNSTRY OF POWER AND RENEMAELE NERY
a CEYLON ELECTRICITY BOARD
‘GREEN POWER OEVELOPMENT ANO ENERGY EFFICIENCY
IMPROVEMENT INVESTMENT PROGRAM [Trance 1)
MORAGOLLA HYDROPOWER PLANT
(CONTRACT NO. CEBPOMOGLLAZ
NIPPON KOEL 90». FICHTNER
‘CONSTRUCTION DRAWNG FORLOT A2:MAN CNL WORKS,
ACCESS ROAD
LONGITUDINAL SECTION
ACCESS ROAD TO SURGE TANK
7 a_i a rand
S| 1] PLAN & PROFILE CH.0+470 TO CH. 0+720
x sna oes Ae Cus
wus
Trove Rev gna eto ano wares oa
wi) ug ou [owe
Despion
rawncna AR = 305 2sunn 2018
Treveved_[Aspmred x Recron goutine
€ -
ue raed gosine as
100 p
sa
go
aie am
é 3405 "S08
so
ss Sensual ates
“ ‘ion ul secs om ore
‘ions: Sapcause
sx -
] | 1
uu crouno ge 2 2 g | [ eeyerono gg 2 8 |
tae | | og | ne aoa 68 3
1 eee eae eee
Z aia| |
sasmggrowo | 6 2 3 | eemgeono | ge 4
e 2 3 aol L at
i i i | | ensmecrouno | aig g &
| 8 8 ‘ | eevanow™ | Bla) 8
E “} l = EEE aoe eee
STATION -0¥840m STATION -0+580m
raat ne
50
548 €
ue r sores
| 1) Neinrira see ees ober si
au 2) Beater aorg wat don sta how Sd i.
Boe or
=) (FOR CONSTRUCTION
| LON
4 |ndahatcoet wien
= Hgens asta peace
su ae THE DEMDGRATIC SOGALIST REPUBLIC OF SRILANA
& NST OF POMERAND RENEMABLECNERSY
lel al | ] [Rey _cevwowetecrmiomsoaro_|
| ee ae gg 68 Og] OB ‘GREEN PONERDEVELOPVENT AND ENERGY EFFORNGY
| Pee Se REE Seeeee eee PROVEMENT NVESTUENT PROGRAM (Taste 1)
-PkisH GROUND g| zs) al al og) al MORAGOLLA HYDROPOWER PLANT.
Sao aj) 5] #] 3) 3] | CONTRACT NO CEBPONOGLLAZ
T Tame
Earn. # § § 8 @ 8} § 8 § | NIPPON KOEL o.i0%00n FICHTNER
: 1 — : (CONSTRUCTION ORAWNING OR LOT A2: WAIN CHIL WORKS
| exer cao gz ¢ s| 5) 8 8 —_
feo Be) 8 8 OS - ACCESS ROAD
ft [x ismaance T Reve os cuted ACCESS ROAD TO SURGE TANK
‘STATION -9+580m [asnaaner | Revie ascoued Ee SECTION AT 0+540 to 0458)
a Ba [Ax Toman [noes ger wae owe *
T orawing no AR - 320 AN 2013
[aw | oe ont 8 @weer
te |
| zs |
i | i py
ee | 4 i i Ly
z fa
§ _
a ee |
Ae Tao. -
a x / \ y |
COORDINATES (Unit: m)
[Pompe
7
(x fae
(rz [ers]
Ta
S107 15)
LA eaasesr>leo9o~n~eo—OO——
formosa 200
og
SECTION AA
Resnegat +
KEY PLAN
ores:
1) Alisensans nes eas ues wc
2) Faalaapa 2 aranarantibo desi
ozaontonar cain py aor conkacte
op 50m
oo
un OF POWER AIO RENENABLE ENERGY
CEYLON ELECTRICITY BOARD.
(GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY
INPROVENENT INVESTMENT PROGRAM (Tranche!)
MORAGOLLA HYDROPOWER PLANT
‘CONTRACT NO. CEBPOMOGLUAZ
a THE DEOGRATS SDGAIST REABLCOF SAAN
NIPPON KGEF ».:00o0v0 | FICHTNER
‘CONSTRUCTION DRAWING FOR LOT AZ: MAIN IVE WORKS.
‘DRAWING THE ACCESS ROAD
ACCESS ROAD TO SURGE TANK
CULVERTAT STATION 04240
‘CULVERT
7 ar ow eae
fel ow as Tits os
prawnene. AR = 365 SS] mec.SECTION 8-8
Eve
Suc congas
5 Be.
omen cn
Levlng coe C15
SECTION D-D
SECTION BB
esi
Samos
af sat
Ps
SECTION C-C
rage
one.
oraersn regis
oven
regan
~ongis)
ones
ors
SECTION C-C
@
Coren cad
[evs coat cs
Rane somtotcg
SECTION 1-1
cuca
SOME A 1
one
owen
ome
oroge00
DETAIL 1
ores:
1) Aiden toi maa ules ober ss
2) Laon fat a show Og No. ARIES
5) Rar Dg $0.10 T9801 urement of wocanen ageren
THEDEROGANTIC SOGAIT REPUB OF SAR
'MNTRY OF POWER AND RENEWABLE ENERGY
CEYLON ELECTRICITY BOARD.
(GREEN POWER DEVELOPMENT AND ENERGY EFFICIENCY
PROVEMENT INVESTIENT PROGRAM (anche 1)
MORAGOLLA HYDROPOWER PLANT
(CONTRACT NO. CERIPOMOGLLAZ
NIPPON KOE 03:00 ~=FICHTNER
‘CONSTRUCTION DRAWING FOR LOT A2: MAIN GIVI. WORKS,
Deane TE ACCESS ROAD
ACCESS ROAD TO SURGE TANK
CULVERT AT STATION 0+240
(CULVERT - REINFORCEMENT ARRANGEMENT
NEE
Rais aaa
as__10
seme
praia AR - 368) ove ano
» aec ARsOFam
170
| ih
esl
| |
I sees |
| al Concrete Oran = Concrete C2)
| g poo a iy smencrs
pwoticconn : |
a | SECTIONE-E
|
peer meee
3 g |
Z <
| 5 g 5
|
L 1 |
I 7 ; | ores
i | 1M res nee emi
| : ; 2 Chnue nd oe nS eM 9 TY
ay | teow sigh salon ton
{ 7 2 | 2) adrbry Sah Tes001 tr een eeiaen oso
aN ¢ fare SDOT son dn oes
eine be
a a
ow on
sare Bt
THE DEMOCRATIC SOOALST REPUDLICOF SEAN
[MNSTRY OF PONER AND RENEMABLEENERSY
CEYLON ELECTRICITY BOARD
‘GREEN POIVER DEVELOPVENT AND ENERGY EFFCIENOY
IMPROVENENT INVESTMENT PROGRAM (Taree 1)
a ROT CTTON MORAGOLLA HYDROPOWER PLANT
{FOR CON TRUCTION; (CONTRACT, CEBPOMOGLAZ
NIPPON KOEE von» FICHTNER
(CONSTRUCTION ORAWING FOR LOT A2: MAIN CIVIL WORKS
reamertisl = | AGCERS ROAD
| ACCESS ROAD TO SURGE TANK
ae
: oe ACCESS ROAD TO THE FARM \,
4) CROSS DRAIN DETAILS
x a
| io ea rae Am : t= one
Neel Teas 7 twas] ped) OAMNSHE AR - 367 soDeC. 2020— Rossin
COORDINATES (Unit: m) t ts
a nen
z ,
STAD6550
rane
A
N Resor
ia
@ SECTION BB
% se
bean 2 4 fn
e.s35set aE
man ro
fo 2 8 FD Ie g
A sosiesonpss 1]
faa 7
ne Sfx 507
1 bee x0
[Eigen omit
ieecesaarat cus — Rubble sina
SECTION C-C SECTION 1-1 aad
eso
} seed enpces
oc
ftom
é : THE DNOCRATE SOSA ST PLEO OF STA
Psa | 1750 MP ys 70s wa /MSSTRY OF VER AND RENEWABLE ENERGY
~ elaine pause || : CEYLON ELECTRICITY BOARD
\ : i I eee eet ‘GREEN POWER DEVELOPMENT ANO ENERGY EFFICIENCY
E qe FOR Ci ICTION, INPROVENENT INVESTHENT PROGRAM (eache 1)
Dim “OR CONSTRUCTION, MORAGOLLA HYDROPOWER PLANT
L CONTRACT NO. CEBFONOGELAD
a | coraecan Beamer
eu ee ang Stinson S NIPPON KOEL »:e0\ve0n20 FICHTNER
C ‘CONSTRUCTION RAIWNG FORLOTAZ HAN CNL WORKS
von ilatns p
y t - SECTION A-A en ACCESS ROAD
~ ae hoe om ACCESS ROAD TO SURGE TANK
ee T T CULVERT AT STATION 0558
ie semen - i al PLAN, SECTIONS AND DETAILS
Sdldominnkrnctoieterel 7, swap cee reg wt ation am aca [a= [owe 7m
Sy he epee ta acorn xaet cndion sone ev] onion ans [inpoos | nmmene: AR- Ce] wee Tnorgan
orga
SECTION 8-8
Seecorpaet
i
[canta car
—taning nin O15
SECTION D-D
Wi
tea
|
rea
prza0
rzezn0
~pnews
5 oraatso ogue
y SECTION C-C
oon wo 1m
ones
DETAIL 1&2
ones
SECTION 0-0
FOR CON
‘OR CONSTRUCTION,
ores:
1) Adina ain mle us aan ai
2} Laon sian shonin Og No. ART
4} Rae g 80.1019 SD requrene eos rage
THE DSVOCARTC SDGAIIST REPUBLIC OF SUTRA
"MRSTRY OF POWER AND RENENABLE ENERGY
CEYLON ELECTRICITY BOARD
‘GREEN POMER DEVELOPMENT AND ENERGY EFFICIENCY
IMPROVEMENT INVESTMENT PROGRAM (Teenche 1)
MORAGOLLA HYDROPOWER PLANT
‘CONTRACT NO. CEBPONOGLUAZ
NIPPON KOET 1:0: \s000 FICHTNER
(CONSTRUCTION DRAWING FORLOTA2: MAIN CWIL WORKS.
ACCESS ROAD
ACCESS ROAD TO SURGE TANK
+ CULVERT AT STATION 04558
SECTION & REINFORCEMENT ARRANGEMENT
Raven asco
poet
ae ee |
tt