CHECK LIST FOR COSTING Enquiry Assigned Engineer S. N.

Date Rev Page Parameter


NA 1st chk
Prpd

1 of 2
2nd chk
Chkd

3rd Chk
chkd

4th chk
Appd

A Site Fabricated items Check for respecive region material rates, fabrication rates, erection rates. Written rates confirmation from respective Proposal 1 dept.head 2 Check for material rates of any specific makes if specified by client 3 Check for detailed engineering guidelines for parameters like plate thickness, MOC etc. 4 Check for use of standard available sizes 5 Check for specific codes & standards to be followed & it's impact on costing

B Shop Fabricated 1 Check for respecive region material rates, fabrication rates, erection rates. Written rates confirmation from respective Proposal dept.head

2 Check for material rates of any specific makes if specified by client 3 Check for thickness guidelines for columns, heat exchangers, tanks released by detailed engineering etc. 4 Check for time required for shop for equipment manufacture or any additional expenses ( example skid mounted plant, short delivery) 5 Check for use of inventory. ( example ready columns, tanks, heat exchangers, tube of specific length etc.) 6 Check for use of standard available sizes 7 Check for specific codes & standards to be followed & it's impact on costing C Bought Out Items 1 Check for taxes & duties for imported itmes with respect to region I consultation with DMLT 2 Check for evaluated vender offers for specific items like PHE, pumps etc. (case to case basis if applicable) 3 Check for cost & delivery time for specific makes items if any. 4 Check for updated rate contracts for various items like pumps, motors, PHE, agitators etc. 5 Check for additional cost on rate contract if requirement is specific (Example - EFF2 motors, double mechnical seal for pumps & similar such requirements)

D Lot Items ( Piping, fitting & valves, Electrical, Instrumentation) 1 Check for Plot plan to work out interconnecting piping cost 2 Check for piping standards & codes to be followed & impact of the same on costing in consultation with Piping & DMLT dept. 3 Check for valves makes, include impact for specific makes if any 4 Check for cost of IBR piping if any 5 Check for Electrical standards & codes to be followed 6 Check for electrical items make, include impact for specific makes in consultation with Electrical & DMLT dept. 7 Are costings received from Electrical dept for costing like PCC, PCC to MCC cabling, transformer, DG set if applicable 8 Check for Instrumentation standards & codes to be followed 9 Check for instrumentation items make, include impact for specific makes in consultation with Electrical & DMLT dept. Check for any specific requirement which will lead higher cost ( Example SMART positioner in control valve are costlier than Non 10 SMART pneumatic type positioner) E Civil & structure Are tentative layout & elevation drawings prepared to work out civil & structural cost ( Or have you referred any previous project, 1 propsoals - keep record for the same) 2 Is plot plan discussed with client to work out civil cost 3 Is site data confirmed by client ( example SBC) 4 Is site visited by our civil engineer before preparing civil & structure cost 5 Check for all the additional expenses required for civil & structural work ( specific case like pile foundation ) 6 Check for material & labor rates considered for civil & structure with respect to region E Package items 1 Are costings & offer received from TEBP 2 Are techno-comercial offers received from various venders like WTP, Fire fighting, Lab equipment 3 If offers are not taken then what basis is considred ( written records are must, not only verbal commitment from venders)

CHECK LIST FOR COSTING Enquiry Assigned Engineer S. N.


E General Points 1 Are expenses considered for packing & forwarding, taxes & duties, unloading if applicable 2 Are expenses considered for transit & storage insurance. 3 Check for transporation cost in detail in consultation with Shop & DMLT 4 Check for CE making changes 5 Check for Licence fees & basic engg. Fees. 6 Are expenses considered for travelling, communication, documentation etc. 7 Are expenses considered for financial activities like bank guarantee charges, government fees if any 8 Are all type of duties considered for imported items 9 Are service charges considered if applicable 10 Are price escalation for raw material and currency exchange considered 11 Check for additional expenses due to delay in project completion ( LD clauses) 12 Check for warehouse charges 13 Are site execution expenses included 14 Is any contingency considered in the costing
Total No. of unattended check points

Date Rev Page Parameter


NA 1st chk
Prpd

2 of 2
2nd chk
Chkd

3rd Chk
chkd

4th chk
Appd

Error captured