Sie sind auf Seite 1von 10

a.

Watchman & Curing


b. Site Cleaning
c. Fencing
d. Fixing of Light Weight Scaffolding
Excavation
a. Soft Soil (Hand Tools)
b. Hard Soil (Hand Tools)
c. Soft Soil
d. Hard Soil
e. Soft Soil
f. Hard Soil
Backfilling
a. Filling in foundation, pinth
b. Level, Compaction
c. Spreading 200mm layer (Subkha, Road Base)
d. Compaction 200mm layer (Subkha, Road Base)
Interlock Paving
a. Compaction / Levelling
b. Spreading Sand and Brushing
c. Laying Tiles
d. Filling, Compaction
Precast Kerb Stone
a. Excavation & Blinding for Curbstone
b. Laying Kerbs
c. Karb stone on curved lines
d. Hunching
Shuttering (with supports)
a. Shutt. of Blinding
b. Shutt. of Footing (Plywood)
c. Shutt. of Footing (Plates)
d. Shutt. of Slub Column
e. Shutt. of Strap / Tie Beam (Plywood)
f. Shutt. of Strap / Tie Beam (Plates)
g. Shutt. of Wall
h. Shutt. of Column 20x20
i. Shutt. of Column 20x40
j. Shutt. of Beam with support
k. Shutt. of Roof Slab
l. Shutt. of Lintel
m. Shutt. of Copying Beam 20x20cm
n. Shutt. of Parapet
o. Shutt. of Arch Lintel
p. Expansion Joints / Ground Slab
s. Shutt. of Beam & Column for 8m to 12m high
PAVING &
SURFACING
CONCRETE
FORMWORK
01 GENERAL REQUIREMENT
PRODUCTIVITY RATES
SITE
FACILITIES
02 SITE WORK
EARTHWORK
03 CONCRETE
u. Shutt. of Staircase
t. De-shuttering Works
Reinforcement (Lightening for Cut
& Bend Steel)
a. Reinf. of Footing
b. Reinf. of Slub Column
c. Reinf. of Strap Beam
d. Reinf. of Tie Beam
e. Reinf. of Wall
f. Reinf. of Column
g. Reinf. of Beam
h. Reinf. of Solid Slab
i. Reinf. of Lintel
j. Reinf. Copying Beam 20x20cm
k. Reinf. of Parapet
l. Reinf. of Arch Lintel
l. Reinf. of Staircase
Mesh Reinforcement
a. Mesh Reinforcement
Casting Concreting (Readymix)
a. Cast. Blinding 5cm
b. Cast. Blinding 10cm
c. Cast. Blinding 5cm, 10cm
d. Cast. of Footing
e. Cast. of Footing (Pump)
f. Cast. of Strap / Tie Beam
g. Cast. of Tie Beam (Pump)
h. Cast. of Ground Floor Slab 10cm
i. Cast. of Ground Floor Slab 15cm
j. Cast. of Ground Floor Slab 20cm
k. Cast. of Wall
l. Cast. of Column
m. Cast. of Beam of Slab
n. Cast. of Roof Slab
o. Cast. of Lintel
p. Cast. of Copying Beam 20x20cm (up to2.5m)
q. Cast. of Copying Beam 20x20cm (above 2.5m)
r. Cast. of Parapet
s. Cast. of Arch Lintel
u. Casting of Neck Column
v. Casting of Staircase
Solid Block
a. 200mm Solid Block up to 2.5m Height
Hollow Block
a. 100mm Hollow Block up to 2.5m Height
b. 100mm Hollow Block - 2.5m to 6m Height
c. 150mm Hollow Block up to 2.5m Height
d. 200mm Hollow Block up to 2.5m Height
e. 200mm Hollow Block - 2.5m to 6m Height
f. 200mm Block Work above 6m Height

REINFORCEMENT
PLACE
CONCRETE
04 MASONRY
g. 200mm Block Work including pointing
Claustra Block
a. Claustra Block 200x200
b. Claustra Block 150x150
Steel Structure
a. Painting for steel structure columns
b. Painting for steel structure rafters
c. Erection of steel structure main frame ( Eave Height up
to 6m span up to 25m)
d. Erection of steel structure main frame ( Eave Height up
to 6m span up to 36m)
e. Fixing of Single Skin Sheet (Roof)
f. Fixing of Single Skin Sheet (Walls)
g. Single skin with Fibre Glass Insulation (Roof)
h. Single skin with Fibre Glass Insulation (Wall)
i. Sandwich Panels (Roof)
j. Sandwich Panels (Wall)
k. Corner Fisshing & Trims, etc
l. 4m x 4m Double Sliding Door
m. Wall or Roof opening + Frames (1.0mx1.0m)
n. Ridge Ventilator
o. Gutter / Down Spout
Polythene Sheets
a. Polythene under footings
b. Polythene under slab
c. Polythene under tie beam
Bitumin Paint
a. Cold Bituminous Painting
b. Hot Bituminous Painting
Bituminous Membranes
a. Bituminous Membrane + Protection Board
Construction Joints
a. Flexel Board
b. Sealant
Internal Plaster
a. Ceiling Plaster
b. Wall Plaster up to 3m Height
c. Wall Plaster 3m to 6m Height
d. Wall Plaster above 6m Height
e. Fixing of Plaster Mesh
f. Fixing of Corner Beed
External Plaster
a. Wall Plaster up to 3m Height
b. Wall Plaster 3m to 6m Height
c. Wall Plaster above 6m Height
Mosaic
a. Floor Mosaic Tiles
b. Mosaic Skirting
c. Mosaic Steps (Riser & Tread)
d. Mosaic Polishing
Ceramic
STRUCTURAL
STEEL
PLASTER
05 METALS
07 MOISTURE THERMAL CONTROL
09 FINISHES
a. Fixing of Ceramic Wall Tiles (Glur Type)
b. Grouting of Ceramic Wall Tiles
c. Fixing of Ceramic Wall Tiles (Cement Monar Type)
d. Fixing of Ceramic Floor Tiles 20x20cm
e. Fixing of Ceramic Floor Tiles 30x30cm
f. Fixing of Ceramic Floor Tiles 50x50cm
g. Grouting of Ceramic Floor Tiles
h. Ceramic Skirting
PVC Tiles
a. PVC Tiles
b. PVC Skirting
Marble
a. Marble Wall
b. Marble Floor
c. Marble Skirting
d. Marble Steps (Riser & Treads)
Floor Screed (50mm)
a. Floor Screed (50mm)
b. Cement Skirting
Wooden Skirting
a. Timber
Threshold
a. Threshold
False Ceiling
a. False Ceiling - Suspended Type
Dry Wall Partition
a. Dry Wall Partition
Tyrolene (Cullamix)
a. Tyrolene over plastered surface
b. Tyrolene over block wall
Normal Paint (Emulsion Oil)
a. Primer
c. Stucco (Putty)
d. Emulsion Paint
e. Oil Paint
Epoxy Painting
a. Epoxy Painting
Copper & PVC Pipes
a. 1/2" to 1" Copper Pipe (Hot water)
b. 1/2" to 1 1/2" PVC Pipe
c. 2" to 3" PVC Pipe
d. 4" to 6" PVC Pipe
Plumbing Fixtures
a. Shower Tray
b. Kitchen Sink
c. Urinals + Partition
d. Wash Basin
e. W/C Asian
f. W/C Western
WALL
COVERINGS
PLUMBING
INSTALLATIONS
PLUMBING
FIXTURES
15 MECHANICAL
TILING
SCREED
g. Bidet
h. Booster Pump
i. Manhole 60cm to 90cm
Plumbing Appliances
a. Water Heater
Race Ways
a. Conduits
b. Trunking
Conductors & Grounding
a. Laying Cables
Wiring
a. Wiring
Boards
a. D.B's
b. M.D.B's
C=Carpenter, M=Mason, P=Painter, SF=Steel
Fitter, E=Erector, H=Helper, Po=Polisher,
Elec=El, Pl=Plumber
One Day is considered as 8 working hours.
16 ELECTRICAL
BOARDS
PLUMBING
APPLIANCES
RACE WAYS
CONDUCTORS
& GROUNDING
WIRING
Rev. 01 02/11/05
(Duration x 2H) Day
-
(Dhs. Contract value/ 50,000)
Helper-Day
Day
1
1C + 2H + 1P Rm/Day
50
1C + 1H M2/Day
70
1 H Hand Tools M3/Day
3
1 H Hand Tools M3/Day
1
- Shovel M3/Hr
40
- Shovel M3/Hr
25
- JCB M3/Hr
20
- J.C.B. M3/Hr
10
- Shovel M3/Hr
30
1 H Roller Compr. M2/Day
100
- Shovel M2/Hr
100
1 H Roller Compr. M2/Day
200
2 H Roller Compr. M2/Day
200
2 H M2/Day
200
1 M + 2 H M2/Day
60
1 H Plate Compr. M2/Day
150
1 H R.M/Day
10
1 M + 2 H R.M/Day
35
1 M + 1 H R.M/Day
15
1 M + 1 H R.M/Hr
20
1 C + 1 H M2/Day
35
1 C + 1 H M2/Day
15
1 C + 1 H M2/Day
20
1 C + 1 H M2/Day
5
1 C + 1 H M2/Day
12
1 C + 1 H M2/Day
20
1 C + 1 H M2/Day
14
1 C + 1 H M2/Day
10
1 C + 1 H M2/Day
10
1 C + 1 H M2/Day
12
1 C + 2 H M2/Day
10
1 C + 1 H M2/Day
6
1 C + 1 H M2/Day
6
1 C + 1 H M2/Day
12
1 C + 1 H M2/Day
6
1 C + 1 H L.M/Day
70
1 C + 1 H M2/Day
8
1 C + 1 H M2/Day
12
20% of Shuttering Works
1 SF + 1 H KG/Day
400
1 SF + 1 H KG/Day
250
1 SF + 1 H KG/Day
300
1 SF + 1 H KG/Day
350
1 SF + 1 H KG/Day
400
1 SF + 1 H KG/Day
300
1 SF + 1 H KG/Day
300
1 SF + 1 H KG/Day
300
1 SF + 1 H KG/Day
150
1 SF + 1 H KG/Day
200
1 SF + 1 H KG/Day
300
1 SF + 1 H KG/Day
150
1 SF + 1 H KG/Day
250
1 SF + 2 H M2/Day
300
1 M + 2 H M2/Day
30
1 M + 2 H M2/Day
40
2 M + 4 H Pump M2/Day
250
2 M + 4 H M3/Day
40
3 M + 8 H Pump M3/Day
120
1 M + 6 H M3/Day
20
2 M + 6 H Pump M3/Day
50
3 M + 5 H M3/Day
30
3 M + 5 H M3/Day
45
3 M + 5 H M3/Day
50
1 M + 1 C + 3 H Pump M3/Day
40
1 M + 4 H M3/Day
4
1 M + 4 H M3/Day
12
2 M + 2 C + 5 H Pump M3/Day
50
1 M + 2 H Nos./Hr
4
1 C + 5 H RM/Day
150
1 C + 5 H RM/Day
60
1 M + 1 C + 4 H Pump M3/Day
10
1 M + 3 H M3/Day
5
1 M + 3 H M3/Day
4
1 C + 1 H M3/Day
12
1 M + 2 H Nos./Day
140
1 M + 1 H Nos./Day
150
1 M + 2 H Nos./Day
140
1 M + 1 H Nos./Day
150
1 M + 1 H Nos./Day
180
1 M + 2 H Nos./Day
140
1 M + 2 H Nos./Day
100
1 M + 1 H Nos./Day
120
1 M + 1 H M2/Day
10
1 M + 1 H M2/Day
8
1 P + 1 H M2/Day/
Coat
50
1 P + 1 H M2/Day/
Coat
40
3 E + 3 H M2/Day
250
3 E + 3 H M2/Day
175
3 E + 3 H M2/Day
350
3 E + 3 H M2/Day
150
3 E + 3 H M2/Day
250
3 E + 3 H M2/Day
100
3 E + 3 H M2/Day
250
3 E + 3 H M2/Day
150
1 E + 3 H Rm/Day
80
1 E + 3 H No.
1
1 E + 3 H No.
8
1 E + 3 H No./Day
6
1 E + 3 H Rm/Day
70
1 C + 1 H M2/Day
200
1 C + 1 H M2/Day
1000
1 H Rm/Day
200
1 H M2/Day/
Coat
100
2 H M2/Day/
Coat
60
1 C + 1 H M2/Day
30
1 C + 1 H RM/Hr
18
1 H RM/Hr
7
1 M + 1 H M2/Day
10
1 M + 1 H M2/Day
20
1 M + 2 H M2/Day
17
1 M + 2 H M2/Day
15
1 C + 1 H Rm/Day
90
1 M + 1 H Rm
30
1 M + 1 H M2/Day
20
1 M + 2 H M2/Day
18
1 M + 2 H M2/Day
15
1 M + 1 H M2/Day
15
1 M + 1 H Rm/Day
40
1 M + 1 H Rm/Day
14
1 Po + 1 H M2/Day
100
1 M + 1 H M2/Day
10
1 M + 1 H M2/Day
30
1 M + 1 H M2/Day
8
1 M + 1 H M2/Day
12
1 M + 1 H M2/Day
15
1 M + 1 H M2/Day
20
1 M + 1 H M2/Day
40
1 M + 1 H Rm/Day
30
1 M + 1 H M2/Day
35
1 M + 1 H Lm/Day
40
1 M + 1 H M2/Day
6
1 M + 1 H M2/Day
15
1 M + 1 H Rm/Day
30
1 M + 1 H Rm/Day
10
1 M + 1 H M2/Day
50
1 M + 1 H Rm/Day
25
1 C + 1 H Rm/Day
100
1 M Rm/Day
10
1 C + 1 H M2/Day
30
1 C + 1 H M2/Day
20
1 M + 1 H M2/Day/
Coat
100
1 M + 1 H M2/Day/
Coat
100
1 P M2/Day/
Coat
200
1 P M2/Day/
Coat
80
1 P M2/Day/
Coat
100
1 P M2/Day/
Coat
60
1 P + 1 H M2/Day/
Coat
50
1 Pl + 1 H R.M/Day
12
1 Pl + 1 H R.M/Day
20
1 Pl + 1 H R.M/Day
75
1 Pl + 1 H R.M/Day
60
1 Pl + 1 H Nos./Day
2
1 Pl + 1 H Nos./Day
2
1 Pl + 1 H Nos./Day
3
1 Pl + 1 H Nos./Day
2
1 Pl + 1 H Nos./Day
2
1 Pl + 1 H Nos./Day
2
1 Pl + 1 H Nos./Day
2
1 Pl Nos./Day
1
1 M + 1 H Nos./Day
2
1 Pl + 1 H Nos./Day
2
1 El + 1 H R.M/Day
50
1 El + 1 H R.M/Day
50
1 El + 2 H R.M/Day
150
1 El + 1 H R.M/Day
300
1 El + 1 H Nos./Day
2
1 El + 1 H Nos./Day
1