Sie sind auf Seite 1von 13

Project: Location: Contract: Engineer: Filename: EL

ETAP
7.0.0

Page: Date: SN:

1 06-11-2011 12345678 Base Normal

Study Case: ULF

Revision: Config.:

Electrical Transient Analyzer Program Unbalanced Load Flow Analysis


Loading Category (1): Generation Category (1): Load Diversity Factor: Design Design None

Swing Number of Buses: 1

V-Control 0

Load 1

Total 2

XFMR2 Number of Branches: 0

XFMR3 0

Reactor 0

Line 0

Cable 1

Impedance 0

Tie PD 0

Total 1

Method of Solution: Maximum No. of Iteration: Precision of Solution: System Frequency: Unit System: Project Filename: Output Filename:
60 Hz English EL

Current Injection Method


99 0.000100

C:\EL\Untitled.UL1

Project: Location: Contract: Engineer: Filename: EL

ETAP
7.0.0

Page: Date: SN:

2 06-11-2011 12345678 Base Normal

Study Case: ULF

Revision: Config.:

Adjustments
Apply Tolerance Transformer Impedance: Reactor Impedance: Overload Heater Resistance: Transmission Line Length: Cable Length: Adjustments
Yes Yes No No No

Individual /Global
Individual Individual

Percent

Apply Temperature Correction Transmission Line Resistance: Cable Resistance: Adjustments


Yes Yes

Individual /Global
Individual Individual

Degree C

Project: Location: Contract: Engineer: Filename: EL

ETAP
7.0.0

Page: Date: SN:

3 06-11-2011 12345678 Base Normal

Study Case: ULF

Revision: Config.:

Bus Input Data


Bus
ID Bus1 Conn. 3 phase Swing Type kV 0.415 Sub-sys 1 Ph A B C Bus2 3 phase Load 0.415 1 A B C Total Number of Buses: 2

Initial Voltage
% Mag. 100.0 100.0 100.0 100.0 100.0 100.0 Ang. 0.0 -120.0 120.0 0.0 -120.0 120.0

Generation
MW 0.001 0 0 0 0 0 0.001 Mvar 0 0 0 0 0 0 0.000 MW 0 0 0

Load
Mvar 0 0 0 0 0 0 0.000

Mvar Limits
Max. Min.

0.001 0 0 0.001

Project: Location: Contract: Engineer: Filename: EL

ETAP
7.0.0

Page: Date: SN:

4 06-11-2011 12345678 Base Normal

Study Case: ULF

Revision: Config.:

Cable Input Data


Cable
Length ID Cable1 Conn. 3 phase Library 0.6NCUN3 Size 8 Adj. (ft) 2624.7 % Tol. 0.0 #/Phase 1 T (C) 75 R 0.811000

Ohms/1000 ft per Conductor


X 0.050300 Y

Cable resistances are listed at the specified temperatures.

Project: Location: Contract: Engineer: Filename: EL

ETAP
7.0.0

Page: Date: SN:

5 06-11-2011 12345678 Base Normal

Study Case: ULF

Revision: Config.:

Branch Connections
CKT/Branch
ID Cable1 Conn. 3 phase Cable Type Bus1 From Bus Bus2

Connected Bus ID
To Bus

% Impedance, Pos. Seq., 100 MVAb


R 123594.70 X 7665.61 Z 123832.20 Y

Project: Location: Contract: Engineer: Filename: EL

ETAP
7.0.0

Page: Date: SN:

6 06-11-2011 12345678 Base Normal

Study Case: ULF

Revision: Config.:

UNBALANCED LOAD FLOW REPORT

Bus
ID * Bus1 kV 0.415 Phase A B C Bus2 0.415 A B C

Voltage
% Mag. 100.000 100.000 100.000 93.938 100.645 100.374 Ang. 0.0 -120.0 120.0 -0.3 -120.5 120.5

Generation
MW 0.001 0 0 0 0 0 Mvar 0 0 0 0 0 0

Load
MW 0 0 0 0.001 0 0 Mvar 0 0 0 0 0 0 Bus1 Bus2 ID

Load Flow
Phase A B C A B C MW 0.001 0.000 0.000 -0.001 0.000 0.000 Mvar 0.000 0.000 0.000 0.000 0.000 0.000 Amp 5.7 0.0 0.0 5.7 0.0 0.0 % PF 100.0 0.0 0.0 100.0 0.0 0.0

XFMR
% Tap

* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it) # Indicates a bus with a load mismatch of more than 0.1 MVA

Project: Location: Contract: Engineer: Filename: EL

ETAP
7.0.0

Page: Date: SN:

7 06-11-2011 12345678 Base Normal

Study Case: ULF

Revision: Config.:

LOAD FLOW REPORT Panel / 3-Phase, 1-Phase Systems

Bus/Panel/Phase Adapter
ID kV Phase Type Phase

Voltage
% Mag Ang.

Load*
kW kvar CKT ID

Load Flow
Phase kW kvar Amp %PF

XFMR
% Tap

Panel1

0.240

AN

98.32

-0.3

1.4

0.0

Bus2

AN

-1.4

0.000

6.0

100.0

Type: P=Panel, PA=Phase Adapter * For panel it indicates internal loads and directly connected loads. Connected panel loads are not included. For bus it indicates directly connected loads. Connected panel loads are not included.

Project: Location: Contract: Engineer: Filename: EL

ETAP
7.0.0

Page: Date: SN:

8 06-11-2011 12345678 Base Normal

Study Case: ULF

Revision: Config.:

Bus Loading Summary Report

Bus
ID Bus1 kV 0.415 Rated Amp Phase A B C Bus2 0.415 A B C MW 0.001 0 0 0.001 0 0 Mvar 0 0 0 0 0 0

Bus Load
MVA 0.001 0 0 0.001 0 0 % PF 100.0 0 0 100.0 0 0 Amp 5.7 0 0 5.7 0 0 % Loading

* Indicates operating load of a bus exceeds the bus critical limit ( 100.00 % times the continuous rating).

Project: Location: Contract: Engineer: Filename: EL

ETAP
7.0.0

Page: Date: SN:

9 06-11-2011 12345678 Base Normal

Study Case: ULF

Revision: Config.:

Branch Loading Summary Report


Transformer
Capability (MVA) Loading (input) MVA % Loading (output) MVA %

CKT / Branch
ID Cable1 Conn. 3 phase Type Cable Phase A B C * Indicates a branch with operating load exceeding the branch capability

Cable & Reactor


Ampacity (Amp) Loading Amp 5.69 0.00 0.00 %

Project: Location: Contract: Engineer: Filename: EL

ETAP
7.0.0

Page: Date: SN:

10 06-11-2011 12345678 Base Normal

Study Case: ULF

Revision: Config.:

Branch Losses Summary Report


Vd % Drop in Vmag 6.06 0.64 0.37

CKT / Branch
ID Cable1 Phase A B C

From-To Bus Flow


MW 0.001 0.000 0.000 Mvar 0.000 0.000 0.000

To-From Bus Flow


MW -0.001 0.000 0.000 Mvar 0.000 0.000 0.000 kW

Losses
kvar 0.0 0.0 0.0 0.0

% Bus Voltage
From 100.0 100.0 100.0 To 93.9 100.6 100.4

0.1 0.0 0.0 0.1

Project: Location: Contract: Engineer: Filename: EL

ETAP
7.0.0

Page: Date: SN:

11 06-11-2011 12345678 Base Normal

Study Case: ULF

Revision: Config.:

Alert-Basic Summary Report % Alert Settings Critical Loading


Bus Cable Reactor Line Transformer Panel Protective Device Generator 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0

Bus Voltage
OverVoltage UnderVoltage 105.0 95.0

Generator Excitation
OverExcited (Q Max.) UnderExcited (Q Min.) 100.0 100.0

Alert-Advanced Summary Report % Alert Settings Critical Bus Voltage


Line Voltage Unbalanced Rate (LVUR) Voltage Unbalanced Factor (VUF) Neg. Seq. Voltage Unbalanced Factor (VUF) Zero Seq. 3.0 3.0 3.0

Branch Current
Line Current Unbalanced Rate (LIUR) Current Unbalanced Factor (IUF) Neg. Seq. Current Unbalanced Factor (IUF) Zero Seq. 3.0 3.0 3.0

Project: Location: Contract: Engineer: Filename: EL

ETAP
7.0.0

Page: Date: SN:

12 06-11-2011 12345678 Base Normal

Study Case: ULF

Revision: Config.:

Critical Report
Device ID Bus2 Cable1 Cable1 Cable1 Bus Cable Cable Cable Type Condition Under Voltage LIUR (Pos. Seq.) IUF 2 (Neg. Seq.) IUF 0 (Zero Seq.) Rating/Limit 0.415 1.895 1.895 1.895 Unit kV Amp Amp Amp Operating A 0.225 3.790 1.895 1.895 Operating B 0.241 1.895 1.895 1.895 Operating C 0.240 1.895 1.895 1.895 %Op. A 93.9 200.0 100.0 100.0 %Op. B 100.6 100.0 100.0 100.0 %Op. C 100.4 100.0 100.0 100.0

Project: Location: Contract: Engineer: Filename: EL

ETAP
7.0.0

Page: Date: SN:

13 06-11-2011 12345678 Base Normal

Study Case: ULF

Revision: Config.:

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

Phase Source (Swing Buses): A B C Source (Non-Swing Buses): A B C Total Demand: A B C Apparent Losses: A B C System Mismatch:

MW 0.001 0.000 0.000 0 0 0 0.001 0.000 0.000 0.000 0.000 0.000 0.000

Mvar 0.000 0.000 0.000 0 0 0 0.000 0.000 0.000 0.000 0.000 0.000 0.000

MVA 0.001 0.000 0.000 0 0 0 0.001 0.000 0.000

% PF 100.00 Lagging

Leading

100.00 Lagging

Number of Iterations:

Das könnte Ihnen auch gefallen