2 X 600 MW TORI THERMAL POWER PLANT INTERNAL COAL HANDLING SYSTEM TECHNICAL SPECIFICATION FOR IDLERS (ICHS) TSP NO 3003-H000-A00032-0016-1615-0002-R00
AEGIS LIMITED ESSAR ENGINEERING SERVICES DIVISION
DETAILS OF REVISION: DATE 03.05.2011 01.06.2011 DETAILS OF REVISION INITIAL ISSUE ISSUE REVISION NO. P00 R00
Page - 2 - of 22
2 X 600 MW TORI THERMAL POWER PLANT INTERNAL COAL HANDLING SYSTEM TECHNICAL SPECIFICATION FOR IDLERS (ICHS) TSP NO 3003-H000-A00032-0016-1615-0002-R00
AEGIS LIMITED ESSAR ENGINEERING SERVICES DIVISION
CONTENTS
CHAPTER NO. 1 2 3 4 5 6 7 8 9 ANNEXURE I II SITE CONDITIONS FORMAT FOR DEVIATION FROM TENDER DOCUMENT QUESTIONNAIRE TO BE FILLED IN AND SUBMITTED III WITH OFFER (A) IV V VI VII (B) TECHNICAL DATA SHEET APPLICATION DATA SHEET 18 20 21 17 14 16 DESCRIPTION GENERAL INFORMATION TECHNICAL SPECIFICATION SCOPE OF WORK INSPECTION & TESTING HSE REQUIREMNT DELIVERY PAINTING WORKMANSHIP & PERFORMANCE GUARANTEE DOCUMENTS TO BE SUPPLIED PAGE NO. 4 5 07 08 08 09 10 12 13
OVERALL SUPPLY & IMPLEMENTATION SHEDULE QUALITY ASSURANCE PLAN TECHNICAL SPECIFICATION DRAWINGS ( 7 SHEETS )
Page - 3 - of 22
2 X 600 MW TORI THERMAL POWER PLANT INTERNAL COAL HANDLING SYSTEM TECHNICAL SPECIFICATION FOR IDLERS (ICHS) TSP NO 3003-H000-A00032-0016-1615-0002-R00
AEGIS LIMITED ESSAR ENGINEERING SERVICES DIVISION
Chapter 01
01. GENERAL INFORMATION
ESSAR POWER JHARKHAND LTD. (EPJL) propose to install a 3 x 600 MW (present units of 2 x 600 MW and future units of 1 x 600MW) coal fired pit head based thermal power station near Chandwa Tehsil, Latehar district, Tori, Jharkhand. The coal for this project would be received from Chakla and Ashok karkata coal fields belonging to Essars captive coal mines in Eastern coal field basin. Coal handling system would be installed to meet the coal requirements for the proposed two (2) units receiving feed from the proposed mines.
This technical specification is intended to enable the Tenderer to submit a detailed offer for supply of Idlers for Internal Coal Handling Facility at Tori, Jharkand. The site climatic conditions are given in Annexure I.
Page - 4 - of 22
2 X 600 MW TORI THERMAL POWER PLANT INTERNAL COAL HANDLING SYSTEM TECHNICAL SPECIFICATION FOR IDLERS (ICHS) TSP NO 3003-H000-A00032-0016-1615-0002-R00
AEGIS LIMITED ESSAR ENGINEERING SERVICES DIVISION
Page - 5 - of 22
2 X 600 MW TORI THERMAL POWER PLANT INTERNAL COAL HANDLING SYSTEM TECHNICAL SPECIFICATION FOR IDLERS (ICHS) TSP NO 3003-H000-A00032-0016-1615-0002-R00
AEGIS LIMITED ESSAR ENGINEERING SERVICES DIVISION
e) For the impact type units, the rolls shall be made of rubber treads, rings or discs mounted on a steel tube and securely held in place. The rubber shall be of Natural rubber with Shore hardness of 55 to 65 on Scale A. f) Material of construction of shaft should be EN-8/C-40 solid bright bar.
g) Friction factor shall be below 0.015 h) T.I.R (Radial) should not exceed 1 mm. i) Axial float of shaft within assembled rollers shall not exceed 0.5mm. Following test shall be conducted at random on the assembled idlers. Visual checking for manufacturing quality Radial run out test Water ingress test Dust ingress test Friction factor test Axial float test.
Page - 6 - of 22
2 X 600 MW TORI THERMAL POWER PLANT INTERNAL COAL HANDLING SYSTEM TECHNICAL SPECIFICATION FOR IDLERS (ICHS) TSP NO 3003-H000-A00032-0016-1615-0002-R00
AEGIS LIMITED ESSAR ENGINEERING SERVICES DIVISION
a) The scope of work of the Tenderer shall consist of design, Engineering, manufacture, inspection, assembly, shop testing, painting at manufacturers shop, packing, loading and transportation supply F.O.R Essar Power (Jharkhand) Limited site in completely assembled condition. b) The scope of work shall stand supplement by such details as are given in specification or purchase order or contract or general specifications c) The Tenderer shall submit a dimensional scaled drawing showing all the details, in AutoCAD format and design report immediately on placement of order. The manufacturing shall be taken up only as per clients approved drawings. d) Erection instructions / manual, Spare parts manuals all other drawings & documents as required by the purchaser / his consultant.
Page - 7 - of 22
2 X 600 MW TORI THERMAL POWER PLANT INTERNAL COAL HANDLING SYSTEM TECHNICAL SPECIFICATION FOR IDLERS (ICHS) TSP NO 3003-H000-A00032-0016-1615-0002-R00
AEGIS LIMITED ESSAR ENGINEERING SERVICES DIVISION
Page - 8 - of 22
2 X 600 MW TORI THERMAL POWER PLANT INTERNAL COAL HANDLING SYSTEM TECHNICAL SPECIFICATION FOR IDLERS (ICHS) TSP NO 3003-H000-A00032-0016-1615-0002-R00
AEGIS LIMITED ESSAR ENGINEERING SERVICES DIVISION
Page - 9 - of 22
2 X 600 MW TORI THERMAL POWER PLANT INTERNAL COAL HANDLING SYSTEM TECHNICAL SPECIFICATION FOR IDLERS (ICHS) TSP NO 3003-H000-A00032-0016-1615-0002-R00
AEGIS LIMITED ESSAR ENGINEERING SERVICES DIVISION
II.
III.
IV. V. VI.
Surfaces which cannot be painted but require protection shall be given a coat of rust inhibitive grease according to standards. The general guideline followed for painting is follows:
Page - 10 - of 22
2 X 600 MW TORI THERMAL POWER PLANT INTERNAL COAL HANDLING SYSTEM TECHNICAL SPECIFICATION FOR IDLERS (ICHS) TSP NO 3003-H000-A00032-0016-1615-0002-R00
AEGIS LIMITED ESSAR ENGINEERING SERVICES DIVISION
Sl. No 1
Description Steel structure and Mechanical equipment (temp. not over 80 deg C) Both static and rotary equipment for indoor or outdoor duty Equipment with hot indoor or outdoor duty surface (temp. unto 200 deg C)
SP-Sa 2 1/2
2 coats of a single pack synthetic rubber based aluminum paint. {Air drying time - 2 hours (touch dry) DFT / coat - 25 microns, 24 hours (hard dry), Temperature resistance - up to 200 deg C dry heat, color - smooth aluminum} 2 coats of a single pack heat resistant silicon resin based paint with leafing aluminium, Air drying time - 3 to 4 hours (touch dry), 24 hours (hard dry), DFT / coat - 20 microns (min),Temperature resistance - up to 400 deg C dry heat, Colour - smooth aluminium
180
SP-Sa 2 1/2
SP-Sa 2 1/2
180
Page - 11 - of 22
2 X 600 MW TORI THERMAL POWER PLANT INTERNAL COAL HANDLING SYSTEM TECHNICAL SPECIFICATION FOR IDLERS (ICHS) TSP NO 3003-H000-A00032-0016-1615-0002-R00
AEGIS LIMITED ESSAR ENGINEERING SERVICES DIVISION
a) The material used and the fabrication carried out shall be new and best of its kind available and shall conform to relevant latest Indian and international standards. b) The warrantee shall cover faulty design/ material / workmanship. All rectifications or replacement under the warrantee shall be done by the supplier free of cost. c) The supplier shall warrantee for satisfactory performance of the facilities for a period of 30 months from the date of receipt at site by the purchaser or 18 months from the date of commissioning whichever is earlier. d) The Tenderer shall prepare and submit draft performance test procedure for approval.
Page - 12 - of 22
2 X 600 MW TORI THERMAL POWER PLANT INTERNAL COAL HANDLING SYSTEM TECHNICAL SPECIFICATION FOR IDLERS (ICHS) TSP NO 3003-H000-A00032-0016-1615-0002-R00
AEGIS LIMITED ESSAR ENGINEERING SERVICES DIVISION
Chapter 09 09.
DOCUMENTS TO BE SUPPLIED BY THE TENDERER WITH OFFER WHICH IS APPLICABLE
The following information/documents are to be submitted by the Tenderer along with the offer: a. Dimensional drawing of Idler rollers & frames showing dimensional and component details including rotating and total weight. b. Specifications, materials of construction of parts/ component along with standards and chemical composition. c. The deviation list filled in and submitted by the Tenderer as per Annexure-II. d. The questionnaire filled in and submitted by the Tenderer as per Annexure-III. e. Overall schedule as per Annexure-V.
f. Exclusions list if any. g. The following documents to be submitted along with the tendered offer :i. List of clients for whom such materials/equipment supplied. ii. Client Performance certificate. iii. Capacity of their plant and current assignment. iv. Approval for list of Inspection Agency. h. The following documents to be sent in 3 copies and in soft copies, one month before the supply
iii. Approved Dimensional and cross section drawing with all the details in AutoCAD format.
Page - 13 - of 22
2 X 600 MW TORI THERMAL POWER PLANT INTERNAL COAL HANDLING SYSTEM TECHNICAL SPECIFICATION FOR IDLERS (ICHS) TSP NO 3003-H000-A00032-0016-1615-0002-R00
AEGIS LIMITED ESSAR ENGINEERING SERVICES DIVISION
Nearest Railway Station & Distance Nearest Airport Latitude and Longitude Elevation above mean sea level Climatic conditions Temperatures : Annual basis Mean Maximum Temperature Mean Minimum Temperature Wet bulb temperature Relative humidity Annual average rainfall
48C 11C 28C 35.2% Annual average rainfall is about 1215 mm (most of which occurs during the monsoon season from June to October) 39m/sec. Zone - IV Non-Agriculture/Waste land Generally undulated Amanat River (Around 40 km from site)
4.2 4.3
Basic Wind Speed (Vz) as per IS 875 (Part-III) Seismic Zone Present use of land Topographical features of the site Source of Water Auxiliary power supply:
Auxiliary electrical equipment to be supplied against this specification shall be suitable for operation on the following system :
Page - 14 - of 22
2 X 600 MW TORI THERMAL POWER PLANT INTERNAL COAL HANDLING SYSTEM TECHNICAL SPECIFICATION FOR IDLERS (ICHS) TSP NO 3003-H000-A00032-0016-1615-0002-R00
AEGIS LIMITED ESSAR ENGINEERING SERVICES DIVISION
a) For motors rated above 1500 kW b) For motors rated 200 KW & 1500 kW c) For motors rated below 200 kW d) DC motor starters, DC solenoids, DC alarm, control and protections of Breakers e) AC control & protective devices
11000V, 3 phase, 3 wire, 50Hz medium earthed AC 3300V, 3 phase, 3 wire, 50Hz medium earthed AC 415V AC, 3-phase, 4-wire, 50 Hz effectively earthed 220V DC, 2 wire, unearthed DC
230V, 1 phase, 50Hz, 2 wire AC supply. The single-phase 110V AC supply shall be derived by CONTRACTOR BY PROVIDING 415V / 110V control transformers of adequate rating with MCCB / MCB on both the primary and secondary sides 230V, 1 phase, 50Hz, 2 wire AC supply 240V, 1 phase, 2 wire, 50Hz
h) The above voltages may vary as follows : All devices shall be suitable for continuous operation over the entire range of voltage and frequency indicated below without any change in their performance. Voltage variation 10% Frequency variation 5% Combined voltage & frequency variation 10% DC Supply .1 Voltage variation +10% -15% All the electrical equipment shall be designed for 50C reference ambient temperature. AC supply
6.0
Page - 15 - of 22
2 X 600 MW TORI THERMAL POWER PLANT INTERNAL COAL HANDLING SYSTEM TECHNICAL SPECIFICATION FOR IDLERS (ICHS) TSP NO 3003-H000-A00032-0016-1615-0002-R00
AEGIS LIMITED ESSAR ENGINEERING SERVICES DIVISION
Sl. No.
Clause No.
Tenderers Deviations
The Tenderer hereby certifies that the above mentioned are the only deviations from the tender documents.
: : : :
Page - 16 - of 22
2 X 600 MW TORI THERMAL POWER PLANT INTERNAL COAL HANDLING SYSTEM TECHNICAL SPECIFICATION FOR IDLERS (ICHS) TSP NO 3003-H000-A00032-0016-1615-0002-R00
AEGIS LIMITED ESSAR ENGINEERING SERVICES DIVISION
Page - 17 - of 22
2 X 600 MW TORI THERMAL POWER PLANT INTERNAL COAL HANDLING SYSTEM TECHNICAL SPECIFICATION FOR IDLERS (ICHS) TSP NO 3003-H000-A00032-0016-1615-0002-R00
AEGIS LIMITED ESSAR ENGINEERING SERVICES DIVISION
Annexure IV
(A) TECHNICAL DATA SHEET
Sr. No.
Idler Type. 35 Carrying Idlers 10 Transition Idlers 20 Transition Idlers S.A Carrying Idlers Impact Idlers Garland Type Return Idlers Flat Roll Type Return Idlers
ACTUAL QTY
SPARE QTY
1. 2. 3. 4. 5. 6.
340 10 10 30 40 200
7.
1800
50
10
60
3003-B000-A00032-0016-1618-0007
TOTAL
7200
Page - 18 - of 22
2 X 600 MW TORI THERMAL POWER PLANT INTERNAL COAL HANDLING SYSTEM TECHNICAL SPECIFICATION FOR IDLERS (ICHS) TSP NO 3003-H000-A00032-0016-1615-0002-R00
AEGIS LIMITED ESSAR ENGINEERING SERVICES DIVISION
(B) APPLICATION DATA SHEET BELT WIDTH: - 1800 MM 1) CONV. CAPACITY:a) DESIGN:- 2750 tph b) RATED :- 2500 tph 2) BELT SPEED:- 3.2m/s 3) IDLER SPACING:a) CARRYING:- 1.5m b) RETURN:- 3m 4) BELT WEIGHT :- 60 kg/m (max) 5) BELT TENSION:a) MAXIMUM RUNNING TENSION:- 193 kN b) MAXIMUM ACCELERATION TENSION:- 280 kN
Page - 19 - of 22
2 X 600 MW TORI THERMAL POWER PLANT INTERNAL COAL HANDLING SYSTEM TECHNICAL SPECIFICATION FOR IDLERS (ICHS) TSP NO 3003-H000-A00032-0016-1615-0002-R00
AEGIS LIMITED ESSAR ENGINEERING SERVICES DIVISION
S.NO
DESCRIPTION OF EQUIPMENT
QTY.
Page - 20 - of 22
2 X 600 MW TORI THERMAL POWER PLANT INTERNAL COAL HANDLING SYSTEM TECHNICAL SPECIFICATION FOR IDLERS (ICHS) TSP NO 3003-H000-A00032-0016-1615-0002-R00
AEGIS LIMITED ESSAR ENGINEERING SERVICES DIVISION
Annexure VI QUALITY ASSURANCE PLAN (QAP) a) QAP shall be prepared and furnished by supplier for all components.
b) Inspection and test requirements shall be decided with due consideration of factors like safety, duty cycle, operating conditions, equipment life, environment conditions, place of installation and statutory regulations, as applicable for a particular equipment. c) QAP shall clearly indicate the followings through use of codes in the appropriate columns: I. II. III Range of inspection & tests to be carried out by manufacturer and cross checked during manufacturing of equipment from raw materials to finishing stage. Suggestive check /hold points for CLIENT inspection and witnessing of tests during manufacturing and final product inspection. Details of test certificates, internal inspection reports and calibration certificates to be furnished by supplier / manufacturer to CLIENT. IV. Inspection documents to be furnished by supplier / manufacturers to CLIENT for reference during inspection along with acceptable norms as per codes / regulations. Test Certificates and Documents For each of the items being manufactured, following test certificates and documents in requisite copies including original shall be submitted to inspection agency. All test certificates must be endorsed by the manufactures and contractor with linkage to project, purchase order and acceptance criteria. I. Details of stage wise inspection II. Manufacturers bought out material test certificates III. Surface preparation and painting certificates
Page - 21 - of 22
2 X 600 MW TORI THERMAL POWER PLANT INTERNAL COAL HANDLING SYSTEM TECHNICAL SPECIFICATION FOR IDLERS (ICHS) TSP NO 3003-H000-A00032-0016-1615-0002-R00
AEGIS LIMITED ESSAR ENGINEERING SERVICES DIVISION
Annexure VII
LIST OF ENCLOSED DRAWINGS FOR TENDERER. S.NO 1 2 3 4 5 6 7 TENDERER DRAWING NO. 3003-B000-A00032-0016-1618-0001 3003-B000-A00032-0016-1618-0002 3003-B000-A00032-0016-1618-0003 3003-B000-A00032-0016-1618-0004 3003-B000-A00032-0016-1618-0005 3003-B000-A00032-0016-1618-0006 3003-B000-A00032-0016-1618-0007
Page - 22 - of 22