Physical % Start Date Complete 26-Jan-07 26-Jan-07 26-Jan-07 100% 100% 100% 29-Jan-07 0% 12-Mar-07 100% 29-Mar-07 100% 10-Jan-11 90% 12-Mar-07 90% 12-Mar-07 0% 12-Mar-07 95% 12-Mar-07 95% 12-Mar-07 95% 11-Jun-07 0% 0%
Finish Date
GC installs door & frame - finishing 14-Dec-10 28-Feb-11 b St. level to Siamese Connections -Street Level Installs FSP from bench level shafts 3&4 to valve room GC Installs FSP inside valve room GC Installs Mechanical equipment, valve, fan unit, heater unit GC Ties in permanent System GC Installs electrical conduits inside room GC Installs Electrical panels inside room GC Pulls wires and terminate Inspection/Run/ Test FSP system North Building North Building Valve Room Completed
Mechanical Scope
GC Brings 6" FSP Sub St. level to Siamese Conne GC Installs FSP from bench level shafts 3&4 to val GC Installs FSP inside valve room GC Installs Mechanical equipment, valve, fan unit, GC Ties in permanent System
Electrical Scope
GC Installs electrical conduits inside room GC Installs Electrical panels inside room GC Pulls wires and terminate
Mechanical Scope
GC Installs FSP shafts 1 & 2 from bench level to va GC Installs FSP inside valve room GC Installs Mechanical Equipment, valves, fan unit GC Ties-in to permanent System
Electrical Scope
GC Installs electrical Conduits inside valve room GC Installs Electrical Panel Inside valve room Task ID: GC-Valve Rooms Status as of: 08-Mar-11
Finish Date
A M J J A S O N D J F M 22 011200 122011 20112 301220 112001 23012 201120 012201 1201 GC Pulls wires & terminate Inspection / Run / Test FSP System South Vent Building South Building Valve room Completed
Turnover
GC Turns over North & South Valve Room to Amtrak 0% 08-Mar-11 100% 08-Mar-11 100% 0% 23-Nov-11 22-Nov-11 DCN # 22 Work Project Substantial Comple Proje GC Turns over North & South Valve Room to Amtrak
Project Completeness
DCN # 22 Work Project Substantial Completion Project's Close out Phase
National Railroad Corporation (Amtrak) First Avenue Shaft Ventilation Rehabilitation Project North & South Valve Rooms
Milestone