Sie sind auf Seite 1von 2

Sub:Investments in Energy with a guaranteed return of 100% after 7 years + Attention: Chief Manager Bank.

Dear Sir, Good Morning! This is in continuation of our discussions in the afore-said domain.I give below a small ---EXECUTIVE SUMMARY A) Preamble : The technology has been patented by us under SWISS PATENTS for the same under various stages of Patenting. Sir/ Mam you may be aware that there is a shortage of 90,000MW + 20% per annumincrease in the near future as outlined by the Planning Commission and Central Electricity Authority and the 11th Annual Budget, the same would again be reflected by the coming 12th Annual Budget also. The current PAN INDIA shortage of POWER edifies the same and one must have felt the pinch of the same sometime in the country, which adequately explains the same. Added to it is the invisible increase of the fossil fuel prices and more in the offing as is evident from the WEST ASIAN WAR crisis, an one can view in the near future an upswing in the base prices of FOSSIL FUELS and GAS where the Dubai/Brent may touch US$100 per barrel. Thus this PANACEA/SOLUTION for the ills of the Industry and thereby save the stakeholders, you, the society, Industry, Nation from being exploited by the POWER BROKERS of this PLANET. B) Investors Role : The investor provides ONLY FUNDS to the tune of Rs 2750Crores +/- 5% (Depending on Exchange fluctuations)against the same we provide BLOCKED FUNDS ( As MT 799 etc) from a PRIME EUROPEAN BANK for the equivalent value as Euro's 400million.Since this a BANK to BANK transactions no Companies or individuals are involved. Assured returns: The Investors gets an assured return from the Bank a 100%+/- after SEVEN years+ C) Project : The Project encompasses the State Of Art Technology Global Patented products, following-a) Energy Savers---For saving Energy. b) Energy Generator----For Generating clean Energy. The project would be initiated, installed, operated by the Inventor as PATENTED. Energy.

D) Commercial Terms: The same is under the following terms which are NON NEGOTIABLE and the same is as 1) Locking Fees : NON REFUNDABLE 0.25% of the Project Cost ie is on current Exchange Rate Euro's 1million.Payable on acceptance of the PROJECT, be provided for coordinates would be provided for e-transfer. 2) Consultancy Fees : NON REFUNDABLE 0.25% of the Project Cost wherein all CONFIDENTIAL REPORTS would be provided, after point (1 ) is executed the Principals would be introduced from Overseas in person(if needed). 3) Finders Fees : NON REFUNDABLE payable UPFRONT ONLY Rs 1 Cr -50% in CASH and 50% by Bank Draft ONLY -NON NEGOTIABLE C) Validity: This offer is valid for TWO BANKING days for the investor if SERIOUS and the same has to be CONFIRMED by the INVESTOR and his BANKER in WRITING on there letter head ONLY. Wishing you the best and WELCOME to FUTURISTIC GROUP who converts DREAMS into REALITY and usher in GROWTH for all in the Planet. THE END

Das könnte Ihnen auch gefallen