Beruflich Dokumente
Kultur Dokumente
download : http://artikel-software.com/blog
toc
1. general
1-1 purpose
1-2 scope
1-3 references
1-4 codes and standards
1-5 symbols
1-6 applicability
1-7 manual content and organization
10-1 introduction
10-2 nec grounding and bonding requirements
10-3 static protection
10-4 communications systems grounding and bonding
10-4.1 introduction
10-4.2 connection to the grounding electrode
10-4.3 commercial building grounding and bonding requirements for
telecommunications
10-5 lightning protection
10-6 information sources
11-1 introduction
11-2 surge protection design
11-2.1 parallel versus series approach
11-2.2 multiple layer protection design
11-3 installation criteria
11-3.1 minimizing lead length for parallel surge protectors
11-3.2 breaker connection
11-3.3 grounding
11-3.4 acceptance tests
11-3.5 periodic maintenance
11-4 surge protection for communications and related systems
12-1 introduction
12-2 unbalanced voltages
12-3 harmonic distortion evaluation
12-4 harmonic current effects on transformers
12-5 power quality design
12-6 nonlinear load design considerations
12-7 neutral circuit sizing for nonlinear loads
12-7.1 potential neutral current magnitudes
12-7.2 installation design criteria
12-8 information sources
16-1 introduction
16-2 army design criteria
16-3 navy design criteria
16-4 air force design criteria