AIRPORT :
PROJECT :
REFERENCE Nos:
KIMBALL PROJECT #:
NOTES:
NOTES:
7. Discuss schedule with Client. What are the critical dates for this project?
NOTES:
/var/www/apps/scribd/scribd/tmp/scratch6/9673867.doc
PRELIMINARY DESIGN PHASE: Date Completed Completed By:
1. Establish Project Schedule.
2. Outline (List) Drawing Schedule.
3. Conduct In-house Design Meeting and establish project team.
4. Conduct Pre-Design Meeting.
5. Write and distribute Pre-Design Meeting Minutes.
6A. Submit 7460 Notice of Proposed Construction when Scope is set.
6B. Also submit a Construction Phasing Plan with 7460 as applicable.
7. Any Modifications of Standards Required? If so, submit now.
8. Prepare Preliminary Cost Estimate.
NOTES:
NOTES:
NOTES:
/var/www/apps/scribd/scribd/tmp/scratch6/9673867.doc
PRECONSTRUCTION PHASE: Date Completed Completed By:
1. Verify project award of apparent low bidder with the FAA / State.
2. Issue contract award letter to Low Bidder.
3. Provide Contractor with up to six (6) copies of the project manual for execution.
4. Verify all appropriate bonds and insurance form (ACORD form) are included in the
executed project manuals.
5. Distribute executed project manuals to FAA / State / Owner.
6. Prepare Conformed set of plans and specs. with all Addendum changes.
7. Verify Kimball Inspector (that person should attend the Pre-Con. meeting).
8. Establish Pre-Construction Conference date.
9. Conduct Pre-Construction Meeting.
10. Issue Pre-Construction Minutes.
11. Request Contractor’s Schedule and material submittals / JMF’s for review.
12. Review / comment / approve Contractor submittals.
13. Issue Notice to Proceed Date to Contractor (Copy to FAA / State / Owner)
14. Prepare Construction Notebook.
15. Prepare RFR’s / State Payment Application forms. Complete and submit RFR #1.
NOTES:
NOTES:
/var/www/apps/scribd/scribd/tmp/scratch6/9673867.doc
/var/www/apps/scribd/scribd/tmp/scratch6/9673867.doc