Activity Name

Physical % Start Date Complete 26-Jan-07 26-Jan-07 26-Jan-07 100% 100% 100% 29-Jan-07 0% 12-Mar-07 100% 29-Mar-07 100% 10-Jan-11 90% 12-Mar-07 90% 12-Mar-07 0% 12-Mar-07 95% 12-Mar-07 95% 12-Mar-07 95% 11-Jun-07 0% 0%

Finish Date

A M J J A S O N D J F M 22 011200 122011 20112 301220 112001 23012 201120 012201 1201

1st Ave Amtrak's Project - Valve & Co Compress...


North Ventilation Building
Civil Scope
GC Completes Shafts 3& 4 reconstruction GC completes floor slab level G GC Completes masonry, CMU walls GC installs door & frame - finishing

07-Jan-11 26-Jan-07 09-Mar-07

Shafts 3& 4 reconstruction

GC installs door & frame - finishing 14-Dec-10 28-Feb-11 b St. level to Siamese Connections -Street Level Installs FSP from bench level shafts 3&4 to valve room GC Installs FSP inside valve room GC Installs Mechanical equipment, valve, fan unit, heater unit GC Ties in permanent System GC Installs electrical conduits inside room GC Installs Electrical panels inside room GC Pulls wires and terminate Inspection/Run/ Test FSP system North Building North Building Valve Room Completed

Mechanical Scope
GC Brings 6" FSP Sub St. level to Siamese Conne GC Installs FSP from bench level shafts 3&4 to val GC Installs FSP inside valve room GC Installs Mechanical equipment, valve, fan unit, GC Ties in permanent System

Electrical Scope
GC Installs electrical conduits inside room GC Installs Electrical panels inside room GC Pulls wires and terminate

Punch List & Testing


Inspection/Run/ Test FSP system North Building North Building Valve Room Completed

South Ventilation Building


Civil Scope
GC Brings 6" FSP Sub St. level to Siamese Conne GC Completes Shafts 1&2 Reconstruction GC removes overhead crane GC Form / install rebars / Pour & cure floor slab lev GC Completes masonry, CMU walls GC installs door & fram - finishing 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% National Railroad Corporation (Amtrak) First Avenue Shaft Ventilation Rehabilitation Project North & South Valve Rooms C Brings 6" FSP Sub St. level to Siamese Connections - Street Level C Completes Shafts 1&2 Reconstruction GC removes overhead crane GC Form / install rebars / Pour & cure floor slab level F GC Completes masonry, CMU walls GC installs door & fram - finishing GC Installs FSP shafts 1 & 2 from bench level to valve room GC Installs FSP inside valve room GC Installs Mechanical Equipment, valves, fan unit, heat unit GC Ties-in to permanent System GC Installs electrical Conduits inside valve room GC Installs Electrical Panel Inside valve room Actual Work Remaining Work Critical Remaining Work Page: 1 of 2 Milestone

Mechanical Scope
GC Installs FSP shafts 1 & 2 from bench level to va GC Installs FSP inside valve room GC Installs Mechanical Equipment, valves, fan unit GC Ties-in to permanent System

Electrical Scope
GC Installs electrical Conduits inside valve room GC Installs Electrical Panel Inside valve room Task ID: GC-Valve Rooms Status as of: 08-Mar-11

Activity Name GC Pulls wires & terminate

Physical % Start Date Complete 0% 0% 0%

Finish Date

A M J J A S O N D J F M 22 011200 122011 20112 301220 112001 23012 201120 012201 1201 GC Pulls wires & terminate Inspection / Run / Test FSP System South Vent Building South Building Valve room Completed

Punch List & Testing


Inspection / Run / Test FSP System South Vent Bu South Building Valve room Completed

Turnover
GC Turns over North & South Valve Room to Amtrak 0% 08-Mar-11 100% 08-Mar-11 100% 0% 23-Nov-11 22-Nov-11 DCN # 22 Work Project Substantial Comple Proje GC Turns over North & South Valve Room to Amtrak

Project Completeness
DCN # 22 Work Project Substantial Completion Project's Close out Phase

Task ID: GC-Valve Rooms Status as of: 08-Mar-11 Page: 2 of 2

National Railroad Corporation (Amtrak) First Avenue Shaft Ventilation Rehabilitation Project North & South Valve Rooms

Actual Work Remaining Work Critical Remaining Work

Milestone