Sie sind auf Seite 1von 16

The FIrsT coMMercIaL sPace on QUeen eLIZaBeTh oLYMPIc ParK

The Press cenTre and BroadcasT cenTre

This image is indicative only

The ParK

After the Games, it will be a place unlike any other in the capital, offering the best in sporting and cultural amenities, unrivalled transport links and beautiful parklands. The Park will attract regional and international visitors and create new business opportunities. The Park benefits from a combination of open spaces, state of the art venues and a cluster of dynamic neighbourhoods. With Europes largest urban shopping centre, Westfield Stratford City, providing world class shopping, entertainment and new hotels, the Park is set to be Londons new destination for business, leisure and life. It will be the best of London all in one place.

Business investment and growth is increasingly focused on east london. the Queen elizaBeth olympic park is londons most exciting new destination and at the centre of this growth.

the press centre and Broadcast centre will form a new commercial district in Queen elizaBeth olympic park, Benefitting from all the facilities offered By westfield stratford city and the park.

The LocaTIon
Queen elizaBeth olympic park will Be one of the Best connected destinations in london.
Served by 9 overground and tube links, Stratford Regional and International stations offer exceptional connectivity to central London, the UK and Europe. The area will be further enhanced by the opening of Crossrail in 2017. London City Airport is ideal for business travellers, featuring fast check in and offering destinations including New York, Geneva, Milan and Madrid. Londons other four international airports are all accessible within one hour from Stratford Station.

transport
15 minutes to Bank and the city of london 7 minutes to st pancras international 25 minutes to oxford circus and covent garden 15 minutes to canary wharf less than 40 minutes to all londons major railway stations m1/m25 in 30 minutes 2 hours 15 minutes to paris
from stratford

M 25

SPORTING VENUES
STRATFORD
M 25

WORLD CLASS
CITY AIRPORT
M 25

THE WEST CITY END

AT WESTFIE EUROPES LA

CANARY WHARF

HEATHROW AIRPORT GATWICK AIRPORT


M 25

NEW SCHOOLS & NURSERIES

STARTING AT 114M TALL, THE ARCELORMITTAL ORBIT WILL BE THE TALLEST SCULPTURE AND2013 ATTRACTION IN THE UK VISITOR

00

ING VENUES

STARTING 2013 TAL ORBIT WILL BE THE TALLEST

T 114M TALL, THE ARCELORMITTAL ORBIT WILL BE THE TALLEST CULPTURE AND VISITOR ATTRACTION IN THE UK

PARK

CTION IN THE UK

CE

MAJOR ACRESEVENTS EVENTS UNIVERSITIES IN THE PARK SPACE OF OPEN SPACE OF OPEN PARKING SPACES IN FIVE MILESMAJOR MAJOR

AT 114M TALL, THE ARCELORMITTAL ORBIT WILL BE THE TALLEST SCULPTURE AND VISITOR ATTRACTION IN THE UK

SCULPTURE AND VISITOR ATTRACTION IN THE UK

SCREEN ACRES VUE IN THE PARK CINEMA OF OPEN SPACE COMPLEX

AT 114M TALL, THE BE THE TALLEST LORMITTAL ORBIT WILLARCELORMITTAL ORBIT WILL BE THE TALLEST SCULPTURE THE UK ATTRACTION ARCELORMITTAL ATTRACTION INAND VISITORAT 114M TALL, THEIN THE UK ORBIT WILL BE THE TALLEST

STARTING 2013

& NURSERIES AT WESTFIELD STRATFORDSHOPPING CENTRE CITY MAKING SCREEN & NURSERIES LARGEST URBAN CITY MAKING IT IT THE CITY & EUROPES AT WESTFIELD STRATFORDSHOPPING CENTRE EUROPES LARGEST URBAN VUE SCREEN SCREEN VUE ACRES CINEMA CINEMA EVENTS VUE COMPLEX OF OPEN SPACE IN SCHOOLS NEW THE PARK CINEMA COMPLEX NEW SCHOOLS & NURSERIES COMPLEX NEW SCHOOLS &RD CITY MAKING IT NURSERIES IN THE THENURSERIES OF OPEN SPACE OF OPEN SPACE IN PARK PARK & N SHOPPING CENTRE

AT VENUES SPORTINGWESTFIELD STRATFORDSHOPPING CENTRE NEWNEW SCHOOLS SCHOOLS SPORTING&LARGEST URBAN CITY MAKING IT NURSERIES MINUTES TO EUROPES VENUES

WORLD WORLD CLASSSCHOOLSTHE PARK CLASSIN NEW

AT WESTFIELD STRATFORD CITY AT WESTFIELD STRATFORD CITY MAKING ITMAKING IT AT WESTFIELD STRATFORD CITY MAKING IT EUROPES LARGEST URBAN EUROPESLARGEST URBAN SHOPPING CENTRESHOPPING CENTRE MINUTES TO EUROPES LARGEST URBAN SHOPPING CENTRE

MINUTES TO THE CITY & SCREEN SCREENSCREEN THE CITY & VUE OF OPEN SPACE VUE VUE CINEMA CINEMA CINEMA COMPLEX COMPLEX COMPLEX

ACRES

STARTING 2013

WORLD CLASS

SPORTINGVENUES VENUES SPORTING VENUES SPORTING

ACRES ACRES

STARTING 2013 STARTING 2013

STARTING 2013

300 1515 300 300 15 300 1515 15 300300 300 15


SPORTING VENUES

AT WESTFIELD STRATFORD CITY MAKING IT EUROPES LARGEST URBAN SHOPPING CENTRE

WORLD WORLD NEW SCHOOLS WORLD CLASS CLASS & NURSERIES CLASS

MINUTES TO THE CITY &

MINUTES SCREEN MINUTES TO TO VUE THE THE CITY & CITY & CINEMA MINUTES TO COMPLEX THE CITY &

AT 114M TALL, THE ARCELORMITTAL ORBIT WILL BE THE TALLEST SCULPTURE AND VISITOR ATTRACTION IN THE UK

WORLD CLASS

IN THE PARK

15

MINUTES TO OF THE CITY & OPEN

PARK

EVENTS

EVENTS MAJOR EVENTS UNIVERSITIES

ACRES

STARTING 2013

EVENTS PARKING SPACES

IN FIVE MILES

EVENTS

PARKING SPACES

MAJOR UNIVERSITIES PARKING SPACES PARKING SPACES

IN FIVE MILES IN IN FIVE MILESFIVE MILES


MAJOR
MAJOR UNIVERSITIES

UNIVERSITIES UNIVERSITIES

The PLace

Bordering the creative centre of hackney wick, tipped By vogue to Be going places and predicted to Become the centre of the cultural universe, the press centre and Broadcast centre will Be a viBrant district for all types of Business.
The Queen Elizabeth Olympic Park is expected to attract over 9.3 million visitors in 2016 and will become Londons new events playground, attracting international sporting and high profile events. From concerts and festivals, to temporary attractions and art installations, the Park will be the new destination for Londoners as well as international tourists and businesses visitors. The north west of the Park will become an all encompassing commercial district. Businesses of all types will enjoy the well connected and buzzing new area, taking advantage of the facilities offered by Westfield Stratford City and the rest of the Park. The area also builds on the governments ambition for East London Tech City, extending the belt of innovative businesses from Shoreditch and Old Street, through to the City and the Queen Elizabeth Olympic Park.

The north of the Park will be centred around waterways, landscaped parks and entertainment lawns. It will also be home to the VeloPark and the first residential development on the Park. The south of the Park is focused around urban entertainments, with waterfront bars and restaurants, anchored by the Stadium, the Aquatics Centre and the ArcelorMittal Orbit.

THE PRESS CENTRE AND BROADCAST CENTRE

BRO ADC AST CEN TRE


TRE PRE SS CEN

The sPace
Built for the london 2012 olympic and paralympic games, the press centre and Broadcast centre provide the largest availaBle commercial accommodation in the vicinity of central london.
The available space represents an exciting opportunity for any commercial occupier to be located in one of Londons newest and most dynamic commercial districts. The Broadcast Centre offers flexible workspace opportunities, whilst the Press Centre provides conventional office accommodation with views to Canary Wharf, the City and the Stadium Access to Stratford Station within 5 minutes via shuttle service, or a 20-25 minute walk through the Park.

The BroadcasT cenTre


Total area 62,234 sq m (669,887 sq ft) 10m floor to ceiling heights in studios 5 floors of offices Basic Grade A fit out Available from Spring 2013

The Press cenTre


Total area 29,428 sq m (316,763 sq ft) Grade A specification Double height reception BREEAM Excellent Available from Spring 2013

The BroadcasT cenTre


specification
General A steel chequered panel clad structure with vertical bracing systems which allow flexibility for possible transformation. The building comprises two elements; the offices and studios. The exterior of the building is to be finished with a mixture of hard and soft landscaping.

studios specification
Internal The Broadcast Centre studios will be delivered in shell and core condition. The studios can be accessed and operated independently with delivery vehicle access provided by roller shutter doors to the ground floor. The ground floors studios are designed to support 50kN/m2, with the first floor supporting 10kN/m2 Basic lighting systems for main access corridors VAV type cooling/ventilation systems, with primary high level supply and exhaust ductwork (250W/m) Public Health systems The Park benefits from infrastructure that could service high energy users Power distribution systems within each Studio The building benefits from advanced telecommunications infrastructure and bandwidth connectivity IT containment within the studios, with the supply terminated at the building perimeter Dry risers in all staircases Life safety systems 3 x 26 person lifts 6 x goods/person lifts for 46 person WCs

offices specification
Internal The offices will be delivered to a Category A fit out. The general office floors are designed to support an imposed load of 3.5kN/sqm Basic lighting systems Comfort cooling on all floors High level fresh air and exhaust ventilation Public Health systems Power distribution systems to risers IT containment, with the supply terminated at the building perimeter Dry risers in all staircases Life safety systems 2 x 26 person lifts 1 x goods/person lift for 33 person WCs

total floor space


nia 49,451 sQ m 532,291 sQ ft gia 62,234 sQ m 669,887 sQ ft

FUrTher InForMaTIon can Be FoUnd aT www.LegacYcoMPanY.co.UK/ coMMercIaLsPace

LIFTS PLANT/STORAGE/UTILITY

side elevation
(not to scale)
first floor

5M

4 3 2 1 ground floor g

first floor (studio space) gia 26,775 sQ m 288,200 sQ ft

THIRD FLOOR OFFICE SPACE

ground floor (studio space) gia 26,587 sQ m 286,182 sQ ft

GROUND FLOOR OFFICE SPACE

office space g

STUDIO SPACE OFFICE SPACE CIRCULATION SPACE

gia 1,709 sQ m 18,396 sQ ft

gia 1,709 sQ m 18,396 sQ ft

gia 1,709 sQ m 18,396 sQ ft

gia 1,753 sQ m 18,869 sQ ft

gia 1,596 sQ m 17,179 sQ ft

STAIRCASE WC LIFTS PLANT/STORAGE/UTILITY

5M

The Press cenTre


specification
The building will be clad in profiled steel with horizontal brise soleil above the windows. The ground floor has a generous floor to ceiling height of 5m, which would allow for retail type concessions The Press Centre offices will be delivered to a standard Category A fit out. The office floors are designed to support a minimum imposed load of 3.5kN/m2 Separate male, female & wheelchair accessible WCs on each floor Fan coil units on the ground and lower ground with high level fresh air and exhaust ventilation Passive chilled beams and displacement ventilation and high level exhaust on first floor and above Perimeter trench heating on all floors (ground and above), lower ground heating provided via high level fan coil units only Fresh air is supplied into raised floor voids as displacement ventilation on first floor and above, and at high level on ground and lower ground An energy efficient lighting system providing high frequency, dimmable ballasts coupled with fluorescent lighting technology The main switch gear in the lower ground plant room provides all power throughout the building. Local panel boards are provided in risers for occupiers IT containment within the building, with the supply terminated at the building perimeter

total floor space


nia 24,102 sQ m 259,434 sQ ft gia 29,428 sQ m 316,763 sQ ft

FUrTher InForMaTIon can Be FoUnd aT www.LegacYcoMPanY.co.UK/ coMMercIaLsPace

WC LIFTS PLANT/STORAGE/UTILITY

third floor nia 4,931 sQ m 53,077 sQ ft

9M

second floor nia 4,931 sQ m 53,077 sQ ft

first floor nia 4,931 sQ m 53,077 sQ ft

ground floor nia 7,180 sQ m 77,285 sQ ft

lower ground floor nia 2,129 sQ m 22,919 sQ ft

OFFICE SPACE TERRACE CIRCULATION SPACE STAIRCASE WC LIFTS PLANT/STORAGE/UTILITY

9M

conTacT Us

to find out more information or go to: please contact our agent cBre: www.legacycompany.co.uk/ tel: +44 (0)20 7182 2000, contact commercialspace matthew Black or charlotte lusby email: pressandBroadcast@cBre.com
disclaimers
This brochure is for information only and does not constitute an offer or contract. Information contained in this brochure should be verified by the interested party, and no warranty is given as to the accuracy or completeness of such information. CGI images are indicative only.

Registered in England No.6900359 Registered office: Olympic Park Legacy Company Limited, 5th floor, 29-35 West Ham Lane, Stratford, London, E15 4PH

Das könnte Ihnen auch gefallen