Project Owner Main Contractor Contractor's Consultant grid Document Title

BAYAN LEPAS SPLLITING BUS BAR 132/275Kv Substation Tenaga Nasional Berhad System Protection Sdn.Bhd and Transgrid Ventures Sdn Bhd-JV. System Protection Sdn.Bhd and Transgrid Ventures Sdn Bhd-JV Works Method Statement Doc . No BPLS-E-WMS-02 REV-00

Tran s

PMU BAYAN LEPAS SPLLITING BUS BAR 275/132kV TNBT 867/2006

Project Owner Main Contractor Contractor's Consultant grid Document Title

BAYAN LEPAS SPLLITING BUS BAR 132/275Kv Substation Tenaga Nasional Berhad System Protection Sdn.Bhd and Transgrid Ventures Sdn Bhd-JV. System Protection Sdn.Bhd and Transgrid Ventures Sdn Bhd-JV Works Method Statement Doc . No BPLS-E-WMS-02 REV-00

Tran s

METHOD OF STATEMENT FOR 132kV Interconnector Sealing End (Bay E01) at Hyundai GIS work PMU Bayan Lepas

1) Work SCOPE 1. Degassing work for E01 Power Cable Compartment 2. To removed the E01 132kV(cable box) GIS compartment(132kV Interconnector Bay) 3. To adjust the RYB phase of sealing end into correct position. 4. Placed the GIS compartment (cable box) and begin with docking process. 5. Re route the 120 Sqmm power cable for suitable bending radius before docking works. 6. Vacuuming works after completion of sealing end installation. 7. Fill up the SF6 gas for Bay E01 cable box compartment. 8. Cable testing including Insulation, shield and phasing testing.

Project Owner Main Contractor Contractor's Consultant grid Document Title

BAYAN LEPAS SPLLITING BUS BAR 132/275Kv Substation Tenaga Nasional Berhad System Protection Sdn.Bhd and Transgrid Ventures Sdn Bhd-JV. System Protection Sdn.Bhd and Transgrid Ventures Sdn Bhd-JV Works Method Statement Doc . No BPLS-E-WMS-02 REV-00

Tran s

2) Switches Isolation 1. E01 LCP Supervisory panel need to change into LOCAL mode and Panel to be lock 2. 801A Earth Switch needs to put on Close position and switches to be lock 3. Q8 must be close position and lock

3.Testing

1.Terminate both end cable, in order to terminate the supply cable the insulation test need to be carried out to ensure each phase of cable are in good condition(in order to void phase shorting, leakage)

Project Owner Main Contractor Contractor's Consultant grid Document Title

BAYAN LEPAS SPLLITING BUS BAR 132/275Kv Substation Tenaga Nasional Berhad System Protection Sdn.Bhd and Transgrid Ventures Sdn Bhd-JV. System Protection Sdn.Bhd and Transgrid Ventures Sdn Bhd-JV Works Method Statement Doc . No BPLS-E-WMS-02 REV-00

Tran s

2. For earthing continuity, since the new building is new the complete earthing system has been install and tested no testing require, we need to ensure all the connection is secure with tester test result in hand. 3.The IR Test -The majority of utilities, including competent engineer, hire consultants to conduct such tests because interpretation of results requires both advanced training and skills generally not available in-house. The necessary equipment for XLPE testing is also generally not available in-house. But now by using the Insulation Tester Unit select Voltage into 1kV for the mean time place the prop ground and other prop to Power Cable amour sheath. Competent Chargeman shall maintain testing by injecting the 1kV Voltage within 1 minute time durations.

4) Personals involve 1. Site Supervisor. 2. Electrician/General workers. 3. Electrical Chargeman /HT 4. Jointer

Project Owner Main Contractor Contractor's Consultant grid Document Title

BAYAN LEPAS SPLLITING BUS BAR 132/275Kv Substation Tenaga Nasional Berhad System Protection Sdn.Bhd and Transgrid Ventures Sdn Bhd-JV. System Protection Sdn.Bhd and Transgrid Ventures Sdn Bhd-JV Works Method Statement Doc . No BPLS-E-WMS-02 REV-00

Tran s

5) Machinery/Equipment/Material 1. Chain block and Cable Jack 2. Insulation and Resistance Test Meter. 3. Phase rotation test meter.

Project Owner Main Contractor Contractor's Consultant grid Document Title

BAYAN LEPAS SPLLITING BUS BAR 132/275Kv Substation Tenaga Nasional Berhad System Protection Sdn.Bhd and Transgrid Ventures Sdn Bhd-JV. System Protection Sdn.Bhd and Transgrid Ventures Sdn Bhd-JV Works Method Statement Doc . No BPLS-E-WMS-02 REV-00

Tran s