Vipac Engineers & Scientists Pte Ltd 35, Jalan Pemimpin, #03-01, Wedge Mount Building, Singapore 577176 t. +65 6353 8711 | f. +65 6353 4211 www.vipac.com.au
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 2 of 36
Document Control
NorCE Offshore Pte Ltd
NorCE Endeavour Lighting Test Plan
DOCUMENT NO: 820532-0-draft PREPARED FOR: NorCE Offshore Pte Ltd 29, International Business Park, #05-06, Acer Building Tower B, Singapore 609923 Contact: Surapong Khamjunla : +65 6319 8787 Fax: +65 6416 8588 AUTHOR:
LIBRARY CODE: PREPARED BY: ViPAC Engineers & Scientists Pte Ltd 35, Jalan Pemimpin, #03-01, Wedge Mount Building, Singapore 577176 Contact: Seah Khuang Yong : +65 6353 8711 Fax: +65 6353 4211
Seah Khuang Yong REVIEWED BY: James Tay, Regional Manager RELEASED BY: Tay Hooi Yen, Administrator REVISION HISTORY Revision No. 0 Date Issued 5 October 2011
Copy No.______ 1 2
DISTRIBUTION Location ViPAC - Project/Client File Original - NorCE Offshore Pte Ltd
NOTE: This is a controlled document within the document control system. If revised, it must be marked SUPERSEDED and returned to the Vipac QA Representative. This document contains commercial, conceptual and engineering information which is proprietary to VIPAC Engineers & Scientists Ltd. We specifically state that inclusion of this information does not grant the Client any license to use the information without VIPAC's written permission. We further require that the information not be divulged to a third party without our written consent.
Commercial-in-Confidence
03 Oct 2011
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 3 of 36
TABLE OF CONTENTS
1. 2. 3. 4. 5. 6. 6.1. 6.2. SCOPE ..................................................................................................................... 4 CRITERIA ................................................................................................................. 4 DOCUMENTATION................................................................................................... 7 TEST PERSONNEL..................................................................................................... 8 TEST CONDITIONS ................................................................................................... 8 MEASUREMENTS..................................................................................................... 9 EQUIPMENT ......................................................................................................... 9 LOCATION ............................................................................................................ 9 6.2.1. 6.2.2. 6.2.3. 6.2.4. 6.2.5. 7. 8. 9. Selection Of Spaces Where Measurements Are To Be Conducted ................ 9 Visual Inspection Locations......................................................................... 10 General Illuminance Lighting Positions ....................................................... 10 Task Lighting Measurement Positions......................................................... 11 Red And Low Level White Illuminance ........................................................ 12
Commercial-in-Confidence
03 Oct 2011
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 4 of 36
1.
SCOPE
The purpose of this specification is to outline a suitable method for measuring and reporting on lighting levels for offshore installations. It takes into consideration the requirements of the IESNA RP-12-97 Recommended Practice for Marine Lighting and ABS Guide for Crew Habitability on Offshore Installations.
2.
CRITERIA
Criteria for achieving HAB are provided in Tables 1 to 6. Table 1 : Lighting Criteria for Crew Accommodation Spaces
Notes: 1. 2. Values in parenthesis are recommended, but not required, illuminance levels. If there is any opportunity for light to enter cabins or staterooms at the times of day or night when people sleep (e.g port lights, transoms, etc.), the maximum lighting level shall be 30 Lux.
Commercial-in-Confidence 03 Oct 2011
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 5 of 36
Notes: 1. 2. Values in parenthesis are recommended, but not required, illuminance levels. Night values are provided in Table 6, Red or Low-level White Illuminance.
Notes: Values in parenthesis are recommended, but not required, illuminance levels.
Commercial-in-Confidence
03 Oct 2011
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 6 of 36
Notes: Values in parenthesis are recommended, but not required, illuminance levels.
Commercial-in-Confidence
03 Oct 2011
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 7 of 36
Note: Where a navigation bridge exists, lighting in different areas of the bridge should be adjustable in brightness and direction to achieve the illuminance range in the above table.
3.
DOCUMENTATION
Appropriate design information and layout drawings showing the following shall be included in the test plan : a) b) c) d) e) f) Hull / installation outline, Bulkheads, Access routes Location of luminaries, Outlines of major furniture and equipment, Space name and number.
Drawings are scaled and sized to permit the scaling of survey points and lighting equipment and the recording of illuminance and other relevant data. The above can be found in Appendix A.
Commercial-in-Confidence
03 Oct 2011
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 8 of 36
4.
TEST PERSONNEL
Information about the External Specialists who shall be conducting the test and their approval and certification will be included in the test report.
5.
TEST CONDITIONS
The test conditions specified in Section B.4 of IESNA RP-12-97 shall apply : a) Throughout the test, voltage at the main switchboard bus shall be maintained at the nominal system voltage 1.0 percent, All lighting fixtures are to be clean at the time of the test. Lamps are to be properly installed, of the correct type and wattage, At time of test, the lighting system shall be warmed up and stabilized. Incandescent and tungsten-halogen ( quartz ) lamps shall be operated for fifteen minutes prior to testing; thirty minutes for high intensity discharge lamps and fluorescent lamps, Lamps shall be new and properly seasoned. 100 hours for high intensity discharge, fluorescent, and tungsten-halogen lamps; ten hours for standard incandescent lamps, In spaces with windows or port lights where the minimum lighting level should be provided by artificial light sources only, lighting measurements shall take place after dark, Interior spaces with no windows or ports may be measured during daylight hours, Stray light shall be masked out as far as possible, Lighting measurements shall be taken in cabins with lights turned off and curtains, shutters, etc. closed, During lighting measurements, shadows on the light meter caused by any kind of human activity should be avoided. As such, only personnel needed for the normal operation of the equipment in the space and those carrying out the measurements shall be present in the space being tested, Doors and windows shall be closed, except where they are normally left open. Spaces shall be furnished with the usual equipment and furnishings normally found in the space.
b)
c)
d)
e)
f) g) h)
i)
j)
Commercial-in-Confidence
03 Oct 2011
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 9 of 36
6.
6.1.
MEASUREMENTS
EQUIPMENT
ViPAC proposes the following measuring instruments to be used : a) Lutron Digital Lux Meter LX-101A,
The light meter is accordance with the requirements specified in Section B.5 of IESNA-12-97. It also meets requirements specified in Section B.8.4 of IESNA RP-12-97. Light meter will be allowed sufficient warm-up time to stabilize their output in accordance with the manufacturers recommendations. Details of the instrument can be found in Appendix B.
6.2.
LOCATION
ViPAC will measure areas having excessive external illumination into the space ( e.g. drill shack ), Areas whereby the uneven spacing of lighting results in non-uniform illuminance levels and dimly lit areas, For single type of manned crew space that exists ( e.g. control room, radio room, mess, gymnasium, library, etc ), Vipac will take measurements at that location, If multiple instances of manned crew space exist ( e.g. crew recreation areas ), with the exception of cabins, a representative sample of at least 20 percent of each type will be selected, For crew cabin spaces which are identical in configuration in terms of lighting systems, surface treatments geometry, furnishings and equipment layout, ViPAC will select only 2 of the spaces to determine whether lighting requirements are met, At least 25% of remaining spaces shall be visually inspected.
b)
c)
d)
e)
f)
Commercial-in-Confidence
03 Oct 2011
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 10 of 36
b)
c)
d)
ViPAC will conduct a full lighting test to determine if the measured spot check lighting is below the required minimum level, In the assessment of disability glare, visual inspections shall be conducted from the normal viewing position of the worker to determine whether there are any specular reflections from instrument and display surfaces caused by luminaries, In the assessment of discomfort glare, visual inspection from the normal viewing position of the worker at critical workstations shall be conducted to determine whether luminaries might be source of discomfort glare, Any glare should be noted in the Lighting Test report.
e)
f)
g)
b)
c)
d)
e)
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 11 of 36
b)
c)
d)
iii.
Measurements of mirrors shall be taken approximately 0.4m away from the surface of the mirror, For berths and bunks, measurements shall be taken at a point approximately 0.3m above the top of the mattress and 0.6m from the head of the bed.
Commercial-in-Confidence
03 Oct 2011
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 12 of 36
b) c)
d)
7.
DATA ANALYSIS
All measured data will be post processed and reported against ABS HAB criteria.
8.
a) b)
REFERENCES
IESNA RP-12-97, Recommended Practice for Marine Lighting ABS Guide for Crew Habitability on Offshore Installations, May 2002
Commercial-in-Confidence
03 Oct 2011
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 13 of 36
9.
No
DATA SHEETS
Location Tween Deck 6000 ab BL Storemans Office Engine Control Room Engine Workshop Main Deck 10000 ab BL Gym Guard Welding Foreman Office A Deck 13600 ab BL Duty Mess Deck Office Cinema / Briefing Conference Room Prayer Room Office Nurse Hospital Sick Bay Project Engineers Office Deck Foreman Office Line Up Operator Station B Deck 17200 ab BL Avg General Avg Task Lights off Glare (Y/N) No. of people Period Remarks
1-17 1-21 1-24 A-01 A-03 A-10 A-14 A-16 A-17 A-18 A-21 A-22 A-24 A-25 A-28
Commercial-in-Confidence
03 Oct 2011
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 14 of 36
C-01
C-04
C-07
C-09
Location Day Room 1 Mess Room Internet Room / Coffee Bar Scullery Galley Cooks Office Food / Meat Preparation Cold Food Preparation C Deck 20400 ab BL 4 Men Cabin Reading / Writing Bunk Light Bath / Showers Mirror 2 Men Cabin Reading / Writing Bunk Light Bath / Showers Mirror 2 Men Cabin Reading / Writing Bunk Light Bath / Showers Mirror 2 Men Cabin
Avg General Avg Task Lights off Glare (Y/N) No. of people Period Remarks
Commercial-in-Confidence
03 Oct 2011
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 15 of 36
No Reading / Writing Bunk Light Bath / Showers Mirror 2 Men Cabin Reading / Writing Bunk Light Bath / Showers Mirror 2 Men Cabin Reading / Writing Bunk Light Bath / Showers Mirror 2 Men Cabin Reading / Writing Bunk Light Bath / Showers Mirror 2 Men Cabin Reading / Writing Bunk Light Bath / Showers Mirror 4 Men Cabin
Location
Avg General Avg Task Lights off Glare (Y/N) No. of people Period Remarks
C-12
C-15
C-18
C-20
C-23
Commercial-in-Confidence
03 Oct 2011
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 16 of 36
No Reading / Writing Bunk Light Bath / Showers Mirror 2 Men Cabin Reading / Writing Bunk Light Bath / Showers Mirror 2 Men Cabin Reading / Writing Bunk Light Bath / Showers Mirror 4 Men Cabin Reading / Writing Bunk Light Bath / Showers Mirror 4 Men Cabin Reading / Writing Bunk Light Bath / Showers Mirror 4 Men Cabin
Location
Avg General Avg Task Lights off Glare (Y/N) No. of people Period Remarks
C-27
C-30
C-33
C-35
C-37
Commercial-in-Confidence
03 Oct 2011
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 17 of 36
No Reading / Writing Bunk Light Bath / Showers Mirror 4 Men Cabin Reading / Writing Bunk Light Bath / Showers Mirror 4 Men Cabin Reading / Writing Bunk Light Bath / Showers Mirror Internet Room 4 Men Cabin Reading / Writing Bunk Light Bath / Showers Mirror 4 Men Cabin Reading / Writing Bunk Light Bath / Showers Mirror
Location
Avg General Avg Task Lights off Glare (Y/N) No. of people Period Remarks
C-39
C-41
C-45 C-48
C-50
Commercial-in-Confidence
03 Oct 2011
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 18 of 36
No C-52
Location 4 Men Cabin Reading / Writing Bunk Light Bath / Showers Mirror D Deck 23400 ab BL 4 Men Cabin Reading / Writing Bunk Light Bath / Showers Mirror 2 Men Cabin Reading / Writing Bunk Light Bath / Showers Mirror 2 Men Cabin Reading / Writing Bunk Light Bath / Showers Mirror 1 Man Cabin Reading / Writing Bunk Light Bath / Showers
Avg General Avg Task Lights off Glare (Y/N) No. of people Period Remarks
D-01
D-04
D-07
D-09
Commercial-in-Confidence
03 Oct 2011
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 19 of 36
No D-12 Mirror 1 Man Cabin Reading / Writing Bunk Light Bath / Showers Mirror 1 Man Cabin Reading / Writing Bunk Light Bath / Showers Mirror 1 Man Cabin Reading / Writing Bunk Light Bath / Showers Mirror 2 Men Cabin Reading / Writing Bunk Light Bath / Showers Mirror 4 Men Cabin Reading / Writing Bunk Light Bath / Showers
Location
Avg General Avg Task Lights off Glare (Y/N) No. of people Period Remarks
D-15
D-18
D-20
D-23
Commercial-in-Confidence
03 Oct 2011
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 20 of 36
No D-27 Mirror 2 Men Cabin Reading / Writing Bunk Light Bath / Showers Mirror 2 Men Cabin Reading / Writing Bunk Light Bath / Showers Mirror 4 Men Cabin Reading / Writing Bunk Light Bath / Showers Mirror 4 Men Cabin Reading / Writing Bunk Light Bath / Showers Mirror 4 Men Cabin Reading / Writing Bunk Light Bath / Showers
Location
Avg General Avg Task Lights off Glare (Y/N) No. of people Period Remarks
D-30
D-33
D-35
D-37
Commercial-in-Confidence
03 Oct 2011
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 21 of 36
No D-39 Mirror 4 Men Cabin Reading / Writing Bunk Light Bath / Showers Mirror 4 Men Cabin Reading / Writing Bunk Light Bath / Showers Mirror 4 Men Cabin Reading / Writing Bunk Light Bath / Showers Mirror 4 Men Cabin Reading / Writing Bunk Light Bath / Showers Mirror 4 Men Cabin Reading / Writing Bunk Light Bath / Showers
Location
Avg General Avg Task Lights off Glare (Y/N) No. of people Period Remarks
D-41
D-48
D-50
D-52
Commercial-in-Confidence
03 Oct 2011
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 22 of 36
No
E-03
E-05
E-06
E-07
Location Mirror E Deck 26400 ab BL Client C Reading / Writing Bunk Light Bath / Showers Mirror Client A Day Room Client A Bedroom Reading / Writing Bunk Light Bath / Showers Mirror OCM / Owner Day Room OCM / Owner Bedroom Reading / Writing Bunk Light Bath / Showers Mirror Superintendent Day Room Superintendent Bedroom Reading / Writing Bunk Light Bath / Showers Mirror
Avg General Avg Task Lights off Glare (Y/N) No. of people Period Remarks
Commercial-in-Confidence
03 Oct 2011
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 23 of 36
No E-08
E-09
E-10
E-11
E-12
Location Chief Engineer Day Room Chief Engineer Bedroom Reading / Writing Bunk Light Bath / Showers Mirror Captain Day Room Captain Bedroom Reading / Writing Bunk Light Bath / Showers Mirror Senior Project Engineer Day Room Senior Project Engineer Bedroom Reading / Writing Bunk Light Bath / Showers Mirror Owner Reading / Writing Bunk Light Bath / Showers Mirror Welding Superintendent Reading / Writing
Avg General Avg Task Lights off Glare (Y/N) No. of people Period Remarks
Commercial-in-Confidence
03 Oct 2011
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 24 of 36
No
E-13
E-15
Location Bunk Light Bath / Showers Mirror Chief Electrician Reading / Writing Bunk Light Bath / Showers Mirror Superintendent Office Reading / Writing Bunk Light Bath / Showers Mirror Barge Clerk Office Operation Control Room F Deck 29400 ab BL Helicopter Reception
Avg General Avg Task Lights off Glare (Y/N) No. of people Period Remarks
Commercial-in-Confidence
03 Oct 2011
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 25 of 36
Commercial-in-Confidence
03 Oct 2011
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 26 of 36
Commercial-in-Confidence
03 Oct 2011
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 27 of 36
Commercial-in-Confidence
03 Oct 2011
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 28 of 36
Commercial-in-Confidence
03 Oct 2011
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 29 of 36
Commercial-in-Confidence
03 Oct 2011
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 30 of 36
Commercial-in-Confidence
03 Oct 2011
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 31 of 36
Commercial-in-Confidence
03 Oct 2011
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 32 of 36
Commercial-in-Confidence
03 Oct 2011
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 33 of 36
Commercial-in-Confidence
03 Oct 2011
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 34 of 36
Commercial-in-Confidence
03 Oct 2011
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 35 of 36
Commercial-in-Confidence
03 Oct 2011
90S-11-0171-TPL-820532-0-draft NorCE Endeavour Lighting Test Plan NorCE Offshore Pte Ltd Page 36 of 36
Commercial-in-Confidence
03 Oct 2011