Sie sind auf Seite 1von 2

N.S.

N College of Engineering and Technology, Karur 03 Civil Lab Requirements Third Semester Surveying Practical Lab - 1 & 11 S.No Item Description 1 Total Station 2 Theodolite 3 Dumpy level 4 Plain Table Set up 5 Pocket Stereoscope 6 Ranging Rods 7 Levelling Staff 8 Cross Staff 9 Chains (20m, 30m) 10 Tapes (30m) 11 Arrows Computer Aided Building Drawing 1 Computer System of Pentium IV Licensed version of any reputed Analysis, Design & Drafting 2 Software STAAD.Pro Autoi CADD Fourth Semester

Unit No No No No No No No No No No No No

Quantity 3 6 6 6 1 24 12 6 5 / each 10 20 30

No No

10 10

Strength of Material Lab (Including Civil & Mechanical Dept.) UTM with double shear attachment (Minimum 400 KN capacity) Torsion Testing Machine for Steel (60NM Capacity) Izod Impact Testing Machine (300 J Capacity) Hardness Testing Machine i. Rockwell ii. Vickers iii. Brinnel 5 Beam Deflection test apparatus 6 Extensometer 7 Compressometer 8 Dial Gauge 9 Le Chatlier's apparatus 10 Vicat's apparatus 11 Mortar Cube mould 12 Spring testing machine for Tensile and Compressive loads (2500 N) 13 Metallurgical Microscope 1 2 3 4 No No No No No No No No No No No No No No No 1 1 1 1 1 1 1 1 1 4 2 2 10 1 3 1 1 1 1 1

14 Muffle Furnace (15000 C) No Hydraulic Engineering Lab (Including Civil & Mechanical Dept.) 1 Bernoullis theorem Verification Apparatus No 2 Calculation of Metacentric height water tank No Ship model with accessories No 3 Measurement of velocity Pitot tube assembly No 4 Flow measurement open channel flow

(i)Channel with provision for fixing notches (rectangular, triangular & trapezoidal forms) (ii)Flume assembly with provisions for conducting experiments on Hydraulic jumps, generation of surges etc. Flow measurement in pipes (i) Venturimeter, U tube manometer fixtures like Valves, collecting tank (ii) Orifice meter, with all necessary fittings in pipe lines of different diameters (iii) Calibration of flow through orifice tank with Provisions for fixing orifices of different shapes, collecting tank (iv) Calibration of flow through mouth piece Tank with provisions for fixing mouth pieces Viz external mouth pieces & internal mouth piece Bordas mouth piece Losses in Pipes Major loss Friction loss Pipe lengths (min. 3m) of different diameters with Valves and pressure rapping & collecting tank

Unit Unit

1 1

Unit Unit Unit

1 1 1

Unit

Unit

Minor Losses - Pipe line assembly with provisions for having Sudden contractions in diameter, expansions Bends, elbow fitting, etc. 7 Pumps (i)Centrifugal pump assembly with accessories (single stage) (ii)Centrifugal pump assembly with accessories (multi stage) (iii)Reciprocating pump assembly with accessories (iv)Deep well pump assembly set with accessories 8 Turbine (i)Impulse turbine assembly with fittings & accessories (ii)Francis turbine assembly with fittings & accessories (iii)Kaplan turbine assembly with fittings & accessories 9 Rotameter setup 10 Gear pump setup 11 Pelton wheel setup

Unit Unit Unit Unit Unit Unit Unit Unit No No No

1 1 1 1 1 1 1 1 1 1 1

Das könnte Ihnen auch gefallen