Capital Territory Architects Board GPO Box 1908 CANBERRA ACT 2601 T: (02) 6207 6288 F: (02) 6207 6324 E: architectsboard@act.gov.au

Architectural Practice Examination (APE) AACA Log Book Identification Information

Candidate Identification
Full Name Address

NSW Architects Registration Board Level 2156 Gloucester St SYDNEY NSW 2000 T: (02) 9241 4033 F: (02) 9241 6144 E: mail@architects.nsw.gov.au

Northern Territory Architects Board PO Box 1680 DARWIN NT 0801 T: (08) 8999 8905 F: (08) 8999 8967 E: ntab@nt.gov.au

Phone No. Home Phone No. Work Phone No. Mobile Email
Board of Architects of Queensland PO Box 15343 City East QLD 4002 T: (07) 3224 4482 F: (07) 3225 8941 E: mail@boaq.qld.gov.au

State/ Territory
Architects Board of South Australia GPO Box 1270 ADELAIDE SA 5001 T: (08) 8373 2766 F: (08) 8372 6677 E: jbailey@gtsa.com.au

Insert Photo Here

Board of Architects of Tasmania Royal Engineers Building 2 Davey Street HOBART TAS 7000 T: (03) 6234 8188 F: (03) 6234 2216 E: gharper@engineersaustralia.org.au

Architects Registration Board of Victoria Level 7372-376 Albert Street MELBOURNE VIC 3002 T: (03) 9417 4444 F: (03) 9417 4711 E:registrar@arbv.vic.gov.au

Architects Board of Western Australia 33 Broadway NEDLANDS WA 6009 T: (08) 9287 9920 F: (08) 9287 9926 E: info@architectsboard.org.au

Printed on 4/30/2012 @ 8:38 PM

Candidate

State/ Territory

Eligibility Status

Mandatory Competency Summary

Mandatory Experience
Element 2.1/2.1.2 2.1/2.1.4 3.1/3.1.2 3.1/3.1.4 3.2/3.2.3 3.2/3.2.5 3.3/3.3.1
No. of Elements Achieved Meets Requirements

Executive Level

Participant Level

Observer Level

Element Hours

Min. 40hrs 120 Hrs Achieved Executive

Sub Total Hrs

Total Hours
Candidates are required to have:
l A minimum of 3000 hours , with

A minimum of 40 hours of experience in each of the 7 mandatory Prescribed Elements of l Competency, and
l

A minimum of 40 hours of architectural experience at Executive level in each of at least 3 of the mandatory Prescribed Elements of Competency, and No more than 160 hours of experience at Observer level in each of the Elements 3.2.3

l and 3.3.1 . These are the only 2 mandatory Prescribed Elements of Competency in which

Observer level experience is accepted.

Office Use Only o Accredited Qualification o Overseas Qualification/ RAE o NPrA o BWPrA o Application forms Part 1 & 2 o Statutory Declaration o Certified Copy of Degree/ AACA Letter o Statement of Practical Experience o Logbook Summary Sheets o Electronic Logbook o Application Fee Paid

Date Assessed: o Min 12 months post graduate experience o Min 12 months experience in Australia o Employee o Sole practitioner o No architect supervisor o 7 year in architecture + 3 years with architect o Other

Comments

Candidate State/ Territory Sheet No.

EXECUTIVE EXPERIENCE SUMMARY SHEET


Employer Project Log Sheets Dates 2.1.2 2.1

HOURS COMPLETED AT EXECUTIVE LEVEL


3.1 2.1.4 3.1.2 3.1.4 3.2.3 3.2 3.2.5 3.3 3.3.1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
SUMMARY OF MANDATORY EXPERIENCE FOR EXAMINATION PURPOSES NCSA 01/LB/SS Total per Element Total per Context

Printed on 4/30/2012 @ 8:38 PM

Candidate State/ Territory Sheet No.

EXECUTIVE EXPERIENCE SUMMARY SHEET


Employer Project Log Sheets Dates 2.1.2 2.1

HOURS COMPLETED AT EXECUTIVE LEVEL


3.1 2.1.4 3.1.2 3.1.4 3.2.3 3.2 3.2.5 3.3 3.3.1

21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
SUMMARY OF MANDATORY EXPERIENCE FOR EXAMINATION PURPOSES NCSA 01/LB/SS Total per Element Total per Context

Printed on 4/30/2012 @ 8:38 PM

Candidate State/ Territory Sheet No.

EXECUTIVE EXPERIENCE SUMMARY SHEET


Employer Project Log Sheets Dates 2.1.2 2.1

HOURS COMPLETED AT EXECUTIVE LEVEL


3.1 2.1.4 3.1.2 3.1.4 3.2.3 3.2 3.2.5 3.3 3.3.1

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60
SUMMARY OF MANDATORY EXPERIENCE FOR EXAMINATION PURPOSES NCSA 01/LB/SS Total per Element Total per Context

Printed on 4/30/2012 @ 8:38 PM

Candidate State/ Territory Sheet No.

EXECUTIVE EXPERIENCE SUMMARY SHEET


Employer Project Log Sheets Dates 2.1.2 2.1

HOURS COMPLETED AT EXECUTIVE LEVEL


3.1 2.1.4 3.1.2 3.1.4 3.2.3 3.2 3.2.5 3.3 3.3.1

61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80
SUMMARY OF MANDATORY EXPERIENCE FOR EXAMINATION PURPOSES NCSA 01/LB/SS Total per Element Total per Context

Printed on 4/30/2012 @ 8:38 PM

Candidate State/ Territory Sheet No.

PARTICIPANT EXPERIENCE SUMMARY SHEET


Employer Project Log Sheets Dates 2.1.2 2.1

HOURS COMPLETED AT PARTICIPANT LEVEL


3.1 2.1.4 3.1.2 3.1.4 3.2.3 3.2 3.2.5 3.3 3.3.1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
SUMMARY OF MANDATORY EXPERIENCE FOR EXAMINATION PURPOSES NCSA 01/LB/SS Total per Element Total per Context

Printed on 4/30/2012 @ 8:38 PM

Candidate State/ Territory Sheet No.

PARTICIPANT EXPERIENCE SUMMARY SHEET


Employer Project Log Sheets Dates 2.1.2 2.1

HOURS COMPLETED AT PARTICIPANT LEVEL


3.1 2.1.4 3.1.2 3.1.4 3.2.3 3.2 3.2.5 3.3 3.3.1

21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
SUMMARY OF MANDATORY EXPERIENCE FOR EXAMINATION PURPOSES NCSA 01/LB/SS Total per Element Total per Context

Printed on 4/30/2012 @ 8:38 PM

Candidate State/ Territory Sheet No.

PARTICIPANT EXPERIENCE SUMMARY SHEET


Employer Project Log Sheets Dates 2.1.2 2.1

HOURS COMPLETED AT PARTICIPANT LEVEL


3.1 2.1.4 3.1.2 3.1.4 3.2.3 3.2 3.2.5 3.3 3.3.1

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60
SUMMARY OF MANDATORY EXPERIENCE FOR EXAMINATION PURPOSES NCSA 01/LB/SS Total per Element Total per Context

Printed on 4/30/2012 @ 8:38 PM

Candidate State/ Territory Sheet No.

PARTICIPANT EXPERIENCE SUMMARY SHEET


Employer Project Log Sheets Dates 2.1.2 2.1

HOURS COMPLETED AT PARTICIPANT LEVEL


3.1 2.1.4 3.1.2 3.1.4 3.2.3 3.2 3.2.5 3.3 3.3.1

61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80
SUMMARY OF MANDATORY EXPERIENCE FOR EXAMINATION PURPOSES NCSA 01/LB/SS Total per Element Total per Context

Printed on 4/30/2012 @ 8:38 PM

Candidate State/ Territory Sheet No.

OBSERVER EXPERIENCE SUMMARY SHEET


Employer Project Log Sheets Dates 2.1.2 2.1

HOURS COMPLETED AT OBSERVER LEVEL


3.1 2.1.4 3.1.2 3.1.4 3.2.3 3.2 3.2.5 3.3 3.3.1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
SUMMARY OF MANDATORY EXPERIENCE FOR EXAMINATION PURPOSES NCSA 01/LB/SS Total per Element Total per Context

Printed on 4/30/2012 @ 8:38 PM

Candidate State/ Territory Sheet No.

OBSERVER EXPERIENCE SUMMARY SHEET


Employer Project Log Sheets Dates 2.1.2 2.1

HOURS COMPLETED AT OBSERVER LEVEL


3.1 2.1.4 3.1.2 3.1.4 3.2.3 3.2 3.2.5 3.3 3.3.1

21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
SUMMARY OF MANDATORY EXPERIENCE FOR EXAMINATION PURPOSES NCSA 01/LB/SS Total per Element Total per Context

Printed on 4/30/2012 @ 8:38 PM

Candidate State/ Territory Sheet No.

OBSERVER EXPERIENCE SUMMARY SHEET


Employer Project Log Sheets Dates 2.1.2 2.1

HOURS COMPLETED AT OBSERVER LEVEL


3.1 2.1.4 3.1.2 3.1.4 3.2.3 3.2 3.2.5 3.3 3.3.1

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60
SUMMARY OF MANDATORY EXPERIENCE FOR EXAMINATION PURPOSES NCSA 01/LB/SS Total per Element Total per Context

Printed on 4/30/2012 @ 8:38 PM

Candidate State/ Territory Sheet No.

OBSERVER EXPERIENCE SUMMARY SHEET


Employer Project Log Sheets Dates 2.1.2 2.1

HOURS COMPLETED AT OBSERVER LEVEL


3.1 2.1.4 3.1.2 3.1.4 3.2.3 3.2 3.2.5 3.3 3.3.1

61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80
SUMMARY OF MANDATORY EXPERIENCE FOR EXAMINATION PURPOSES NCSA 01/LB/SS Total per Element Total per Context

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

1
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

2
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

3
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

4
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

5
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

6
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

7
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

8
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

9
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

10
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

11
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form of construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

12
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

13
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

14
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

15
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

16
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

17
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

18
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

19
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

20
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

21
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

22
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

23
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

24
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

25
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form of construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

26
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

27
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

28
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

29
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

30
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

31
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

32
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

33
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

34
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

35
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

36
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

37
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

38
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

39
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

40
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

41
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

42
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

43
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

44
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

45
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

46
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

47
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

48
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

49
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

50
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

51
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

52
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

53
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

54
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

55
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

56
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

57
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

58
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

59
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

60
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

61
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

62
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

63
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

64
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

65
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

66
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

67
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

68
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

69
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

70
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

71
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

72
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

73
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

74
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

75
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

76
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

77
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

78
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

79
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM

PROJECT BASED LOG SHEET NCSA LB/LS Candidate

State/ Territory

Sheet No.

80
Employer Supervising Architect Registration No.

Project

MONTHS
Use additional sheet for subsequent months

ROLE
Area Construction

Participant

Executive

Observer

Cost

Period From

Year

MANDATORY EXPERIENCE
Context 2.1
To generate documentation and clearly communicate information for an architectural project so that it can be costed, built and completed in accordance with the brief, time frame, cost and quality objectives Element 2.1.2
Prepare architectural drawings with regard to the location, extent of building elements, components, finishes, fittings and systems

Element 2.1.4

Co-ordinate the documentation of the project

Context 3.1

Confirm objectives and conditions at inception of project

Element 3.1.2

Establish site conditions

Element 3.1.4

Assess regulatory context

Context 3.2

To establish an appropriate procurement method and compile contractural arrangements with all participants Element 3.2.3
Prepare preliminary project evaluations, programs and feasibility studies

Element 3.2.5

Establish requirements for, and co-ordinate, specialists

Context 3.3

To provide contract administration for the construction of a project

Element 3.3.1

Administer a standard form construction contract

Printed on 4/30/2012 @ 8:38 PM