A new barrack is being con and you have been charged with purchasing the optimal power generators to provide power based on the followin
1. Generators must be able to produce a peak of 100kW. 2. Generators must be housed in the already existing powerhouse, which has an available area of 200 square feet. 3. Total cost should be minimized Models available Peak Power (in kW): 10 15 30
You are an electrical engineer in charge of generating power for a military base in Iraq. A new barrack is being con and you have been charged with purchasing the optimal power generators to provide power based on the followin
1. Generators must be able to produce a peak of 100kW. 2. Generators must be housed in the already existing powerhouse, which has an available area of 200 square feet. 3. Total cost should be minimized Models available Peak Power (in kW): 10 15 30
Area
Cost: Number: Cost Area Power 24 $5,000 4 $20,000 96 40 30 $10,000 2 $20,000 60 30 40 $25,000 1 $25,000 40 30 TOTALS $65,000 196 100
Your company produces two kinds of industrial microwave ovens, the Grande and the Inferno. Components for both ovens need to be machined and then assembled. It takes 4 h to machine the components for the Grande and 3h to machine the components for the Inferno. Your plant has a capacity of 100 h machine hours available per day. It takes 2 hours to assemble the Grande, and 3 hours to assemble to Inferno.Your plant has 48 hours of assembly time available per day. At most you would be able to sell 15 Grandes per day, while you couldn't sell more than 20 Infernos per day. If each Grande generates $2500 of profit, and each Inferno $2000 of profit, what combination of Grandes and Infernos should you recommend your plant builds each day in order to maximize profits? Assembly time available per day (h) Machining time available per day (h) 48 100
Grande Machining Time (h) Assembly Time (h) Market potential (units per day) Profit per unit
Your company produces two kinds of industrial microwave ovens, the Grande and the Inferno. Components for both ovens need to be machined and then assembled. It takes 4 h to machine the components for the Grande and 3h to machine the components for the Inferno. Your plant has a capacity of 100 h machine hours available per day. It takes 2 hours to assemble the Grande, and 3 hours to assemble to Inferno.Your plant has 48 hours of assembly time available per day. At most you would be able to sell 15 Grandes per day, while you couldn't sell more than 20 Infernos per day. If each Grande generates $2500 of profit, and each Inferno $2000 of profit, what combination of Grandes and Infernos should you recommend your plant builds each day in order to maximize profits? Assembly time available per day (h) Machining time available per day (h) 48 100
Grande Number produced Machining Time (h) Assembly Time (h) Market potential (units per day) Profit per unit
d the Inferno. h to machine no. Your plant ble the Grande, lable per day.
00 of profit, what
You manage a factory which produces four different types of wood paneling. Each type of paneling is ma
by gluing and pressing together a different mixture of pine and oak chips. The following table summarizes the requ amount of gluing, pressing, and mixture of wood chips required to produce a pallet of 50 units of each type of pan Resources Required Per Pallet of Paneling Type Tahoe Pacific Savannah Aspen AVAILABLE 50 50 100 50 5800 5 15 10 5 730 500 400 300 200 29200 500 750 250 500 60500 $ 450.00 $ 1,150.00 $ 800.00 $ 400.00
Glue (Quarts) Pressing (Hours) Pine chips (Pounds) Oak Chips (Pounds) PROFIT (per unit) Maximize profit based on this data.
You manage a factory which produces four different types of wood paneling. Each type of paneling is ma
by gluing and pressing together a different mixture of pine and oak chips. The following table summarizes the requ amount of gluing, pressing, and mixture of wood chips required to produce a pallet of 50 units of each type of pan Resources Required Per Pallet of Paneling Type Tahoe Pacific Savannah Aspen 23 15 39 0 50 50 100 50 5 15 10 5 500 400 300 200 500 750 250 500 $ 450.00 $ 1,150.00 $ 800.00 $ 400.00 $
NUMBER PRODUCED Glue (Quarts) Pressing (Hours) Pine chips (Pounds) Oak Chips (Pounds) PROFIT (per pallet) Maximize profit based on this data.
Cost to keep quarry Quarry in open per use year (1=yes, ($Million) 0=no) 3.5 4 4 2 1 1 1 1
ey produce to meet a certain minimize cost? There are 4 quarries with output of 6000 tons per year is required.
6042
uce to meet a certain e cost? There are 4 quarries with of 6000 tons per year is required.