Sie sind auf Seite 1von 3

INTERNATIONAL BUILDING SYSTEM FACTORY CO. LTD.

IBSF-HSE-RA-05
Rev: 01. 13/11/2010

RISK ANALYSIS
9

Page 1/1

Phases of works and risk analysis **


ACTIVITY HAZARDS *Slip, Trip, Fall and crushing. *Accident due to equipment. *Personal Injury. *Accident due to un-skill operator, rigger And working crew. *Collapse of equipment. *Lack of communication and improper signal lead to falling of steel members leading to personal injury. *Failure to lifting tools Crane & lifting gears. *Struck by equipment. *Crushing. *Falling objects during lifting Cause personal injury. *Personal injury due to slipping of hand tools. *Failure of wire rope. MEASURES AND MEANS OF PREVENTION *Working area should be clear from any abs truckle. *Equipment should be check before each use. *Use Proper PPE. *Working area should be barricaded. *Only one rigger gives signal. *Material should be secure. *Proper sling should be used and secure the material. Lifting gear and check for safe working load. *Use proper lifting tools and tackle with color code. *Skill crew perform job. *Two tagline should be use. *Flagman must be present all time with equipment. *Only authorize rigger give signal.

*Steel erection work by Crane.

*Lifting work by Crane.

INTERNATIONAL BUILDING SYSTEM FACTORY CO. LTD.

IBSF-HSE-RA-05
Rev: 01. 13/11/2010

RISK ANALYSIS
*Falling person from heights. *Slipping of hand Tools.

Page 2/1

*Do not stand and walk under suspended load and boom. *Competent person should be present all time. *Only qualified person operate equipment. *Provide signage. *Fallow safety rule and regulation.

Additional Information about single top.

*Lack of communication and improper signal lead to falling of steel members leading to personal injury. *Crushing/Overload *Slip, Trip, Fall and crushing. *Failure of wire rope. *Failure to lifting tools Crane & lifting gears. *Rotates material in air.

***The lifting capacity for single top is same as that of 8.5M jip (0* Offset). *The total rated lifting capacity includes the wet of hook block And slings, unit: t. *The working radius in the table is the actual value including boom deflection under load. *Before lifting operation, set up all the outriggers, including the 5th outrigger, if necessary. *Single line pull should not exceed Total rated lifting load of single Top. * Follow Crane manufacture load Chart. *Only one rigger gives signal. *Material should be secure. *Two tag line should be use. *Skill crew perform job. *Proper sling should be used and secure the material. **Do not stack any material near excavation ** Do not park any equipment near excavation.

Additional Excavation Awareness **Personal Injury **Falling of person and equipment into the excavation.

INTERNATIONAL BUILDING SYSTEM FACTORY CO. LTD.

IBSF-HSE-RA-05
Rev: 01. 13/11/2010

RISK ANALYSIS
**Collapse of excavation edge.

Page 3/1

*Proper supervision should be done. *Trained signalman should be assigned. * The areas must be barricaded with signage to prevent unauthorized entry and traffic/worker movements. **Observe work area hazard and take precaution with proper Supervision/monitor. **operator operates the equipment in a safe manner that will not endanger any person involved in the excavation work.

** In case that a work phase, a mean or a hazard does not appear in this document, an attachment will be supplied before the beginning of the works for preliminary validation by the Safety Department AMTPJ