You are an electrical engineer in charge of generating power for a military base in Iraq.

A new barrack is being con and you have been charged with purchasing the optimal power generators to provide power based on the followin

1. Generators must be able to produce a peak of 100kW. 2. Generators must be housed in the already existing powerhouse, which has an available area of 200 square feet. 3. Total cost should be minimized Models available Peak Power (in kW): 10 15 30

Size: 4'x6' 5'x6' 5'x8'

Cost: $5,000 $10,000 $25,000

new barrack is being constructed, wer based on the following limitations:

area of 200 square feet.

You are an electrical engineer in charge of generating power for a military base in Iraq. A new barrack is being con and you have been charged with purchasing the optimal power generators to provide power based on the followin

1. Generators must be able to produce a peak of 100kW. 2. Generators must be housed in the already existing powerhouse, which has an available area of 200 square feet. 3. Total cost should be minimized Models available Peak Power (in kW): 10 15 30

Size: 4'x6' 5'x6' 5'x8'

Area

Cost: Number: Cost Area Power 24 $5,000 4 $20,000 96 40 30 $10,000 2 $20,000 60 30 40 $25,000 1 $25,000 40 30 TOTALS $65,000 196 100

new barrack is being constructed, wer based on the following limitations:

e area of 200 square feet.

Your company produces two kinds of industrial microwave ovens, the Grande and the Inferno. Components for both ovens need to be machined and then assembled. It takes 4 h to machine the components for the Grande and 3h to machine the components for the Inferno. Your plant has a capacity of 100 h machine hours available per day. It takes 2 hours to assemble the Grande, and 3 hours to assemble to Inferno.Your plant has 48 hours of assembly time available per day. At most you would be able to sell 15 Grandes per day, while you couldn't sell more than 20 Infernos per day. If each Grande generates $2500 of profit, and each Inferno $2000 of profit, what combination of Grandes and Infernos should you recommend your plant builds each day in order to maximize profits? Assembly time available per day (h) Machining time available per day (h) 48 100

Grande Machining Time (h) Assembly Time (h) Market potential (units per day) Profit per unit

Inferno 4 3 2 3 15 20 $ 2,500.00 $ 2,000.00

Your company produces two kinds of industrial microwave ovens, the Grande and the Inferno. Components for both ovens need to be machined and then assembled. It takes 4 h to machine the components for the Grande and 3h to machine the components for the Inferno. Your plant has a capacity of 100 h machine hours available per day. It takes 2 hours to assemble the Grande, and 3 hours to assemble to Inferno.Your plant has 48 hours of assembly time available per day. At most you would be able to sell 15 Grandes per day, while you couldn't sell more than 20 Infernos per day. If each Grande generates $2500 of profit, and each Inferno $2000 of profit, what combination of Grandes and Infernos should you recommend your plant builds each day in order to maximize profits? Assembly time available per day (h) Machining time available per day (h) 48 100

Grande Number produced Machining Time (h) Assembly Time (h) Market potential (units per day) Profit per unit

Inferno TOTAL 15 6 4 3 78 2 3 48 15 20 $ 2,500.00 $ 2,000.00 $ 49,500.00

d the Inferno. h to machine no. Your plant ble the Grande, lable per day.

00 of profit, what

You manage a factory which produces four different types of wood paneling. Each type of paneling is ma

by gluing and pressing together a different mixture of pine and oak chips. The following table summarizes the requ amount of gluing, pressing, and mixture of wood chips required to produce a pallet of 50 units of each type of pan Resources Required Per Pallet of Paneling Type Tahoe Pacific Savannah Aspen AVAILABLE 50 50 100 50 5800 5 15 10 5 730 500 400 300 200 29200 500 750 250 500 60500 $ 450.00 $ 1,150.00 $ 800.00 $ 400.00

Glue (Quarts) Pressing (Hours) Pine chips (Pounds) Oak Chips (Pounds) PROFIT (per unit) Maximize profit based on this data.

ach type of paneling is made

g table summarizes the required 50 units of each type of paneling:

You manage a factory which produces four different types of wood paneling. Each type of paneling is ma

by gluing and pressing together a different mixture of pine and oak chips. The following table summarizes the requ amount of gluing, pressing, and mixture of wood chips required to produce a pallet of 50 units of each type of pan Resources Required Per Pallet of Paneling Type Tahoe Pacific Savannah Aspen 23 15 39 0 50 50 100 50 5 15 10 5 500 400 300 200 500 750 250 500 $ 450.00 $ 1,150.00 $ 800.00 $ 400.00 $

USED 5800 730 29200 32500 58,800.00

NUMBER PRODUCED Glue (Quarts) Pressing (Hours) Pine chips (Pounds) Oak Chips (Pounds) PROFIT (per pallet) Maximize profit based on this data.

ach type of paneling is made

g table summarizes the required 50 units of each type of paneling:

AVAILABLE 5800 730 29200 60500

You work for a company producing limestone.


What rock quarries should be used and how much should they produce to meet a certain quality of limestone (calcium and magnesium content) and minimize cost? There are 4 quarries with different qualities, capacity and cost to operate. A minimum output of 6000 tons per year is required. Information on rock quarries Calcium Magnesium contents contents (1.0 (2.3 required) required)

Maximum production per year (tons) 2000 2500 1300 3000

Cost to keep quarry Quarry in open per use year (1=yes, ($Million) 0=no) 3.5 4 4 2 1 1 1 1

Quarry 1 Quarry 2 Quarry 3 Quarry 4

1 0.7 1.5 0.7

2.3 1.6 1.2 4.1

ey produce to meet a certain minimize cost? There are 4 quarries with output of 6000 tons per year is required.

You work for a company producing limestone.


What rock quarries should be used and how much should they produce to meet a certain quality of limestone (calcium and magnesium content) and minimize cost? There are 4 quarries with different qualities, capacity and cost to operate. A minimum output of 6000 tons per year is required. Information on rock quarries Calcium Magnesium Maximum production contents contents per year (1.0 (2.3 (tons) required) required) Quarry 1 1 2.3 2000 Quarry 2 0.7 1.6 2500 Quarry 3 1.5 1.2 1300 Quarry 4 0.7 4.1 3000 AVERAGE 1.0 2.3 TOTAL: Cost (M$) 13.5

Actual Production (tons) 1998 1382 1300 1362

Quarry in use (1=yes, 0=no) 1 1 1 1

6042

uce to meet a certain e cost? There are 4 quarries with of 6000 tons per year is required.

Cost to keep quarry open per year ($Million) 3.5 4 4 2