OTIA III State Bridge Delivery Program

Oregon Department of Transportation


OTIA III State Bridge Delivery Program
CONTRACTOR'S CONSTRUCTION WASTE REUSE AND RECYCLING PLAN Contract Number: Bundle Number: Contractor's Name: Street Address: City: Phone: ( ) E-Mail Address: Prepared By: (Print Name) Date Submitted: Project Duration:

State: Fax: ( )

Zip:

From:
Type of Activity

To:

Describe the types of reuse or recycling processes or disposal activities that will be used for material generated in the project. Reused - Reuse of materials or salvage items on site (i.e., crushed base) and Reuse of material on another project (e.g., metal and wood signs, forms) Recycled - Recycling materials at an off-site recycling (e.g., steel, source-separated or mixed debris) Disposed - Disposal at a landfill or transfer station

SECTION I - RE-USED/RECYCLED/DISPOSED MATERIALS


Provide estimates in "Tons" for all materials by activity. Indicate the type of activity, types of materials, and estimated quantities that will be reused, recycled or disposed in the sections below:

A Material Type Type of Activity Reused Asphalt Recycled Disposed Total Diversion Reused Concrete Recycled

B Final Destination of Materials

C Comments/notes

D Estimated Amount (TONS)

Disposed Total Diversion

March 1, 2008

OTIA III State Bridge Delivery Program

SECTION I - RE-USED/RECYCLED/DISPOSED MATERIALS (continued) A B C Material Type Type of Activity Final Destination of Materials Comments/notes

D Estimated Amount (TONS)

Concrete Reused with leadRecycled based paint Disposed Total Diversion Reused WoodTreated Recycled

Disposed Total Diversion Reused WoodUntreated Recycled Disposed Total Diversion Reused Metals Recycled

Disposed Total Diversion Reused Green waste Recycled

Disposed Total Diversion Reused Clean fill Recycled Disposed Total Diversion Reused Other Recycled

Disposed Total Diversion

March 1, 2008

OTIA III State Bridge Delivery Program

SECTION II - CONVERSION RATES Use of these conversion factors and/or weight receipts from previous projects could help estimate the potential tons of recyclable materials and waste from your project. 4,000 1,400 4,050 2,000 1,012 37.5 Metal (Steel) 13,365 495 Green Waste Clean Fill 1,600 0.8 tons/CY pounds/CY To convert pounds to tons, divide the number of pounds by 2,000 pounds (2,000 pounds = 1 ton) 1.3 500 pounds/bank cubic yard (BCY) pounds/cubic yard (CY) pounds/BCY pounds/CY pounds/CY pounds/cubic foot (CF) pounds/CY pounds/CF pounds/CY 2 0.5 2 1 0.5 0.02 6.7 0.25 0.25 tons/BCY tons/CY tons/BCY tons/CY tons/CY tons/CF tons/CY tons/CF tons/CY 0.5 2.0 0.5 1.0 2.0 53.3 0.1 4.0 4.0 cubic yards per ton cubic yards per ton cubic yards per ton cubic yards per ton cubic yards per ton cubic foot per ton cubic yards per ton cubic foot per ton cubic foot per ton cubic yards per ton

Asphalt

Concrete

Wood

Suggested Conversion Factors: From Cubic Yards to Tons (Use when scales are not available) Asphalt 1,000 CY = 2,000 tons or Applies to broken chunks of asphalt Concrete 1,000 CY = 2,000 tons or Applies to broken chunks of concrete Metals 1,000 CY = 6,700 tons or

March 1, 2008