OPERATING COSTS
Fringe ($)
Total Per
Hour ($)
Supervisors/Foremen
Dozer Operators including Challenger, small cranes (<15 tons), and roller (1)
21.42
8.24
1.00
75.00
30.66
Mechanics and crane operators (>15 tons and <100 tons) (1)
22.50
8.24
1.00
31.74
23.53
16.82
23.53
14.45
18.97
14.26
23.00
22.00
8.24
2.52
8.24
2.45
4.97
4.40
14.80
-
1.00
32.77
19.34
31.77
16.90
23.94
18.66
37.80
22.00
1. Rates are based on Davis Bacon Indices General Decision (1) AZ20030016 Modification 20 and (2) AZ20030012 Modification 19, dated 12/22/06 for Pima County Arizona (AZ20030016 is for heavy dam
construction, and AZ20030012 is for heavy construction based on non-union indexes).
2. The rate for the Foreman is based on industry standard.
Tetra Tech
July 2007
Page 1 of 2
Tetra Tech
Operating
Application at the
Hourly Rate ($)
Rosemont Project
Cost ($)/hour
874.00
5.46
6.91
874.00
5.46
6.46
3,520.00
22.00
34.58
3,202.50
20.02
2.00
14.97
8,640.00
54.00
7.56
14,000.00
87.50
48.68
15,000.00
93.75
80.74
4,997.00
31.23
45.55
16,000.00
100.00
134.00
27,000.00
168.75
101.90
22,000.00
137.50
90.25
20,667.00
129.17
65.31
6,000.00
37.50
35.17
4,400.00
27.50
25.10
4,400.00
27.50
25.10
21,050.00
131.56
67.89
4,600.00
28.75
54.52
33,600.00
210.00
42.57
6,080.00
38.00
30.45
2,300.00
14.38
58.35
5,200.00
32.50
27.30
2,500.00
15.63
8.10
6,720.00
42.00
38.89
1,680.00
10.50
9.96
July 2007
Regional
Adjustment
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Total Cost
/Hour ($)
12.37
11.92
56.58
22.02
14.97
61.56
136.18
174.49
76.78
234.00
270.65
227.75
194.48
72.67
52.60
52.60
199.46
83.27
252.57
68.45
72.73
59.80
23.73
80.89
20.46
Page 2 of 2