Sie sind auf Seite 1von 4

PROVISION OF DEVELOPING THE HSE CASE FOR TUKAU, WEST LUTONG, SIWA,

process
BAKAU, BAYAN, D18, TEMANA AND E11RC FOR PETRONAS CARIGALI SDN. BHD. –
SARAWAK OPERATIONS
TENDER NO.: S07/H/087

HUSNI SULAIMAN
TECHNICAL DIRECTOR
Position: Technical Director/Principal Engineer
Years of Experiences: 10
BSEng in Chemical Engineering with
Minor in Mathematics
Qualifications:
University of Pennsylvania,
Philadelphia, USA
Nationality: Malaysian
Age: 32

PROFESSIONAL EXPERIENCES

May 2005 - present Technical Director/Principal Engineer – Scientige Sdn


Bhd, Kuala Lumpur, Malaysia

Nov 1998 – Apr 2005 Facilities Surveillance Engineer – Exxonmobil Exploration


and Production Malaysia Inc.

May 2005 – Present

SCIENTIGE SDN BHD

Project Manager

Project Manager for the following projects:


1. Benefit Study & Optimization for Samarang Platform (PCSB-SKO) – On-Going
project.
2. Simulation Model Conversion for Petronas Carigali Sdn Bhd – Sarawak Operations
from HYSYS to Simsci Pro II. The following facilities covered under the project:
a. Bayan
b. Bakau
c. BNGB
d. D-18
e. Tukau
f. West Lutong
3. Equipment Based Pressure Relief Device Analysis for PSR-1 and PSR-2 of Petronas
Penapisan (Melaka) Sdn Bhd.
4. Provision of Data Management for Petronas Risk Based Inspection (P-RBI) for
Petronas Carigali Sdn Bhd – Sarawak Operations.
5. Provision for Area Development Plan for 14 gas fields for Petronas Carigali Sdn Bhd

Senior Engineer

Scientige Sdn Bhd


PROVISION OF DEVELOPING THE HSE CASE FOR TUKAU, WEST LUTONG, SIWA,
process
BAKAU, BAYAN, D18, TEMANA AND E11RC FOR PETRONAS CARIGALI SDN. BHD. –
SARAWAK OPERATIONS
TENDER NO.: S07/H/087

Balingian Line Re-Routing For Gas Supply Improvement to MLNG


HAZOP team leader for the review of the new system design of rerouting the gas to a lower
pressure system. Facilitated the session to identify risk associated with process, operation
and maintenance. Prepared HAZOP report and markup PFD and P&ID for HAZOP items
identification.

Senior Process Engineer

Area Development Plan (ADP) – Peninsular Gas Fields Development Project for
Petronas Carigali Sdn Bhd
Senior Process Engineer and Assistant Project Manager for the pre-conceptual studies for
the development of 14 new gas platforms. Responsible for technical work and project
management aspect that includes preparing and presenting progress report and project
schedule. Facilitated concept selection workshop by providing technical guidance and
expertise that resulted in 24 different network conceptual options. Simulated pipeline and
equipment sizing using Berwanger’s OGM software. Involved in researching and
cataloguing technology solution for CO2, H2S and mercury removal. Key personnel for
presenting preliminary and final result to client on 24 different network options and ranking
methodology.

Petronas Penapisan Melaka (M) Sdn Bhd – Equipment Based Relief Valve Analysis for
PSR-1 & PSR-2
Senior Process Engineer and Assistant Project Manager for the equipment based relief
valve analysis for over 1500+ units of relief valve at both PSR-1 & PSR-2. Involved in data
collection, project guideline discussion and population of relief valve data equipment-by-
equipment into Berwanger’s PPM software. Responsible for coordinating technical progress
presentation.

Development of Pressure Relief Device Guideline for Petronas Carigali Sdn Bhd
Senior Process Engineer and Assistant Project Manager for developing technical,
operations and maintenance guideline for pressure relief devices based on industry practise
as per API, ASME & DIERS requirement. Involved in preparation of project schedule and
progress report. Responsible for data collection, preparing preliminary guideline format and
presenting preliminary project background to client.

Relief Valve Analysis for Bay Way Refinery New Jersey and Marathon Oil Gas Plant in
USA
Project Manager for the Malaysian office for the equipment based relief valve analysis for
over 1000+ units of relief valve at both Bay Way Refinery and Marathon Oil Gas Plant.
Responsible for coordinating project between Malaysia-Houston and supervising 6 process
engineers in Malaysian office for execution of the project. Involved in initial data acquisition,
technical review and updating progress of the project.

Oct 2002 – Apr 2006

EXXONMOBIL PRODUCTION AND EXPLORATION MALAYSIA INC.

Scientige Sdn. Bhd.


PROVISION OF DEVELOPING THE HSE CASE FOR TUKAU, WEST LUTONG, SIWA,
process
BAKAU, BAYAN, D18, TEMANA AND E11RC FOR PETRONAS CARIGALI SDN. BHD. –
SARAWAK OPERATIONS
TENDER NO.: S07/H/087

Facilities Surveillance Engineer


Nov 1998 – Apr 2005
Primary responsibilities are:

1. Providing day-to-day facilities engineering technical support to Guntong field (1998 –


2001), Larut-A platform, Semangkok/Irong Barat field (2001-2003) and Terengganu
Crude Oil Terminal (TCOT) (2003 – 2005)
2. Analyzing key parameters and recommending action plan in order to maximize
production, reduce operation cost and increase safety standard
3. Identifying opportunities to be presented and matured as projects
4. Managing multiple small, technical retrofit projects for field
5. Performing Risk Assessment and HAZOP
6. Prioritizing asset workplan in accordance to company focus area and business plan

Asset Business Plan Development


Lead engineer responsible to assist Operation Superintendent in developing Guntong field
(1999 & 2000) and TCOT (2004) yearly business plan. Identify key focus areas in order to
align with company’s guiding principles. Creating specific objectives for the upcoming year
projects, uptime target, resource availability and expenditure profile.

Plant Shutdown Activities


Field engineer for coordinating platform shutdown activities for Guntong field (1999 – 2000).
Responsible to ensure smooth shutdown, timely back online and overall safe execution. This
is achieved by initiating team discussion, providing technical support during platform
shutdown and start up, and also implementing SIMOP procedures and safety initiatives.

Guntong D & Tabu B Gaslift Facilities


Lead the enhanced oil recovery (EOR) project that contributed 10 kbd of oil to the company
in 1999. Designed and installed the topside gaslift facilities which includes the gaslift
monitoring system (GLMS) and the safety protection device per API 14C requirement.
Involved in preparation of procedure and executing the Tabu-B gas lift pipeline dewatering
and commissioning prior to start-up of the Tabu-B gaslift facilities.

Guntong D Dehydration Module Design Support and Commissioning


Key interface between operations and project department for the project that enables
processing of associated gas for Guntong D per specification for sales of gas in 2000.
Heavily involved from during refinement of detailed design until startup and commissioning.
Contributed in the development of Design Basis Memorandum and Engineering Technical
Data Book and participated in various design and operability risk assessment prior to
construction. Led the Platform Safety Startup Review (PSSR), preparation of startup
procedures and table-top startup simulation for offshore personnel.

Larut-A New Platform Design Support and Commisioning


Key interface between operations and project department for the project that involves
integrating of processing facilities such as water injection system, gas compression and
sales system, gas dehydration system and cooling water facilities in 2000 to 2002. Heavily
involved during the refinement of the detailed design until startup and commissioning.

Scientige Sdn. Bhd.


PROVISION OF DEVELOPING THE HSE CASE FOR TUKAU, WEST LUTONG, SIWA,
process
BAKAU, BAYAN, D18, TEMANA AND E11RC FOR PETRONAS CARIGALI SDN. BHD. –
SARAWAK OPERATIONS
TENDER NO.: S07/H/087

Involved in Alarm & Shutdown Matrix review and water injection/gas compression/gas
dehydration system package review. Contributed in the development of Design Basis
Memorandum and Engineering Technical Data Book and participated in various design and
operability risk assessment prior to installation. Led the Platform Safety Startup Review
(PSSR), preparation of startup procedures and table-top startup simulation for offshore
personnel. Lead the start up activities for the first oil, MOL pump, gas dehydration system,
produced water system, cooling water system and water injection system.

New Contract for Production Chemical


Lead contracting engineer for initiatives to bid for new drag reducing agent, demulsifier and
water clarifier chemical in 2002 - 2005. Responsible for developing technical assessment
criteria based on recent field data, technical chemical analyses procedure based on ASTM
methods and executing “lab test” of chemical analyses at platform. Involved in the overall
technical assessment of chemical vendors and presentation to Petronas committee for
establishing long term contract.

TCOT Produced Water Skimmer Pit Re-Commissioning


Lead and coordinate re-comissioning activities of the produced water skimmer pit after fire
incident in 2004. Responsible to ensure safe and timely start up, all incident investigation
recommendations were closed out. Initiatives include grounding of electrical equipment,
major piping and transportation to prevent electric sparks and reduction of condensate
draining into the skimmer pit by re-designing piping.

PROFESSIONAL TRAINING & COURSE


• Surface Facilities Design
• Process Design School
• Practical Aspects of Control Instrumentations
• Gycol Dehydration System
• ABB DCS Graphic Configuration
• Risk Assessment Level 2
• HYSYS, FEP, DESC, Berwanger’s OGM & PPM
• Oil & gas industry standard codes i.e API 14C, API RP 500, etc
• Technical Writing Skills
• 7 Habits of Highly Effective People

EDUCATION & TRAINING


BSEng in Chemical Engineering with Minor in Mathematics
University of Pennsylvania, Philadelphia, USA.
1994 – 1998

Scientige Sdn. Bhd.

Das könnte Ihnen auch gefallen