TERMITE PROOFING TERMITE PROOFING (TRENCHES) HEPTACHLORE Lean Concrete (1:4:8) Ravi Sand & B.

Ballast Lean Concrete (1:4:8) Ravi Sand & B.Ballast

SFT LTS CFT BAGS CFT CFT CFT BAGS CFT CFT SFT BAGS CFT CFT KG LTRS

976.20 7.81 100.00 9.48 47.38 94.77 100.00 17.60 44.00 88.00 100.00 2.94 7.35 14.70 20.42 15.00 1.13 100.00 1.56 5.86 20.42 15.00 20.42

CEMENT OPC SAND RAVI


BRICK BALLAST Lean Concrete (1:2:4) Ravi Sand & B.Ballast

CEMENT OPC SAND RAVI


BRICK BALLAST Damp proof Course. 2" Horizontal D.P.C. (1:2:4)

CEMENT OPC SAND RAVI


AGGREGATE

BITUMEN
KEROSENE OIL Polythene Sheet VERTICAL D.P.C

CEMENT OPC SAND RAVI BITUMEN


KEROSENE OIL

WASTE WOOD
BRICK WORK IN SUB STRUCTURE ( G.Floor ) 13 1/2" thick (1:6)

SFT BAGS CFT KG LTRS Kgs

CEMENT OPC SAND RAVI BRICKS IST CLASS


R.C.C (1:2:4) using chenab sand crush. Footing

CFT BAGS CFT THOU

100.00 3.43 25.71 1.35

CEMENT OPC SAND CHENAB


AGGREGATE Steel

CFT BAGS CFT CFT Kg

100.00 17.60 44.00 88.00 272.23

Masonary up to slab level ( G.Floor ) BRICK WORK IN SUPER STRUCTURE 9" & 13 1/2" thick (1:6) (G.F)

15%
CFT BAGS 100.00 4.00

CEMENT OPC

SAND RAVI BRICKS IST CLASS

CFT THOU

25.00 1.35