Dr Armand Hermawan CFO, Director of Finance and Risk management, Indonesia Infrastructure Guarantee Fund (IIGF)
November 2011
Outline
1. 2. 3.
Infrastructure investment estimate shows huge needs of contribution from the private sector
Government estimates investment needs for infrastructure within 2010-2014 reach ~ USD 214 billion Funding Gap is about USD 74 billion: expected to come from Private Sector
$ 74
$ 74
Investment Needs
Funding Gap
Private
Source: Bappenas
91 projects
Priority = 27
Planned
10 projects
Jun 2011
Realized
CJPP
Note: - Model Project: Feasibility assessment stage - Potential Project: Preliminary study - Priority Project: Pre-FS stage - Ready to Offer Project: Bidding document completion
Source: Bappenas
Some of Key Challenges to accelerate Indonesias PPP - which are not unique to Indonesia only
Sectors
Transport
Key Challenges
1. Public Sector Capacity & Commitment Comprehension of PPP Execution Project Preparation Transaction 2. Government Support Direct Land Acquisition Investment / Operations Subsidy Contingent 3. Regulatory Framework
Toll Road
Electricity
Water Supply
Waste
Various measures have been taken by GoI, one of which is establishing IIGF
Selected Telco
Irrigation
IIGF Profile
GOI establishes IIGF to provide guarantees to accelerate infrastructure development through PPP
*as has been ammended by Presidential Regulatian No. 13/2010 and No. 56/2011
IIGF serves as Governments Single Window for Appraising, Structuring of Guarantees & Processing Claims
A single window is important for: A consistent policy on appraising guarantees A single process for claims Introducing transparency and consistency to the process
IIGF may provide coverage of various CAs Obligations which have been allocated to CA under PPP/Cooperation Agreement
Pre-construction Construction Operation Transport
Delay or failure in obtaining licenses, permits, and approvals Financial close delay/failure Change in law/regulations Breach of contract Integration with network Competing facility
Toll Roads
Electircity
Water Supply
Risks
Revenue Demand Tariff Expropriation Currency inconvertibility & non-transfer Sub-sovereign Force majeure affecting the CA Interface Selected Telecom Waste Water
Irrigation
10
IIGFs Business Model is designed to make the Government Guarantees provision Consistent, Transparent, and Efficient
Sectors as Regulations Note: Counter Guarantee for MDA Guarantee Facility Ministry of Finance
B
become part
Contracting Agency
3a
MOF
Recourse Agreement
Investor
11
Sector
As per Presidential Regulation No. 67/2005 juncto PR No. 56/2011 and PR No. 13/2010
PPP Contract
Project Viability
Regulations
Feasibility Study
Arbitration Clause
12
13
Ultra super critical coal fired power plant Batang Regency, Central Java Province End of 2016
PPA Tenor
PPP Structure
Developer
6 October 2011
Guarantee Structure
Guarantee Agreement : IPP with IIGF and GOI Coverage: political risk, force majeure affecting PLN and PLN EOD Guarantee Tenor: Equity : 16 years Debt : 21 years
14
Recourse Agreement
Guarantors
PPA
Guarantee Agreement
Project Company
Equity Project-Finance Debt
Sponsors
Sponsor Agreement
Profit Distribution
Loan Agreement
Debt Service
Lenders
EPC Contractor
Fuel Supplier
O&M Contractor
15
No
Item
Position
Guarantee Coverage
Itemized and detailed clauses of PLNs financial obligation in the PPA - Equity : 16 years post COD - Debt : 21 years post COD Applicable to IIGF, and also to Government once the necessary regulation to allow it is in place Co- guarantee structure between IIGF and GOI with Amount Sharing concept. No back- up ; Except when IIGFs insolvency is a result of Government action/inaction. First Loss basis on IIGF Amount One Guarantee Agreement . However, the two guarantees are several, and not joint and several.
Guarantee Tenor
Guarantee Fee
Structure of Guarantee
16
Covered:
1. Obligation to purchase electricity Monthly payment (Capacity and Energy payment)
2. Deemed Dispatch Due to PLN not being able to receive Sellers output Buyout obligation due to PPA Termination triggered by PFM, NFM Obligation to pay due to PLN EOD: Non payment Material Breach Merger, Consolidation GOI EOD under GA
3.
4.
Not covered:
17
Thank You