7/2/2009 1. Sa mpli ng program detai ls.

`Groundwater Vulnerability in Kickapoo River Watershed WI 6/26/09

Name/Date

_Lynn Chakoian 6/26/09_________

2. Distribution List Names and telephone numbers of those receiving copies of this QAPP. Name i. Jeff Goelke, City of Viroqua ii. Fred Madison, UW CALS iii. UW CALS iv. Kelvin Rodolfo v. Gary Thompson, VSN vi. Margaret Thielke vii. Lab that is chosen Telephone 637-7154 ext 18 (608)263.4004 (608) 262-1445 637 6159 637-3615 637-6742

3. Project/Task Organization

List key project personnel and their corresponding responsibilities. Name Project Titl e Advisory Panel (contact) Project Manager QA Consultant Responsibility Fred Madison Lynn Chakoian Margaret Thielke

7/2/2009 Field/Sampling Leader Laboratory Manager/Leader Gary Thompson TBD

4. Probl em Defi nition/Background Probl em Statem ent Karst topography and related surface features allow unusually fast transport of surface waters into the groundwater system. To measure this effect and the potential for pollutants to travel unabated through the system we will monitor active springs for rises in temperature after rainfall, and for those with a temperature signal we will take grab samples after rain events to characterize the chemical and biological pollutants present in the spring water.

Intended Usag e of Data This data will be correlated with stratigraphy, surface features in the area, soils data, land spreading of septic waste and animal manure, septic systems, historic features (filled karst features, old homesteads that might indicate an abandoned well), and current chemical data from wells in the area. The patterns of all these variables will indicate potential areas of higher vulnerability for the groundwater resource. The spring data will help to confirm the other observational data.

Project/Task Description Gen eral Overview of Project We hope to better understand the nature of the karst topography in the vicinity of the City of Viroqua. We also hope to generate a vulnerability map that can be tested against well water quality data, Ground Electrical Resistivity data and this data of spring water quality.

Project Timetabl e Activity Projected Start Date 7/09 Anticipated Date of Completion 7/09 Who Responsible

Temperature data logger installation Download data

Gary Thompson VSN

7/09

6/10

Gary Thompson VSN

7/2/2009 Activity Projected Start Date 7/09 Anticipated Date of Completion 8/09 Who Responsible

Baseline Chem, Physical, and bio data collection Chemical and e. Coli sampling Lab analysis of samples Final Report

Gary Thompson VSN

Fall 2009

Spring 2010 as needed Spring 2010 June 2010

Gary Thompson VSN

Fall 2009 June 2010

Kelvin Rodolfo and Lynn Chakoian

5.

Sampli ng Process Design

Rational e for Sel ection of Sa mpli ng Sites

We are selecting sites in the vicinity of the City of Viroqua and City of Westby. This area was selected because of municipal, and county landfill well log data that will assist in characterization of the stratigraphy, reported private and public well contamination in this area, and known karst features on the landscape. The springs will be active year around, accessible physically and landowner permissions, and widely dispersed over the study area. This is a pilot study and of limited areal scope in an effort to assess which observations provide the most information for the purpose of determining vulnerability of groundwater resources.

Sa mpl e Des ign Logistics

Type of Sa mpl e

Number of Sa mpl es

Sa mpli ng Frequency

Sa mpli ng Period

Projected Cost

7/2/2009 Type of Sa mpl e Number of Sa mpl es 28-36 Sa mpli ng Frequency Sa mpli ng Period Projected Cost TBD

Biological and Chemical

Baseline1

6 sites 2 to 3 times summer dry conditions and 2-3 after summer rain 4-6 sites and 4 events Collect data monthly When at the site Depends on the success of the Fall sampling

7/09 to 8/09

Biological and Chemical Physical

Event

16 to 24

9/09 to 11/09

TBD

Continuous temperature Flow, conductivity, pH Event

ongoing

7/09 to 6/10

$970

Field collected Data Spring Data Collection

Each sampling time As needed

7/09 to 6/10

TBD

4/10-6/10

TBD

Field Costs No. of Personnel Gary Thompson Student Intern Travel Distance TBD TBD Hourly Rate w/ Mileage $10/hr .585/mile $8/hr .585/mile Mileage TBD TBD

7. Sa mpli ng Method Requireme nts

We will try to minimize the baseline samples by comparing the first two sample results with springhead sampling results in Hydrologic assessment of the Kickapoo Watershed, southwestern Wisconsin by Stephen J. Gaffield, Kenneth R.Bradbury, and KennethW. Potter (1998).

7/2/2009

Parameter

Sa mpli ng Equipment In the field

Sa mpli ng Method

Cost

Flow, conductivity, pH, temperature

Temperature Datalogger2 pH meter Flow Conductivity

$900 VSN equip DNR will supply Cond, meter TBD

Total suspended solids, nitrite-nitrate, phosphorus

In Lab

Grab baseline and also take grab samples in fall or spring after rain events.

e. Coli

In Lab

Presence of e. Coli initial analysis and possibly run samples on # of colonies as needed

TBD

StowAway TidbiT submersible, 32K of memory, up to 7944 data points. Life expectency 4 1/2 yr. Accuracy plus/minus 0.2 degrees celcius. Temp. range -5 to 37 degrees celcius. This model is compatible with those used by the Vernon County LWCD that will help with data retrieval and analysis.

7/2/2009