PRESENTATION

ON

Shop-Floor Control
Resource Sales and operations Demand
Planning planning management

oucPlag()Sym
EnterpisR
Master production
scheduling Front End

Detailedcapacity Detailedmaterial
planning planning
Engine
Material and
capacityplans

Shop-floor Supplier Back end


systems systems

ManufacturingPlanningandControl System
Example product structure
diagram

End itemA
(Lead time =1)

Part B Part C
(Lead time =3) (Lead time =2)

Part D Part E
(Lead time =2) (Lead time =1)
Routing data
Part D routing

Queue
Operation Work center Run time Setup time Move time Total time Rounded time
time

1 101 1.4 0.4 0.3 2.0 4.1 4.0

2 109 1.5 0.5 0.3 2.5 4.8 5.0

3 103 0.1 0.1 0.2 0.5 0.9 1.0

Part E routing

Queue Total Rounded


Operation Work center Run time Setup time Move time
time time time

1 101 0.3 0.1 0.2 0.5 1.1 1.0

2 107 0.2 0.1 0.3 0.5 1.1 1.0

3 103 0.3 0.2 0.1 1.5 2.1 2.0

4 109 0.1 0.1 0.1 0.5 0.9 1.0


Shop-floor control Techniques
This section includes :

Elements of Lead Time


Data Input
Loading of a particular job onto a
machine center
Priorities
Elements of Lead Time

LEAD
T IM E

O P E R A T IO N T IM E IN T E R -O P E R A T IO N
T IM E

S E T -U P R U N T IM E MOVE QUEUE
T IM E p e r p ie c e T IM E T IM E
p e r o p e r a t io n p e r o p e r a t io n p e r o p e r a t io n
or per W C or per W C