Best Practices
- Gensol Consultants Pvt Ltd
950 MW
750 MW
110 MW
950 MW
750 MW
110 MW
Rooftop and other small Phase I of have of the total projects JNNSM Financial Closures II of solar power plants Phase I & phase in covering plants of capacity connected of capacity up and EPC Contractors finalized. Solar Policy Gujarat place more than 5 MW to 2 MW
1/3rd
Vetting of Drawings
Plant Commissioning
Allocation
Execution
Land Finalization
Contractor Finalization
Onsite Monitoring
Land Finalization
IMPORTANT
Parameter
Metrological Resource Assessment Nearest Substation Accessibility to site Water Availability Nearby Terrain Site Topography Availability of Manpower GPS Survey Storm History Type of Soil Construction power availability
Purpose
Energy Generation Capacity of substation Availability of feeder Transmission Losses Ease of Delivery of materials Water requirement during construction Shadow Effects To analyze the water blockage problems and placement of mounting structures For Construction and subsequent O&M Site Layout Dust Losses Mounting Structure Strength To analyze the resistivity and load bearing capacity of soil Power Requirement during construction
Site Analysis and Solar radiation resource assessment Prefeasibility Analysis Technology Selection : Solar PV modules and BoS Acts as a Reference / Guidance Document Plant and Machinery (Solar PV array and Electrical System) As an instrument for Financial Closure Civil and Architectural requirement for the project Necessary for claiming Carbon Credits Annual energy generation from power plant System Schematics Power plant operation and maintenance Project implementation and schedule Project Financials Risk Analysis
Site Analysis and Solar radiation resource assessment Technology Selection : Solar PV modules and BoS Plant and Machinery (Solar PV array and Electrical System) Civil and Architectural requirement for the project Annual energy generation from power plant System Schematics Power plant operation and maintenance Project implementation and schedule Project Financials Risk Analysis
Arranging and coordinating pre/post bid meetings for clarification to the queries of bidders.
Defining Criteria for Comparison Determination of Minimum Qualification Criteria Assigning Weightage to Parameters Preparing Comprehensive Scoring Sheet Arriving at Final Scores for Responses from EPC Contractors Drawing Project Implementation & Drawdown Schedule Conducting Background Checks on Tie-ups for Equipment Supply Conducting Rounds of Negotiation
Contract Design
EPC Contractor
Experience in India and abroad | EPC & O&M Cost | Manpower Experience & Availability | Type & Extent of Guarantees Offered
Other Parameters
Office in India | Collaboration with International EPC Company
Contract Design
Contract Design
Purpose
Avoid Shading Losses Strength to withstand mechanical and wind loads Zinc Coating for 25 year corrosion free life Control Panel, Living Accommodation, Pantry,
CIVIL
Main Control Room Building Switchyard Water Pipes & Drainage Layout Approach Roads & Pathways Equipment Layout System Sizing (Cables, Inverters, Switchyard) Earthing Single Line Diagram
Bathrooms etc. To ensure proper strength of foundations for transformers and other equipment To avoid water logging To ensure proper access to all parts of the plant To minimize system losses For efficient working while ensuring redundancy To ensure safety of man and equipment To comprehend the fundamental structure of the plant
ELECTRICAL
Onsite Monitoring
Quality Control
Reporting Methodology
Monitoring
Factory Inspection
Compliance to standards
Commissioning of Plant
Commissioning Evacuation
Validating actual generation against guaranteed generation Validating the technical parameters of equipment Preparation of final acceptance tests Conducting performance tests after successful commissioning Schedule for periodic checks Preparation of annual maintenance contract along with final list of spares and tools
Commissioning of Plant
Commissioning Evacuation
Liasoning and approvals from authorized government bodies The following need to be communicated and finalized with the state utlities: Laying of transmission lines ABT meters Evacuation infrastructure Grid availability Dedicated feeder Evacuation point
Ideal Timeline
Project Activities
Completion of site visit and due diligence Bid Management EPC contractor finalization Vettings of designs and drawings Contract drafting Commissioning of 25% of Project Commissioning of 50% of Project Commissioning of 75% of Project Commissioning of 100% of Project Testing and Handing Over Evacuation arrangement
Take Away
It takes only 2% change in PLF to take a project from state of art to disastrous and vice versa, please make sure you are on the right side of this change.