Entec has an international reputation in the field of process safety and risk management. It is particularly associated with high hazard industries where highly flammable materials may be stored and transported under pressure or as liquefied gases. One such storage and loading export facility currently under construction in northern europe.
Entec has an international reputation in the field of process safety and risk management. It is particularly associated with high hazard industries where highly flammable materials may be stored and transported under pressure or as liquefied gases. One such storage and loading export facility currently under construction in northern europe.
Copyright:
Attribution Non-Commercial (BY-NC)
Verfügbare Formate
Als PDF, TXT herunterladen oder online auf Scribd lesen
Entec has an international reputation in the field of process safety and risk management. It is particularly associated with high hazard industries where highly flammable materials may be stored and transported under pressure or as liquefied gases. One such storage and loading export facility currently under construction in northern europe.
Copyright:
Attribution Non-Commercial (BY-NC)
Verfügbare Formate
Als PDF, TXT herunterladen oder online auf Scribd lesen
Liquefied Natural Gas Terminals Tractebel Gas Engineering
Improving safety and
operability efficiently and effectively
to assess the design of the facility
effectively and efficiently, a task further complicated by the team comprising six nationalities. The study was completed within the required time scale and to the satisfaction of the separate parties involved. The other study, chaired concurrently by another Entec representative was held so Entec has an international reputation in the design phase. The facility is designed to that a fixed price sum for the terminal could field of process safety and risk handle and export LNG, liquefied be quoted to one of the operating partners. management, which is particularly petroleum gas (LPG), and condensate. It was recognised that the study was associated with high hazard industries Entec’s services included quantified risk performed somewhat earlier than would be where highly flammable materials may be assessment (QRA) of the storage and usual for a review of a detailed design. stored and transported under pressure or as loading facility, design accident load liquefied gases. Entec’s knowledge in this (DAL) assessment and design criteria for The primary objective was to identify field stems from a long history of advising the facility, escalation analysis, fire safety issues with the design that could have a clients on the risks and safety matters engineering, hazardous area classification, major impact on the scope, and hence cost, related to such activities. It also comes and general process safety advice. of the installation, as well as to resolve any from the experience gained as a result of potential safety matters. involvement in high profile accident Entec engineers have also facilitated HAZOP (hazard and operability) studies of Rather than being a critical, adversarial investigations such as the Piper Alpha storage and loading facilities for two other audit of the design, effective HAZOP Disaster Inquiry and subsequent litigation. LNG terminals, one to be located in studies take a collaborative approach to One of the many clients to recognise this Southern Europe and the other in the enhancing safety and resolving potential expertise is Tractebel Gas Engineering Bahamas. operability issues. In this way, designers (TGE), which Entec has advised in matters have the opportunity to critically review associated with process safety and risk The first HAZOP study was for an LNG and improve their own design with the help management for the design and storage and loading facility where the of other experienced engineers and safety construction of liquefied natural gas (LNG) detailed design had already been conducted practitioners. Effective resolution of issues terminals. and frozen for analysis. The study involved at this stage results in more efficient representatives of the final user, the design construction and commissioning and For one such storage and loading export team, and several independent experts in ultimately a reduction in costs. It was facility currently under construction in safety, process design and operational considered that this HAZOP approach northern Europe, Entec has provided design fields. It was the chairman’s responsibility successfully met these objectives due to the and process safety advice in a range of to ensure that all representatives worked as knowledge and commitment of the team. different areas throughout the detailed a team in an unbiased and objective manner