Beruflich Dokumente
Kultur Dokumente
Thermal 100,000 54.93% 90,000 80,000 70,000 60,000 50,000 40,000 30,000 20,000 10,000 0
Renewable 11.65%
Gas 9.76%
*Biomass (agri wastes/ residues) + Bagasse Cogen.+ Urban/industrial wastes ** Up-scaled to 1100 MW by March 2013 under NSM.
3
Decentralised RE Systems
1.6 million Solar PV lighting systems/ small plants 7500 nos. SPV pumps 4.63 million sqm. Solar thermal collectors, mainly for water heating/ steam generation/ cooking 4.5 million Family-size biogas plants 1.1 MW Aero-generators/hybrid Systems 130 MW Biomass Gasifiers for rural energy needs 300 MW biomass power (non-bagasse) 70 MW Waste to Energy plants- mainly industry
General Constraints
Intermittent nature - Low PLFs (17- 70%) resource/location specific - Need for storage - Grid synchronization/ capacity limitations Higher capital cost/ MW , esp. Solar vis--vis Conventional PPs Fiscal /financial concessions requirement for financial viability Involvement of private and forest land States policies and interest.
Main Strategy
Conducive policy & regulatory framework Financial/ fiscal incentives; Performance based incentivisation Reduce cost of RE technologies through R&D Promote decentralized/distributed generation for local energy needs
Wind Power
Potential Achievement : : 49,000 MW 14,989 MW
(as on 31.08. 11)
11th Plan Target/ Achievement: Deployment target 12th Plan : Deployment target 13th Plan :
Strategy: GBI scheme to be reviewed after 11th Plan and continued for 12th Plan for up to 4,000 MW capacity projects. Wind Resource activities to be extended to unexplored areas Development of Off-shore wind power to be explored.
Wind Power
Wind Resource Assessment : Over 1100 wind monitoring stations in 31States/UTs Seven handbooks on Wind Energy Resource published Wind Atlas for the country has been prepared
11th Plan Target/ Achievement: Deployment target 12th Plan : Deployment target 13th Plan :
10
Biomass Power
Potential Achievement : : 17000 MW 1082 MW
(as on 31.08. 11)
11th Plan Target/ Achievement: Deployment target 12th Plan : Deployment target 13th Plan : Strategy:
Promotion of small capacity biomass projects with biomass linkage and captive plantations.
11
Bagasse Cogeneration
Potential : 5000 MW 1780 MW (as on 31.08. 11) 1200 MW/ 1155 MW 1400 MW. 1500 MW.
Achievement : 11th Plan Target/ Achievement: Deployment target 12th Plan : Deployment target 13th Plan : Strategy:
Promotion of BOOT/BOLT model in cooperative sector sugar mills. Promotion of optimum cogeneration potential in small size sugar mills (<2500 TCD).
12
Solar Power
Potential : : 30-50 MW/ sq. km 5,000 trillion KWh/year 46 MW (as on 31.08. 11) 1100 MW/ 43 MW + about 800 MW in pipeline (?) 4000 MW. 15000 MW.
13
200 MW
40.65 MW sanctioned
Total 100 MW sanctioned by March,2012 5.7 million sq. meters total by March, 2012.
14
Solar collectors
In addition, 100 MW capacity distributed small grid connected power plants during Phase -1.
Grid solar power (MW) Off-grid Applicationa (MW)
15000
5000
25 20 20 20
15 10 10 7 5 5 10
15
Wind power Small Hydro Biomass Power Bagasse Cogeneration Waste to Power Solar Power
TOTAL
> 1,87,200
21,126
23,020
45,500
81,300
16
21,125 48
1,60,195 1052
1,78,000 1170
2,63,000 1728
3,63,000 2385
1,81,320 1100
2,01,000 1221
3,08,500 1824
4,44,300 2551
11.65% 4.36 %
11.44% 4.18%
14.75% 5.26%
18.30% 6.51%
17
18
19
1 MW PV Plant at Osamabad
20
21
Solar Thermal System for Steam Generation at ITC Hotel, New Delhi
22
Thank You!
23