Sie sind auf Seite 1von 5

Title Of The Project: Sales & Customer Tracking System

Domain: COURSE: MCA-VI SEM.(PROJECT WORK) ROLL NO: NAME: AREA AND APPLICATION LANGUAGE USING INTERNAL GUIDE MAIL_ID MOBILE NO:(STUDENT)

.NET

Abstract

This Warehouse Management System project mainly deals with automating the tasks of maintaining and transacting the goods.In the Warehouse Management System inventory management is the key process.This process includes the activities such as maintenance of stock details, maintenance of receipts and items etc. It is a tedious job to maintain all these details manually. Hence we opted to automate the Warehouse Management System. Warehouse Management System automates the job of warehouse system. mainly includes five members . 1. 2. 3. 1. 2. Administrator Sub-Location In-charge Retailer Supplier Customer It

The Administrator has the priviligies to maintain different types of Products, Suppliers, Sub Location Incharges Databases in the warehouse.He is concerned Suppliers, Sub Location Incharges Databases in the warehouse.He is concerned.

The Sub location Incharges has privilige to maintain Products which are transformed from Administrator and registration of Retailers and all operations on these two databases The Retailer has priviligies to maintain Products at the corrosponding Retailer The supplier has priviligies to maintain parts Database and he can add parts and delete parts

In this Warehouse Management System has 5 Modules These are 1. 2. 3. 4. Master maintenance Receiving Shipment Billing

Objective:
This document contains a description for Sales & Customer Tracking System enhancement. This document will contain the functional requirements of the project and how the developers will enhance the project to achieve all the objectives. The SRS will serve as a guide for the client and the developers. Section 2 is concentrated more on the

Existing System:
Present system is manual. The Project Metrics has to enter all the details of project, documents, and tasks. It also maintenance the team information and also efforts estimation. For this purpose the organization maintain the size of the document, source code and update the information about team members details system manually. Which is much of time consuming process and more importantly it is error prone. Limitations Of the Manual

1. It is time consuming 2. It leads to error prone results 3. It consumes lot of manpower to better results 4. It lacks of data security 5. Retrieval of data takes lot of time 6. Percentage of accuracy is less 7. Reports take time to produce Hence Computerization of the existing system is proposed. The new system completely removes all manual burdens and provide efficient on the entry system.

Proposed System:

Objectives Of the Proposed System 1. To generate the quick reports 2. To make accuracy and efficient calculations 3. To provide proper information briefly 4. To provide data security 5. To provide huge maintenance of records 6. Flexibility of transactions can be completed in time After understanding the existing system and understanding the need for developing a new system different people involved in the related activities have been consulted. The data needed for the study has been collected from company records.

The

computerization

of

this

system

would

avoid

the

wrong

interpretation and bad calculation of data .The system help the user to see any documents, source code, tasks, activities, team information with details at the click of a button. The record data is maintained and backed up such a way that data is not loss. The speed of the system could also increased.

Action Plan:

Literature Survey Analysis/Design Coding Review of lit/coding Documentation Total

2 Days 3 Days 6 Days 2 Days 2 Days 2 Weeks

System Requirements:
OPERATING PLATFORM : RDBMS : WINDOWS 2000/NT/XP SQLSERVER 2000

SOFTWARE FRONT END TOOL

: :

VS.NET 2003 ASP.NET

Hardware Requirements:
Intel P4 1.5GHz or above 512MB RAM 80GB HDD Minimum

Das könnte Ihnen auch gefallen