Sie sind auf Seite 1von 6

No.

:IRCON/1008/J&K-SGR/ Water Boot at Island Platform/Anantnag/

Dated: ____/___/ 2008

NOTICE INVITING QUOTATION


To,
M/s …………………………………………………

…………………………………………………

…………………………………………………

…………………………………………………

Execution of Water Booth at Island Platform at Anantnag Station


Anantnag to Qazigund side Chainage 18/000 to 18260
Anantnag to Baramulla side Chainage 18/260 to 18/520

You are requessted to quote yor most compettive rates for above mentioned work in the enclosed BOQ and send
the offer back to the "Office of the JGM/Civil-IV, Tulsibagh, Srinagar, J&K, at 15.300 hours on ____/___/ 2008.
B.O.Q Rate (in Ref. D.S.R-
Item no. Description of Work Unit Amount
Quantity Rs.) 2007
1 2 3 4 5 6 7
SCHEDULE- 'A' ( CIVIL WORK )
Sub Head : 1- Earh Work

Earth work in excavation in foundation


trenches or drains (not exceeding 1.5m in
width or 10 sqm on plan) including dressing
2.8.1,
1 of sides and ramming of bottoms, lift upto Cum 12.000 103.40 1,240.80
Page-65
1.5m, including getting out the excavated
soil and disposal of surplus excavated soil
as directed, with in a lead of 50m

Excavating trenches of required width for


pipes, cables, etc. including excavation for
sockets depth up to 1.5 m including getting
out the excavated materials, returning the
soil as required in layers not exceeding 20
2
cm in depth including consolidating each
deposited layers by ramming, watering etc.
stacking serviceable materials for
measurements and diposal of unserviceable
material as directed, within a lead of 50m:

2.13.1.1,
2.1 Pipes, cables etc. not exceeding 80mm dia Rm 42.000 100.20 4,208.40
Page-65

Sub Head : 4- Concrete Work

Providing and laying in position cement


concrete of specified grade excluding the
3
cost of centering and shuttering all work
upto plinth level.

1:4:8 (1 Cement : 4 Coarse Sand : 8 Graded 4.1.8,


3.1 Cum 3.000 2449.00 7,347.00
Stone Aggregate 40 mm nominal size) Page-79

Page 1 of 6
Sub Head : 5- Reinforced Cement Concrete Work
Providing and laying in position machine
batched, machine mixed and machine
vibrated design mix cement concrete of
specified grade for reinforced cement
concrete work including pumping of concrete
to site of laying but excluding the cost of
centering, shuttering, finishing and
5.33,
4 reinforcement including admixtures in Cum 6.000 4147.40 24,884.40
Page-93
recommended proportions (as per IS 9103)
to accelerate, retard setting of concrete,
improve workability without impairing
strength and durability as per the direction of
Engineer-in-charge. M-25 grade reinforced
cement concrete by using 410kg. of cement
per cum of concrete.

Centering and shuttering including strutting,


5
propping etc. and removal of form for:
Walls (any thickness) including attached
5.9.2,
5.1 pilasters, buttresses, plinth and string Sqm 50.000 180.40 9,020.00
Page -89
courses etc.
Sub Head : 6 - Brick Work
Half brick masonry with FPS bricks of class
designation 75 in cement mortar 1:4 ( 1 6.13.2,
6 Sqm 15.000 302.80 4,542.00
Cement : 4 Coarse Sand) in super structure Page - 100
above plinth.
Sub Head : 11 - Flooring

Providing and fixing Ist quality ceramic


glazed wall tiles conforming to IS : 15622
(thickness to be specified by the
manufacture) of approved make in all colors,
shades except begundy, bottle green, black
of any size as approved by Engineer-in- 11.36,
7 Sqm 72.000 556.60 40,075.20
Charge in skirting, risers of steps and dados Page - 177
over 12 mm thick bed of Cement Mortar 1:3
(1 Cement : 3 Coarse sand) and jointing with
grey cement slurry @ 3.3kg per Sqm
including pointing in white cement mixed
with pigment of matching shade complete.

SUB-TOTAL FOR SCHEDULE -A 91,317.80 33


SCHEDULE- 'B' ( PIPE LINE WORK )
Sub Head : 18 - Water Supply
Providing and fixing C.P. brass bib cock of
18.49.1,
8 approved quality conforming to IS:8931 a) Each 24.000 313.10 7,514.40
Page 300
15 mm nominal bore
Providing and fixing G.I. pipes complete with
G.I. fittings and clamps, including cutting
9 Page 292
and making good the walls etc. (internal
work)
9.1 40mm dia. nominal bore Rm 24.000 264.05 6,337.20 18.10.5
9.2 50mm dia. nominal bore Rm 48.000 398.650 19,135.20 18.10.6
Conceled pipe including painting with anti
10 corrosive bitumastic paint, cutting chases Page 292
and making good the wall.
10.1 15mm dia. nominal bore Rm 24.000 144.75 3,474.00 18.11.1
10.2 25mm dia. nominal bore Rm 18.000 170.15 3,062.70 18.11.2
Providing and fixing G.I. Union in G.I. pipe
including cutting and threading the pipe and
11 18.46
making long screws etc. complete (new
work)
18.46.3, Page
11.1 25mm nominal bore Each 6.000 107.25 643.50
300
SUB-TOTAL FOR SCHEDULE -B 40,167.00 15

Page 2 of 6
SCHEDULE- 'C' ( STEEL )
Sub Head : 5- Reinforced Cement Concrete Work
Reinforcement for R.C.C. work including
12 straightening, cutting, bending, placing, in
position and binding all complete.
5.22.6,
12.1 Thermo mechanically treated bars. Kg 480 42.70 20,496.00
Page - 92
Sub Head : 10 - Steel Work
Steel work welded in built up
sections/framed work including cutting
13 hoisting, fixing in position and applying a
priming coat of approved steel primer using
structural steel etc.as required.
In gratings, frames, guard bar, ladders, 10.25.2,
13.1 Kg 2400.000 51.20 122,880.00
railings, brackets, gates & similar works. Page - 166
SUB-TOTAL FOR SCHEDULE -C 143,376.00 52

GRAND TOTAL FOR SCHEDULE- A, B & SCHEDULE- C 274,860.80 45,810.13

I/We offer my/our rates for:-


1) Schedule-A ………..................................…..%(figure)

……………………………………………………………………..… (in words) above/below/at par on above printed rates.

2) Schedule-B ………..................................…..%(figure)

……………………………………………………………………..… (in words) above/below/at par on above printed rates.

3) Schedule-3 ………..................................…..%(figure)

……………………………………………………………………..… (in words) above/below/at par on above printed rates.

Terms & Conditions:-


1 Payment:- Payment shall be based on the actual measurement on the site.
2 Period of Completion :- 45 days from the date of issue of letter.
3 Prices:- Rates shall be firm and final and no price variation shall be allowed on any account.
4 E.M.D:- E.M.D. not required.
Security Deposit:-10% Security Deposite will be deducted from on account bills, and it will be released after
5
successfull completion defect liability period.
6 All Statutory taxes, Vat etc. will be recovered as per Rules.
7 All work shall be carried out as per satisfaction of Engineer-in-charge.
8 Safety of all workers is Contractor's responsibility.
9 Defect Liability period : 45 days from the date of completion.

Page 3 of 6
Page 4 of 6
2.46

Page 5 of 6
%

Page 6 of 6