Beruflich Dokumente
Kultur Dokumente
Capital Territory Architects Board GPO Box 1908 CANBERRA ACT 2601 T: (02) 6207 6288 F: (02) 6207 6324 E: architectsboard@act.gov.au
Candidate Identification
Full Name Address
NSW Architects Registration Board Level 2156 Gloucester St SYDNEY NSW 2000 T: (02) 9241 4033 F: (02) 9241 6144 E: mail@architects.nsw.gov.au
Northern Territory Architects Board PO Box 1680 DARWIN NT 0801 T: (08) 8999 8905 F: (08) 8999 8967 E: ntab@nt.gov.au
Phone No. Home Phone No. Work Phone No. Mobile Email
Board of Architects of Queensland PO Box 15343 City East QLD 4002 T: (07) 3224 4482 F: (07) 3225 8941 E: mail@boaq.qld.gov.au
State/ Territory
Architects Board of South Australia GPO Box 1270 ADELAIDE SA 5001 T: (08) 8373 2766 F: (08) 8372 6677 E: jbailey@gtsa.com.au
Board of Architects of Tasmania Royal Engineers Building 2 Davey Street HOBART TAS 7000 T: (03) 6234 8188 F: (03) 6234 2216 E: gharper@engineersaustralia.org.au
Architects Registration Board of Victoria Level 7372-376 Albert Street MELBOURNE VIC 3002 T: (03) 9417 4444 F: (03) 9417 4711 E:registrar@arbv.vic.gov.au
Architects Board of Western Australia 33 Broadway NEDLANDS WA 6009 T: (08) 9287 9920 F: (08) 9287 9926 E: info@architectsboard.org.au
Candidate
State/ Territory
Eligibility Status
Mandatory Experience
Element 2.1/2.1.2 2.1/2.1.4 3.1/3.1.2 3.1/3.1.4 3.2/3.2.3 3.2/3.2.5 3.3/3.3.1
No. of Elements Achieved Meets Requirements
Executive Level
Participant Level
Observer Level
Element Hours
Total Hours
Candidates are required to have:
l A minimum of 3000 hours , with
A minimum of 40 hours of experience in each of the 7 mandatory Prescribed Elements of l Competency, and
l
A minimum of 40 hours of architectural experience at Executive level in each of at least 3 of the mandatory Prescribed Elements of Competency, and No more than 160 hours of experience at Observer level in each of the Elements 3.2.3
l and 3.3.1 . These are the only 2 mandatory Prescribed Elements of Competency in which
Office Use Only o Accredited Qualification o Overseas Qualification/ RAE o NPrA o BWPrA o Application forms Part 1 & 2 o Statutory Declaration o Certified Copy of Degree/ AACA Letter o Statement of Practical Experience o Logbook Summary Sheets o Electronic Logbook o Application Fee Paid
Date Assessed: o Min 12 months post graduate experience o Min 12 months experience in Australia o Employee o Sole practitioner o No architect supervisor o 7 year in architecture + 3 years with architect o Other
Comments
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
SUMMARY OF MANDATORY EXPERIENCE FOR EXAMINATION PURPOSES NCSA 01/LB/SS Total per Element Total per Context
21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
SUMMARY OF MANDATORY EXPERIENCE FOR EXAMINATION PURPOSES NCSA 01/LB/SS Total per Element Total per Context
41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60
SUMMARY OF MANDATORY EXPERIENCE FOR EXAMINATION PURPOSES NCSA 01/LB/SS Total per Element Total per Context
61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80
SUMMARY OF MANDATORY EXPERIENCE FOR EXAMINATION PURPOSES NCSA 01/LB/SS Total per Element Total per Context
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
SUMMARY OF MANDATORY EXPERIENCE FOR EXAMINATION PURPOSES NCSA 01/LB/SS Total per Element Total per Context
21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
SUMMARY OF MANDATORY EXPERIENCE FOR EXAMINATION PURPOSES NCSA 01/LB/SS Total per Element Total per Context
41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60
SUMMARY OF MANDATORY EXPERIENCE FOR EXAMINATION PURPOSES NCSA 01/LB/SS Total per Element Total per Context
61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80
SUMMARY OF MANDATORY EXPERIENCE FOR EXAMINATION PURPOSES NCSA 01/LB/SS Total per Element Total per Context
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
SUMMARY OF MANDATORY EXPERIENCE FOR EXAMINATION PURPOSES NCSA 01/LB/SS Total per Element Total per Context
21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
SUMMARY OF MANDATORY EXPERIENCE FOR EXAMINATION PURPOSES NCSA 01/LB/SS Total per Element Total per Context
41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60
SUMMARY OF MANDATORY EXPERIENCE FOR EXAMINATION PURPOSES NCSA 01/LB/SS Total per Element Total per Context
61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80
SUMMARY OF MANDATORY EXPERIENCE FOR EXAMINATION PURPOSES NCSA 01/LB/SS Total per Element Total per Context
State/ Territory
Sheet No.
1
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
2
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
3
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
4
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
5
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
6
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
7
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
8
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
9
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
10
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
11
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
12
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
13
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
14
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
15
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
16
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
17
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
18
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
19
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
20
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
21
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
22
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
23
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
24
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
25
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
26
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
27
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
28
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
29
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
30
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
31
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
32
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
33
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
34
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
35
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
36
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
37
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
38
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
39
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
40
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
41
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
42
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
43
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
44
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
45
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
46
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
47
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
48
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
49
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
50
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
51
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
52
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
53
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
54
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
55
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
56
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
57
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
58
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
59
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
60
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
61
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
62
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
63
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
64
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
65
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
66
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
67
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
68
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
69
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
70
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
71
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
72
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
73
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
74
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
75
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
76
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
77
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
78
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
79
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1
State/ Territory
Sheet No.
80
Employer Supervising Architect Registration No.
Project
MONTHS
Use additional sheet for subsequent months
ROLE
Area Construction
Participant
Executive
Observer
Cost
Period From
Year
MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems
Element 2.1.4
Context 3.1
Element 3.1.2
Element 3.1.4
Context 3.2
To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies
Element 3.2.5
Context 3.3
Element 3.3.1