2. COMPANY DOCUMENTS TO BE ENDORSED BY CONTRACTOR .........................................................4
3. DOCUMENTS NOT TO BE ENDORSED BY CONTRACTOR ....................................................................5
4. CONTRACTOR’S EXECUTIVE SUMMARY AND METHOD STATEMENT................................................6
The DESIGN DOSSIER comprises the Documents listed in items 2 – 4 of this EXHIBIT E, and
contained in separate volumes.
DOCUMENT
WP WU REFERENCE TITLE
ENDORSABLE DOCUMENTS
Work Package : Detailed Engineering - 18" Pipeline, Spool, Pieces & Risers
Work Unit : Design Documentation Review
2 2.1 SP1 230 SPFL 00 PL BR 201 Design Brief for 18" pipeline system
2 2.1 SP1 230 SPFL 00 PL DB 201 Design basis for 18" pipeline system
Work Package : Detailed Engineering - 18" Pipeline, Spool, Pieces & Risers
Work Unit : MTO's, Specs, Datasheets & Drawings for Pipeline and Risers
2 2.4 SP1 230 SPFL 00 PL AL 207 18" pipeline – Alignment sheets (4 sheets)
2 2.4 SP1 230 SPFL 00 PL DR 201 Drawing List
2 2.4 SP1 230 SPFL 00 PL DR 202 GENERAL NOTES
2 2.4 SP1 230 SPFL 00 PL DR 227 Pipeline typical anode details (+ attachment)
2 2.4 SP1 230 SPFL 00 PL DR 230 Riser Anchor Clamps - On SPP1 & SPD2 Jacket - Details
2 2.4 SP1 230 SPFL 00 PL DR 231 Riser Guide Clamps - On SPP1 & SPD2 Jacket - Details
2 2.4 SP1 230 SPFL 00 PL IS 215 Expansion spool piece at SPP1 - Isometric
2 2.4 SP1 230 SPFL 00 PL IS 218 Expansion spool piece at SPD2 - Isometric
2 2.4 SP1 230 SPFL 00 PL IS 221 Riser at SPP1 - Isometric
2 2.4 SP1 230 SPFL 00 PL IS 224 Riser at SPD2 - Isometric
2 2.4 SP1 230 SPFL 00 PL LY 205 18" In-field pipeline route
2 2.4 SP1 230 SPFL 00 PL LY 206 18" pipeline – Survey corridor
2 2.4 SP1 230 SPFL 00 PL LY 210 18" Infield - Spool Piece at SPP1 - General Arrangement
2 2.4 SP1 230 SPFL 00 PL LY 211 18" Infield - Spool Piece at SPD2 - General Arrangement
2 2.4 SP1 230 SPFL 00 PL LY 214 Expansion spool piece at SPP1 - Details
2 2.4 SP1 230 SPFL 00 PL LY 217 Expansion spool piece at SPD2 - Details
2 2.4 SP1 230 SPFL 00 PL LY 220 Riser at SPP1 (general layout + details)
2 2.4 SP1 230 SPFL 00 PL LY 223 Riser at SPD2 (general layout + details)
2 2.4 SP1 230 SPFL 00 PL LY 510 18'' Infield Pipeline system replacement- Pipeline only -spool piece at SPP1
2 2.4 SP1 230 SPFL 00 PL LY 511 18'' Infield pipeline system replacement-pipeline only - spool piece at SPD2
2 2.4 SP1 230 SPFL 00 PL MR 201 Requisition - Risers and Spool Piece - Line Pipe
2 2.4 SP1 230 SPFL 00 PL MR 202 Requisition - Risers and Spool Piece - Bend Pipe
2 2.4 SP1 230 SPFL 00 PL MR 203 Requisition - Flanges (including Gaskets, Bolts and Nuts)
2 2.4 SP1 230 SPFL 00 PL MR 204 Requisition - Pipeline Concrete Coating
2 2.4 SP1 230 SPFL 00 PL MR 205 Requisition - Sacrificial anodes
2 2.4 SP1 230 SPFL 00 PL MR 206 Requisition - Coal Tar Eramel
2 2.4 SP1 230 SPFL 00 PL MR 207 Requisition - Riser anti-corrosion coating
2 2.4 SP1 230 SPFL 00 PL SP 201 Specification - Risers and Spool Piece - Line Pipe
2 2.4 SP1 230 SPFL 00 PL SP 202 Specification - Risers and Spool Piece - Bend Pipe
2 2.4 SP1 230 SPFL 00 PL SP 203 Specification - Flanges (including Gaskets, Bolts and Nuts)
2 2.4 SP1 230 SPFL 00 PL SP 204 Specification - welding and NDT for Clad Line Pipe
2 2.4 SP1 230 SPFL 00 PL SP 205 Specification - Pipeline Concrete Coating
2 2.4 SP1 230 SPFL 00 PL SP 206 Specification - Pipeline Field Joint Coating
2 2.4 SP1 230 SPFL 00 PL SP 207 Specification - Sacrificial anodes
2 2.4 SP1 230 SPFL 00 PL SP 208 Specification - Coal Tar Eramel
2 2.4 SP1 230 SPFL 00 PL SP 209 Specification Riser anti-corrosion coating
As provided in Article XX of the AGREEMENT, the following documents are not required to be
formally endorsed by CONTRACTOR.
DOCUMENT
WP WU REFERENCE TITLE
4 4.1 SP1 230 SPFL 00 SA ST 302 Risk Assessment Analysis (installation w/o shut down)
4 4.4 SP1 230 SPFL 00 PL PR 330 Pipeline system pre-comissionning Outline procedure
Should, as the result of the evolution in CONTRACTOR’S design during the performance of the
detailed engineering WORK, a change(s) take place in the methodology, means, design
assumptions and criteria, or any other aspect, compared with the proposal set out in the Executive
Summary and Method Statement, CONTRACTOR shall not be entitled to any adjustment of the
CONTRACT PRICE nor WORK TIME SCHEDULE in respect of such change(s).
{Whilst this section will be finalised prior to the EFFECTIVE DATE, CONTRACTOR is
requested to advise its draft wording for initial consideration by COMPANY}