Item 1 Client KRISI TECHNOLOGY SDN BHD Work Description Extension Covered Loading Bay To PEMSB - Civil and Structure Work Contract Period Oct 1995 - Jan 1996 Contract Value (RM) Lump Sum
Lump Sum
Lump Sum
Lump Sum
June 2000
Lump Sum
Lump Sum
Lump Sum
Civil And Piping Fabrication, Installation and Commissioning of Lawit & Jerneh Line For Mixing Station
Lump Sum
10
Modification For AMIN Flush Drum Deflector, Install New Structure, Foundation and Piping at GPP 5 & 6
May 2000
Lump Sum
11
Civil and Piping Fabrication, Installation and Commissioning of Resak Line For Mixing Station
May 2000
Lump Sum
12
June 2000
Lump Sum
13
Lump Sum
14
SAMSUNG M.O.P
Lump Sum
15
Lump Sum
16
AMIN Flush Drum Pipeline Modification Work with Blinding, Deblinding and Insulation at GPP 5 & 6 ( 2 nos )
Lump Sum
17
Steel / Structure Fabrication and Installation 23m Height Each 17MT With Foundation at GPP 5 & 6 ( 2 nos )
Lump Sum
19
Provision of Manpower, Tools and Consumables for Blinding and Deblinding Works at V6-0202 ( LP Flash Drum ) GPP 6
Lump Sum
20
To Install An Access Walkway and Four Access Platforms at Demin Water Plant in PGB-CUF Gebeng, Kuantan
Lump Sum
21
Supply of Manpower, Equipment and Consumables to Perform and Completed Painting for Demineralised Water Tanks
Lump Sum
22
Supply of Manpower, Equipment and Consumables to Perform and Completed Painting For Fire Water Tank ( Q801 )
Lump Sum
23
Blasting And Painting for Bottom Plate To KR-2 ( T 29209 ) Kerteh, Terengganu
June 2002
Lump Sum
24
Lump Sum
25
Lump Sum
27
Construction of new Bitumen Storage Tank No 12 at Shell Tanjung Gelang, Gebeng, Kuantan, Pahang
Jun-Sept 2003
Lump Sum
28
Lump Sum
29
To Fabricate, Deliver and Install LD-501 Bottom Outlet Collector, DPCU 2 Complex A
Lump Sum
30
To Modify Steam Desuperheater bypass Line and Back Up Instrumentation Air Supply at GPP 2
Lump Sum
31
Sep-03
Lump Sum
32
Provision For The Upgrading and Replacement of P2-201 ABC Discharge Piping & Minimum Flow Spool at GPP 2
Lump Sum
33
Oct 2003
Lump Sum
35
Lump Sum
36
PGB
(PETRONAS GAS BERHAD)
Supply, Install and Comisioning of Air Ventillators c/w accessories at Kuantan Regional Office, Kuantan
Lump Sum
37
To Construct Platform and Step ladder for Aeration Basin and Urea Tank at GPP-B
Lump Sum
38
Lump Sum
39
Mar 2004
Lump Sum
40
Kerja - kerja Perstrukturan Semula Laydown Area di GPP B Paka Dungun Terengganu
Mar-Apr 2004
Lump Sum
41
Installation of Permanent fire Hydrant System at Kerteh Compressor Station Area GPP Complex A
Apr-May 2004
Lump Sum
43
Apr 2004
Lump Sum
44
Tie in work for Modification of LPG Treaters Line at GPP 6 Paka, Dungun, Terengganu (Tie in During Turnaround)
Apr 2004
Lump Sum
45
Removal and Reinstate of Control Valve and Pressure Safety Valve at PDH Plant during Turnaround 2004
Lump Sum
46
To Supply Manpower, Equipment, Tools, Consumables and Transportation for Servicing Multistage Pump P3-664
Apr 2004
Lump Sum
47
Installation New Platform at Ethylene Malaysia Sdn Bhd Kertih, Kemaman, Terengganu
Lump Sum
48
To Supply Manpower, Equipment, Tools, Consumables and Transportation for Servicing Multistage Pump P2-661A
May 2004
Lump Sum
49
D-903 Floating Roof Restoration Work for Petronas Penapisan Terengganu Darul Iman
Lump Sum
51
Installation of Barrier Inside Aerated Lagoon ( Biopond ) at at GPP A Kertih, Kemaman, Terengganu
Lump Sum
52
Service and Repair Steam Turbine PT2-753A&B at GPP A Kertih, Kemaman, Terengganu
May 2004
Lump Sum
53
Lump Sum
54
To Check and Replace Filter at Kerteh Compressor Station GPP A Kerteh Kemaman Terengganu
Lump Sum
55
Jun 2004
Lump Sum
56
Jun 2004
Lump Sum
57
Fabrication of 16" Spool Piece for T2-151 at GPP 2 Kerteh, Kemaman, Terengganu
Jul 2004
Lump Sum
59
Installation of Ultrasonic Flare Flow Meter at Gas Processing Plant (GPP-1) at Complex A, Kerteh. (Hot Tapping Work) Installation Gas Inlet Separator (MD-101B) for DPCU-2 at GPP Complex A, Kerteh, Kemaman, Terengganu.
Lump Sum
60
Lump Sum
61
Installation of Waste Glycol Water Collection System from F201A/B route to M-208.
Lump Sum
62
Lump Sum
63
Mar 2005
Lump Sum
64
The Procurement, Installation And Commissioning Of AGRU Back Flow And Gas Breakthrough From A-201 To A-202At GPP 4 (Installation D/Turnaround) To Perform and Complete Refurbishment of Marley Cooling Tower at GPP 2.
Apr-Sep 2005
Lump Sum
65
Apr-Jun 2005
Lump Sum
67
Procurement, Construction and Commissioning of Ultrasonic Flare Flow Meter at GPP 4. (Hot Tapping Work) To Perform and Complete Refurbishment of Marley Cooling Tower at Export Terminal and GPP 3/4
Jun-Aug 2005
Lump Sum
68
Jul-Dec 2005
Lump Sum
69
Aug 2005
Lump Sum
70
Aug 2005
Lump Sum
71
Procurement, Construction and Commissioning of AGRU Back Flow Protection For GPP 3 (Installation During Turnaround) The Procurement, Installation And Commissioning Of Block Valve For DEHYDRATOR Project at GPP B (Installation During Turnaround) To Install 18" Orifice Flange at AGRU 2 and AGRU 3 (Installation During Turnaround)
Lump Sum
72
Lump Sum
73
Lump Sum
75
May 2006
Lump Sum
76
Lump Sum
77
Installation of Fixed Adjustable Gangway for Safe Ship/Shore Access at Export Terminal PGB Teluk Kalong
Lump Sum
78
Jun 2006
Lump Sum
79
Procurement, Installation and Commissioning For Upgrading and Improvement work on GPTA Flowmeters at GPP 3
Lump Sum
80
Jul 2006
Lump Sum
81
Lump Sum
83
Lump Sum
84
Lump Sum
85
Manpower & Tools Supply for the Replacement of Heat Exchanger at Export Terminal, D/Turnaround.
Feb 2007
Lump Sum
86
Provision to Excavete & Reinstate Underground Fire Water Line & Other Buried Pipeline at P5-0404 at GPP B.
Lump Sum
87
Lump Sum
88
Lump Sum
89
Feb 2007
Lump Sum
91
May 2007
Lump Sum
92
May 2007
Lump Sum
93
Dismantle and reinstatement of Control Valve at PDH and Port Storage Area Gebeng Kuantan