RATE ANALYSIS

10

Providing and constructing 75mm.thick bituminous bound macadam (BBM) road surface including supplying all materials, preparing the existing road surface, spreading 40mm.stone layers metal 30% crusher broken metal + 70% Hand broken metal (By breaking Rubble obtained by blasting) , heating and spraying the bitumen of VG-30( 60/70) grade @ 2 kg / sqm , spreading 12 mm.size chips compacting with power roller etc.complete including applying tack coat at the rate of 50 Kg./100 Sqm. on existing bitumen surface. CSR 60/PAGE 242

Add Transportation of Metal

0.10800

185.00000

175.00000 19.98000

Add Transportation of Bitumen 0.00250 4953.75000 12.38000


Diff In Bitumen Cost vide Ltr.Dated 1/10/2011 0.00250 3938.00000
9.85000 217.21000 217.20 Per sqm 11

43572.00-39634.00 = 3938

Total Say

Providing and constructing 75 mm.thick bituminious bound macadam (BBM) road surface including supplying all materials, preparing the existing road surface, spreading 40mm. stone metal layers 30% crusher broken metal + 70% Hand broken (by breaking rubble obtained by blasting) heating and spraying the bitumen of VG-30( 60/70) grade @ 2 Kg / sqm, spreading 12 mm.size chips compacting with power roller etc. complete. Including picking of existing WBM surface.CSR IT 59/241
150.00000

Add Transportation of Metal 0.10800 185.00000 19.98000 Add Transportation of Bitumen 0.00200 4953.75000 9.91000
Diff In Bitumen Cost vide Ltr.Dated 1/10/2011 0.00200 3938.00000
7.88000 187.77000 187.75

43572.00-39634.00 = 3938

Total Say

RATE ANALYSIS

12

Providing, laying and rolling open - graded premix surfacing (Hot Mix Hot Laid) of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using bitumen of VG-30 ( 60/70 grade) to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades. Including tack coat of VG30( 60/70) grade Bitumen @ 5kg/10 sq.m etc complete. (on B.T. Surface)CSR 72/Pg250 Add Transportation of CB Metal From Quarry to Plant 0.02700

89.50000

121.00000 2.42000 7.16000 2.48000 6.28000 7.72000 147.06000 147.05

Add Transportation of Bitumen Refinary to Plant 0.00146 4903.75000 Add Transportation of Bitumen Refinary to work site 0.00050 4953.75000
142.65 Add Transportation Of Bitumen Mix Material 0.04400 0.02*2.20 Diff In Bitumen Cost vide Ltr.Dated 1/10/2011 0.00196 3938.00000

43572.00-39634.00 = 3938
13

Total Say

Providing bituminous Premix seal coat to black top surface, including supplying all materials & bitumen of VG-30( 60/70) grade , preparing existing road surface, heating bitumen, mixing hot bitumen and chips, laying and rolling by static roller etc. complete. (Tack coat shall not be added CSR It 69/248

Add Transportation of CB Metal 0.00600 185.00000 Add Transportation of Bitumen 0.00068 4953.75000
Diff In Bitumen Cost vide Ltr.Dated 1/10/2011 0.00068 3938.00000

48.00000 1.11000 3.37000 2.68000 55.16000 55.15

43572.00-39634.00 = 3938

Total Say

18

Providing rubble filling of trap / granite / quartzite / gneiss stones in foundation including hand packing filling gravel / sand in the voids etc. complete. CSR It 1/222
Add Transportation of Rubble Add Transportation of Sand 1.000 0.300 58.300 290.280 Total Say

395.000 58.300 87.080 540.380 540.40

RATE ANALYSIS

19

Providing and laying in situ cement concrete of 1:4:8 proportion with trap / granite / quartzite / gneiss metal in foundation including necessary compacting and curing complete. (Including plywood/ steel formwork) The C.M. 1:3 plaster is considered for rendering uneven and honeycombed surface only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering/formwork will not be allowed).CSR 2/222
Add For Metal Add For Sand Add For Cement 0.90 0.47 3.40 53.00 290.28 5.96 Total Say 2520.000 47.70 136.43 20.26 2724.39 2724.40

20

Providing selected murum (having PI < 6 ) filling including laying in layers of 15 cm to 20 cm watering and compacting etc. complete.CSR 10/225
Add For Hard Murum 1.00 45.05 Total Say 225.00 45.05 270.05 270.05

21

Providing and laying cement concrete pipe of I.S. N.P.-2 class of 900 M.M. diameter in proper line, level and slope including providing, fixing collars or spigot and socket joint by rubber ring and in C.M.1:2 etc. complete.CSR 6/224
Add For Transportation Of Pipe 0.895 329.00 Total Say

2760.00 294.46 3054.46 3054.45

22

Providing and laying in situ cement concrete of M-15 / 1:2:4 with trap / granite / quartzite / gneiss metal in face wall including plywood/ steel formwork and steel centering, compaction by vibrator, finishing uneven and honeycombed surface with C.M.1:3 of sufficient minimum thickness to give smooth and even surface, filling joints with bitumen, curing etc. complete. (Excluding cost of reinforcement.) The C.M. 1:3 plaster is considered for rendering uneven and honeycombed surface only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering/formwork will not be allowed). CSR 3/223
Add For Metal Add For Sand Add For Cement 0.850 0.445 6.270 53.000 290.280 5.960 Total Say 3615.000 45.050 129.170 37.370 3826.590 3826.60

RATE ANALYSIS

RATE ANALYSIS

23

Providing cast in situ block of M-15 / 1:2:4cement concrete with circular or other shaped opening for waterway including necessary formwork, compaction, finishing and curing etc. complete.(for craddle)CSR 7/224
Add For Metal Add For Sand Add For Cement 0.850 0.445 6.270 53.000 290.280 5.960 Total Say

3700.00 45.05 129.17 37.37 3911.59 3911.60

Sectional Engineer

Sub Div Engineer Z.P. Sub Dn Wardha

MEASUREMENTS

S.No ITEM OF WORK NO L B 1 Dressing of side shoulder by mechanical 2 850.00 1.50 means including excavation of cutting shrubs and bushes spreading the excavated stuff & sectioning to the required line, level and slope etc. complete. CSR IT 135/PG 305 2 Excavation for road way by mechanical means earth soil of all sorts sand, gravel, soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts and spreading for embankment or stacking etc. as directed by Engineer in charge. CSR IT 2/PAGE NO 220 Supplying trap /granite /quartzite / gneiss stone metal of required size by bringing the boulders at the road side breaking them to required gradation including conveying the boulders and stacking the broken metal etc. complete. (Prior approval of sample stack of broken metal by the Ex.Engineer is necessary, the date of approval will form part of the measurements)b. By Breaking boulder (Hand broken) 40 MM CSR IT 31/PAGE 228 FOR PATCHES 10% 4 2
850.00 1.00

QUANTITY

2550.00

0.75

1275.00

1 1

200.00 3.00 700.00 3.00

0.10 0.10 Tot Qt

60.00 21.00 81.00

Supplying soft murum at the road side, including conveying and stacking complete. CSR IT NO 33/PAGE 229 FOR 40 M.M. 1/3 81.00 Supplying murum having PI < 6 at the road side, including conveying and stacking complete. CSR IT NO 32/PAGE NO 228 Spreading 40 mm metal including sectioning complete. CSR IT 39/229 Spreading gravel / sand / soft murum /avilable murum over rubble soling /W.B.M.surface blanketing berms etc.complete. CSR IT 37/229 2

Asper It 3

Tot Qt 900.00 1.00 0.10

27.00 27.00 180.00

6 7

Asper It 3

81.00 207.00

Aspe r It 4+5

Compacting the sub grade/gravel/ size metal (100 mm loose) layers for all widths with static roller including necessary, labour, materials and artificial watering complete. CSR IT 42/230 1 200.00 3.00 FOR PATCHES 10% 210 Tot Qt

600.00 210.00 810.00

MEASUREMENTS

S.No ITEM OF WORK NO L B 9 Compacting the hard murum side widths 2 900.00 1.00 layerwise on each side with static roller including necessary artificial watering complete . CSR IT 44/230 10 Providing and constructing 75mm.thick 1 700.00 3.00 bituminous bound macadam (BBM) road surface including supplying all materials, preparing the existing road surface, spreading 40mm.stone layers metal 30% crusher broken metal + 70% Hand broken metal (By breaking Rubble obtained by blasting) , heating and spraying the bitumen of VG-30( 60/70) grade @ 2 kg / sqm , spreading 12 mm.size chips compacting with power roller etc.complete including applying tack coat at the rate of 50 Kg./100 Sqm. on existing bitumen surface. CSR 60/PAGE 242 11 Providing and constructing 75 mm.thick bituminious bound macadam (BBM) road surface including supplying all materials, preparing the existing road surface, spreading 40mm. stone metal layers 30% crusher broken metal + 70% Hand broken (by breaking rubble obtained by blasting) heating and spraying the bitumen of VG-30( 60/70) grade @ 2 Kg / sqm, spreading 12 mm.size chips compacting with power roller etc. complete. Including picking of existing WBM surface.CSR IT 59/241 12 Providing, laying and rolling open - graded premix surfacing (Hot Mix Hot Laid) of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using bitumen of 60/70 grade to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades. Including tack coat of 60/70 grade Bitumen @ 5kg/10 sq.m etc complete. (on B.T. Surface)CSR NO 72/241 1
200.00 3.00

QUANTITY

1800.00

2100.00

600.00

900.00 3.00

2700.00

MEASUREMENTS

S.No ITEM OF WORK NO L B 13 Providing bituminous Premix seal coat to black 1 900.00 3.00 top surface, including supplying all materials & bitumen of 60/70 grade , preparing existing road surface, heating bitumen, mixing hot bitumen and chips, laying and rolling by static roller etc. complete. (Tack coat shall not be added)CSR IT 69/239 14 Providing and fixing R.C.C. 1:2:4 200 m. stone of size (15 X 10 X 65 cm ) as per I.R.C. design (IRC 26-1967) including cost of reinforcement @ 100 kg / cum), painting, numbering, fixing in standard size (35 X 30 X 40 cm ) C.C. 1:4:8 block etc complete. CSR IT 94/273 15 Providing R.C.C. 1:2:4 ordinary km. stones, for ODR and V.R. including cost of reinforcement @ 100 kg / cum) painting numbering etc. complete as per I.R.C. design (IRC 8-1980) for highway km.stone and fixing in standard size (67 X 50 X 60 cm ) C.C. 1:4:8 block etc complete. CSR IT 97/274 16 Providing and fixing informatory sign boards in square or rectangular shape of any size made out 16 guage (1.6 mm) thick mild steel sheet painted with one coat of zinc chromate stoving primer and two coats green back ground white border/messages, symbols etc. and back side in grey stove enamel paint including M.S. angle frame of 35 mm x 35 mm x 3 mm and two M.S.angle iron post of size 50 mm x 50 mm x 5 mm, 3.65 m long properly cross braced with angle iron of size 50 mm x 50 mm x 5 mm duly painted with alternate black and white bands of 25 cm width including G.I.fixtures etc. and fixing the board in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including transportation etc. complete.The nut bolts of board with angle iron post/supporting structure after fixing at site has to be electrically welded.Retroreflective sheeting should be with five years written warrenty from the manufacture & authorised distributor/convertor,for satisfactory field CSR 107/294 4

QUANTITY

2700.00

4.00

1.00

0.9

0.6

0.54

MEASUREMENTS

S.No

ITEM OF WORK

NO

QUANTITY

CD WORK AT CHAINAGE 0/525 17 Excavation for foundation in earth, soils of all types, sand, gravel soft murum etc. including shoring and strutting as necessary and disposing off excavated stuff within lead of 100 m as directed etc. complete.CSR 1/191 CHAINAGE 0/525 FOR PIPE 18 Providing rubble filling of trap / granite / quartzite / gneiss stones in foundation including hand packing filling gravel / sand in the voids etc. complete. CSR IT1/222 19 Providing and laying in situ cement concrete of 1:4:8 proportion with trap / granite / quartzite / gneiss metal in foundation including necessary compacting and curing complete. (Including plywood/ steel formwork) The C.M. 1:3 plaster is considered for rendering uneven and honeycombed surface only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering/formwork will not be allowed).CSR IT 2/222

2 1 2

6.60 4.41 6.60

1.70 1.30

0.50 1.00 Tot Qt 1.70 0.30

11.22 5.73 16.95 6.73

6.60

1.40

0.20

3.70

20 Providing selected murum (having PI < 6 ) filling including laying in layers of 15 cm to 20 cm watering and compacting etc. completeCSR 10/225 6.60 1.50 1.50 BELOW & AROUND PIPE 1 DEDUCT FOR PIPE -1 (7.50+ 0.785 1.00 6.55)/ 2
Tot Qt

14.85 -5.51

21 Providing and laying cement concrete pipe of I.S. N.P.2 class of 900 M.M. diameter in proper line, level and slope including providing, fixing collars or spigot and socket joint by rubber ring and in C.M.1:2 etc. complete.CSR 6/224

8.40

9.34 8.40

MEASUREMENTS

S.No ITEM OF WORK NO 22 Providing and laying in situ cement concrete of M-15 / 1:2:4 with trap / granite / quartzite / gneiss metal in face wall including plywood/ steel formwork and steel centering, compaction by vibrator, finishing uneven and honeycombed surface with C.M.1:3 of sufficient minimum thickness to give smooth and even surface, filling joints with bitumen, curing etc. complete. (Excluding cost of reinforcement.) The C.M. 1:3 plaster is considered for rendering uneven and honeycombed surface only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering/formwork will not be allowed). CSR 3/223 FOR FACE WALL 2

QUANTITY

6.15 (1.20+ 2.40 0.45)/ 2 0.45 0.45 0.50 INSCRIBING PILLER 2 DEDUCT FOR PIPE -2 (0.85+ 0.785 1.00 0.52)/ 2 Tot Qt 23 Providing cast in situ block of M-15 / 1:2:4cement concrete with circular or other shaped opening for waterway including necessary formwork, compaction, finishing and curing etc. complete.(for craddle) CSR 7/224 3 1.30 0.30 0.65 -1 2.36 0.785 1*0.3 Tot Qt 24 Providing and fixing A.C./ UPVC pipes of 100 5*2 0.75 mm diameter and of required length for relieving water pressure, stone filter as directed complete.(For weep holes in raft). CSR 16/198 FOR CRADLE DEDUCT FOR PIPE

24.35

0.20 -1.07

23.48

0.76 -0.56 0.20 7.5

Measurement Prepared By me

10

LEAD STATMENT

FOR W.B.M. PORTION


SR NO

MATERIAL

1 80 M.M.METAL 2 40 YELAKELI M.M.METAL 3 SOFT YELAKELI MURUM 4 HARD YELAKELI MURUM PI<6 5 RUBBLE 6 SAND For BT
SR NO

QUARRY LEAD CARTING % OF ACTUAL LOADING CHARGES MATERIAL CARTING YELAKELI 9.00 185.00 SAME 185.00 18.00 9.00 9.00 9.00 185.00 185.00 185.00 SAME
BELOW 15% BELOW 15%

UNLOADING

15.00 15.00 14.00 14.00

SUPPLAY ADD FOR TOTAL REMARK RATE ROYALTY 279.00 0.00 497.00 CSR 31 b (1) /234 302.00 130.00 140.00 0.00 0.00 0.00

185.00 157.25 157.25

18.00 15.00 15.00

520.00 316.25 326.25 422.50 621.48

CSR 31b (2) /228

CSR 33/235 CSR 32/234

YELAKELI SALPHAL

9.00 40.00

185.00 473.50

ABOVE 10%
BELOW 15%

203.50 402.48

18.00 15.00

15.00 14.00

186.00 190.00

0.00 0.00

CSR 30/234 CSR 34/229

MATERIAL

QUARRY LEAD CARTING % OF ACTUAL LOADING CHARGES MATERIAL CARTING YELAKELI to worksite Quarry to Plant Refinary to work site Refinary to Plant work site 9.00 185.00 SAME

UNLOADING

SUPPLAY ADD FOR TOTAL RATE ROYALTY

REMARK

1 All Sized Metal All Sized Metal 2 Bitumen 60/70

185.00 89.50 4818.75 4768.75 142.65

0.00 0.00 135.00 135.00 0.00

0.00 0.00 L/UL&H L/UL&H 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

185.00 89.50

Per Cum Per Cum

2.00 771.00

89.50 4818.75

SAME SAME

4953.75 Per Cum 4903.75 Per Cum 142.65 Per Cum

Bitumen 60/70 3 Bitumen mix Plant to

763.00 7.00

4768.75 158.50

SAME
BELOW 10%

Sectional Engineer

Sub Div.Engineer Z.P. Works Sub Dn Wardha

11

LEAD STATMENT

For CD Work
SR NO

MATERIAL

1 Rubble 2 C.B. Metal 3 Murum 4 Sand 5 Cement 6 Steel 7 RCC Pipe

QUARRY LEAD CARTING Rate For 5 ACTUAL % OF LOADING UNLOADING Payable CHARGES k.m. CARTING MATERIAL Net Rate Rate YELAKELI 9.00 185.00 132.00 53.00 ABOVE 10% 58.30 0.00 0.00 58.30 YELAKELI YELAKELI

Cum Cum Cum Cum Bag Mt Rmt

9.00 9.00 40.00 16.00 16.00 21.00

185.00 185.00 473.50 264.50 264.50 348.75

132.00 132.00 132.00 132.00 132.00 90.75

53.00 53.00

SAME
BELOW 15%

53.00 45.05 290.28 5.96 119.25 258.00

0.00 0.00 0.00 0.00 0.00 40.00

0.00 0.00 0.00 0.00 0.00 31.00

53.00 45.05 290.28 5.96 119.25 329.00

Salphal Wardha Wardha MIDC


Sevagram 15*18.15+

341.50 BELOW 15% 132.50 BELOW 10% 132.50 BELOW 10% 258.00 SAME

Sectional Engineer

Sub Div.Engineer Z.P. Works Sub Dn Wardha

12

NAME OF WORK

This Estimate has been framed to cover the cost of


STBT TO YELAKELI-ZADSHI ROAD TO GIROLI DAGHE

VR NO 15 KM 0/0 TO 0/850 Ta. Seloo,Dist Wardha AMOUNTING TO RS 1500000 AUTHORITY NECESSITY D.P.D.C. 2011-2012 There is existing wbm road which is in bad condition & there is no BT surface hence it is necessary to construct the road with the provision of stbt Following provisions are included in Estimate For Roads 1 40 m.m. metal one coat 2 Side berms is provided 3 50 m.m. thick BBM 4 20 m.m. thick carpet (H.M.H.L.) 5 Premix seal coat is provided 6 Information Sign Board For CD Work 1 Excavation for Foundation 2 Rubble Filling In Foundation 3 C.C. 1:4:8 For Bed C.C. 4 PCC M-15 (1:2:4) For Face Walls 5 RCC Pipes 900 m.m. Dia NP-2 Class RATES & SPECIFICATIONS Estimate has been prepared with rates effect from 1/09/2011 as per B.C.S.R. & work will be carried out as per Std. specifications of P.W.D. Department & time to time instructions from Engg. Incharge

PROVISIONS

SECTIONAL ENGINEER

SUB DIVISIONAL ENGINEER Z.P. WORKS SUB-DN WARDHA

NAME OF WORK

STBT UMARI MEGHE TO GANESHPUR ROAD UP TO HIGHWAY VR NO KM TO Ta,Dist Wardha

Sr No

DESCRIBTION AMOUNT Cost Of work as per Details attached Cost Of Road work Cost Of CD Work Add For Contanegency Total Amt Rs Say Rs 1350523.00 135494.00 13900.00 1499917.00 1500000.00

1 2 3

SECTIONAL ENGINEER

SUB DIVISIONAL ENGINEER Z.P. WORKS SUB-DN WARDHA

ESTIMATE DIVISION SUB DIVISION FUND HEAD SUB HEAD


Estimate has been framed in office of & scrutinized in office of Deputy Engineer works sub division wardha for the probable expenses that will incurred on STBT TO YELAKELIZADSHI ROAD TO GIROLI DAGHE Estt. Cost Rs. 1500000 Z.P. works Division Wardha

Z.P. Works Sub Division Wardha DPDC FUND 2011/2012

Administratively approved under Technically sanctioned by Estimate prepared by Checked by


S.R. DOLE SECTIONAL ENGINEER Z.P.SUB DN WARDHA

GENERAL DESCRIPTION
Estimate has been prepared with rates effect from 1/09/2011 as per B.C.S.R. & work will be carried out as per Std. specifications of P.W.D. with following provisions - ( ) .. .. / / .

Deputy Engineer

Sectional

Engineer

ZILLA PARISHAD ,WORKS DIVISION WARDHA

DPDC FUND 2011/2012

DETAILED ESTIMATE STBT TO YELAKELI-ZADSHI ROAD TO GIROLI DAGHE K.M. 0/0 TO 0/900

ESTIMATE COST RS

1500000

ABSTRACT

S.NO.

ITEM OF WORK

QUANTITY

RATE
10.50

PER
ONE SQM

AMOUNT
26775.00

Dressing of side shoulder by mechanical means 2550.00 including excavation of cutting shrubs and bushes spreading the excavated stuff & sectioning to the required line, level and slope etc. complete. CSR IT 135/PG 305 Excavation for road way by mechanical means 1275.00 earth soil of all sorts sand, gravel, soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts and spreading for embankment or stacking etc. as directed by Engineer in charge. CSR IT 2/PAGE NO 226 Supplying trap /granite /quartzite / gneiss stone metal of required size by bringing the boulders at the road side breaking them to required gradation including conveying the boulders and stacking the broken metal etc. complete. (Prior approval of sample stack of broken metal by the Ex.Engineer is necessary, the date of approval will form part of the measurements)b. By Breaking boulder (Hand broken) 40 MM CSR IT 31/PAGE 234 Supplying soft murum at the road side, including conveying and stacking complete. CSR IT NO 33/PAGE 235 Supplying murum having PI < 6 at the road side, including conveying and stacking complete. CSR IT NO 32/PAGE NO 234 Spreading 40 mm metal including sectioning complete. CSR IT 39/235 Spreading gravel / sand / soft murum /avilable murum over rubble soling /W.B.M.surface blanketing berms etc.complete. CSR IT 37/235 Compacting the sub grade/gravel/ size metal (100 mm loose) layers for all widths with static roller including necessary, labour, materials and artificial watering complete. CSR IT 42/236 Compacting the hard murum side widths layerwise on each side with static roller including necessary artificial watering complete . CSR IT 44/236
81.00

59.00

ONE CUM

75225.00

520.00

ONE CUM

42120.00

27.00

316.25

ONE CUM ONE CUM ONE CUM ONE CUM ONE SQM

8539.00

180.00

326.25

58725.00

6 7

81.00 207.00

20.00 14.00

1620.00 2898.00

810.00

12.00

9720.00

1800.00

3.00

ONE SQM

5400.00

17

ABSTRACT

S.NO.

ITEM OF WORK

QUANTITY

RATE

PER
ONE SQM

AMOUNT
456120.00

10 Providing and constructing 75mm.thick bituminous 2100.00 217.20 bound macadam (BBM) road surface including supplying all materials, preparing the existing road surface, spreading 40mm.stone layers metal 30% crusher broken metal + 70% Hand broken metal (By breaking Rubble obtained by blasting) , heating and spraying the bitumen of VG-30( 60/70) grade @ 2 kg / sqm , spreading 12 mm.size chips compacting with power roller etc.complete including applying tack coat at the rate of 50 Kg./100 Sqm. on existing bitumen surface. CSR 60/PAGE 242 11 Providing and constructing 75 mm.thick 600.00 187.75 bituminious bound macadam (BBM) road surface including supplying all materials, preparing the existing road surface, spreading 40mm. stone metal layers 30% crusher broken metal + 70% Hand broken (by breaking rubble obtained by blasting) heating and spraying the bitumen of VG30( 60/70) grade @ 2 Kg / sqm, spreading 12 mm.size chips compacting with power roller etc. complete. Including picking of existing WBM surface.CSR IT 59/241 12 Providing, laying and rolling open - graded premix 2700.00 147.05 surfacing (Hot Mix Hot Laid) of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using bitumen of 60/70 grade to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades. Including tack coat of 60/70 grade Bitumen @ 5kg/10 sq.m etc complete. (on B.T. Surface)CSR NO 72/241 13 Providing bituminous Premix seal coat to black top 2700.00 surface, including supplying all materials & bitumen of 60/70 grade , preparing existing road surface, heating bitumen, mixing hot bitumen and chips, laying and rolling by static roller etc. complete. (Tack coat shall not be added)CSR IT 69/239
55.15

ONE SQM

112650.00

ONE SQM

397035.00

ONE SQM

148905.00

18

ABSTRACT

S.NO.

ITEM OF WORK

QUANTITY

RATE
265.00

PER
NOS

AMOUNT
1060.00

14 Providing and fixing R.C.C. 1:2:4 200 m. stone of size (15 X 10 X 65 cm ) as per I.R.C. design (IRC 26-1967) including cost of reinforcement @ 100 kg / cum), painting, numbering, fixing in standard size (35 X 30 X 40 cm ) C.C. 1:4:8 block etc complete. CSR IT 93/283 15 Providing R.C.C. 1:2:4 ordinary km. stones, for ODR and V.R. including cost of reinforcement @ 100 kg / cum) painting numbering etc. complete as per I.R.C. design (IRC 8-1980) for highway km.stone and fixing in standard size (67 X 50 X 60 cm ) C.C. 1:4:8 block etc complete. CSR IT 96/284 16 Providing and fixing informatory sign boards in square or rectangular shape of any size made out 16 guage (1.6 mm) thick mild steel sheet painted with one coat of zinc chromate - stoving primer and two coats green back ground white border/messages, symbols etc. and back side in grey stove enamel paint including M.S. angle frame of 35 mm x 35 mm x 3 mm and two M.S.angle iron post of size 50 mm x 50 mm x 5 mm, 3.65 m long properly cross braced with angle iron of size 50 mm x 50 mm x 5 mm duly painted with alternate black and white bands of 25 cm width including G.I.fixtures etc. and fixing the board in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including transportation etc. complete.The nut bolts of board with angle iron post/supporting structure after fixing at site has to be electrically welded.Retroreflective sheeting should be with five years written warrenty from the manufacture & authorised distributor/convertor,for satisfactory field CSR 107/294 Total Cost Of Road Work

4.00

1.00

1220.00 NOS

1220.00

0.54

4650.00

ONE SQM

2511.00

1350523.00

Sectional Engineer

Sub Div.Engineer Z.P. Works Sub Dn Wardha

19

ABSTRACT

S.NO.

ITEM OF WORK

QUANTITY

RATE

PER

AMOUNT

CD WORK AT CHAINAGE 0/525 17 Excavation for foundation in earth, soils of all types, sand, gravel soft murum etc. including shoring and strutting as necessary and disposing off excavated stuff within lead of 100 m as directed etc. complete.CSR 1/191 18 Providing rubble filling of trap / granite / quartzite / gneiss stones in foundation including hand packing filling gravel / sand in the voids etc. complete. CSR IT1/222 19 Providing and laying in situ cement concrete of 1:4:8 proportion with trap / granite / quartzite / gneiss metal in foundation including necessary compacting and curing complete. (Including plywood/ steel formwork) The C.M. 1:3 plaster is considered for rendering uneven and honeycombed surface only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering/formwork will not be allowed).CSR IT 2/222 20 Providing selected murum (having PI < 6 ) filling including laying in layers of 15 cm to 20 cm watering and compacting etc. completeCSR 10/225 21 Providing and laying cement concrete pipe of I.S. N.P.2 class of 900 M.M. diameter in proper line, level and slope including providing, fixing collars or spigot and socket joint by rubber ring and in C.M.1:2 etc. complete.CSR 6/224

16.95

125.00

ONE CUM

2119.00

6.73

540.40

ONE CUM

3637.00

3.70

2724.40

ONE CUM

10080.00

9.34

270.05

ONE CUM

2522.00

8.40

3054.45 RMT

25657.00

20

ABSTRACT

S.NO.

ITEM OF WORK

QUANTITY

RATE
3826.60

PER
ONE CUM

AMOUNT
89849.00

22 Providing and laying in situ cement concrete of M15 / 1:2:4 with trap / granite / quartzite / gneiss metal in face wall including plywood/ steel formwork and steel centering, compaction by vibrator, finishing uneven and honeycombed surface with C.M.1:3 of sufficient minimum thickness to give smooth and even surface, filling joints with bitumen, curing etc. complete. (Excluding cost of reinforcement.) The C.M. 1:3 plaster is considered for rendering uneven and honeycombed surface only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering/formwork will not be allowed). CSR 3/223 23 Providing cast in situ block of M-15 / 1:2:4cement concrete with circular or other shaped opening for waterway including necessary formwork, compaction, finishing and curing etc. complete.(for craddle) CSR 7/224 24 Providing and fixing A.C./ UPVC pipes of 100 mm diameter and of required length for relieving water pressure, stone filter as directed complete.(For weep holes in raft). CSR 16/198
Total Cost Of CD Work

23.48

0.20

3911.60

ONE CUM

782.00

7.50

113.00

RMT

848.00

135494.00

Sectional Engineer

Sub Div.Engineer Z.P. Works Sub Dn Wardha

21