TRAFFIC IMPACT

ASSESSMENT
for Permohonan Pelan Kebenaran Merancang
bagi Pindaan Pelan Lulus Pembangunan
Perumahan (Kondominium) kepada Perumahan
Bercampur di atas Lot 16833 (PT 4609), 16834
(PT 4610), 16835 (PT 4611), 16836 dan 16837,
Taman Melawati, Mukim Setapak, Daerah
Gombak, Selangor Darul Ehsan

NOVEMBER 2011

KI Integrated
Consultants Sdn Bhd
BLOCK 8, TAMAN UNIPARK SURIA
JALAN IKRAM - UNITEN
43000 KAJANG
SELANGOR DARUL EHSAN
MALAYSIA
TEL: (603) 8738 3371
FAX: (603) 8926 6282

TRAFFIC IMPACT ASSESSMENT for Permohonan Pelan Kebenaran Merancang bagi Pindaan Pelan Lulus
Pembangunan Perumahan (Kondominium) kepada Perumahan Bercampur di atas Lot 16833 (PT 4609), 16834 (PT
4610), 16835 (PT 4611), 16836 dan 16837, Taman Melawati, Mukim Setapak, Daerah Gombak, Selangor Darul Ehsan.

TABLEOFCONTENTS
Section

PageNo

1.0

INTRODUCTION

2.0

STUDYOBJECTIVE

3.0

THESTUDYAREA

4.0

EXISTINGTRAFFICCONDITIONS

4.1

RoadandJunctionInventory

4.2

ExistingTrafficVolume

4.3

AnalysisofSurveyData

4.4

PerformanceofExistingRoad

ASSESSMENTOFFUTURETRAFFICSCENARIO

22

5.1

NonSite(Base)Traffic

22

5.2

DevelopmentTrafficForecast

25

5.3

TripsDistributionandAssignmentModel

25

5.4

TrafficPerformanceAssessment

28

5.5

10YearTrafficForecast(2026)

5.0

6.0

35

THEPROPOSEDDEVELOPMENT

17

5.1

SiteLocation

17

5.2

ProposedAccess

17

5.3

DevelopmentComponent

19

5.4

ProjectedTrafficGenerationPatterns

19

RECOMMENDATIONS

43

7.1

43

46

7.0

8.0

Title

UponCompletion(Year2016)

CONCLUSION

TRAFFIC IMPACT ASSESSMENT for Permohonan Pelan Kebenaran Merancang bagi Pindaan Pelan Lulus
Pembangunan Perumahan (Kondominium) kepada Perumahan Bercampur di atas Lot 16833 (PT 4609), 16834 (PT
4610), 16835 (PT 4611), 16836 dan 16837, Taman Melawati, Mukim Setapak, Daerah Gombak, Selangor Darul Ehsan.

LISTOFFIGURES

Figure3.1:

LocationPlan

Figure4.1:

StationSurveys

Figure4.2:

ExistingTrafficVolumeforAM&PMPeakinYear2011

Figure4.3:

OverallJunctionPerformanceinYear2011

Figure5.1:

AccessPoints

Figure5.2:

TripGeneration

Figure6.1:

FutureTrafficVolumeofStudyArea&AdjacentDevelopmentforAM&PM
PeakYear2016

Figure6.2:

TrafficDistributionincludingtheProposedDevelopment&Adjacent
DevelopmentYear2016

Figure6.3:

OverallJunctionPerformanceinYear2016

Figure6.4:

OverallJunctionPerformanceinYear2026

TRAFFIC IMPACT ASSESSMENT for Permohonan Pelan Kebenaran Merancang bagi Pindaan Pelan Lulus
Pembangunan Perumahan (Kondominium) kepada Perumahan Bercampur di atas Lot 16833 (PT 4609), 16834 (PT
4610), 16835 (PT 4611), 16836 dan 16837, Taman Melawati, Mukim Setapak, Daerah Gombak, Selangor Darul Ehsan.

LISTOFTABLES

Table4.1:

ConversionFactorstoPCU

Table4.2:

LevelofServiceandVolume/CapacityRatioCorrelation

Table4.3:

J1AnalysisAM&PMPeakcurrentyear2011

Table4.4:

J2AnalysisAM&PMPeakcurrentyear2011

Table4.5:

J3AnalysisAM&PMPeakcurrentyear2011

Table4.6:

J4AnalysisAM&PMPeakcurrentyear2011

Table4.7:

J5AnalysisAM&PMPeakcurrentyear2011

Table4.8:

J6AnalysisAM&PMPeakcurrentyear2011

Table5.1:

DevelopmentUnits

Table5.2:

TheAdoptedTripGenerationRates

Table5.3:

ProjectedTrafficGenerationPatternsfromProposedDevelopment

Table6.1:

TripGeneratedbyAdjacentDevelopment

Table6.2:

TripGeneratedbyProposedDevelopment

Table6.3:

MidBlockPerformanceAnalysisforAMandPMPeakHour

Table6.4:

ProposedTripDistributionforNorthernAccess

Table6.5:

ProposedTripDistributionforSouthernAccess

Table6.6:

J1AnalysisAM&PMPeakFutureYear2016With&WithoutDevelopment

Table6.7:

J2AnalysisAM&PMPeakFutureYear2016With&WithoutDevelopment

Table6.8:

J3AnalysisAM&PMPeakFutureYear2016With&WithoutDevelopment

Table6.9:

J4AnalysisAM&PMPeakFutureYear2016With&WithoutDevelopment

Table6.10:

J5AnalysisAM&PMPeakFutureYear2016With&WithoutDevelopment

Table6.11:

J6AnalysisAM&PMPeakFutureYear2016With&WithoutDevelopment

Table6.12:

Completion10YearsTrafficVolumeProjectionatJ1

Table6.13:

Completion10YearsTrafficVolumeProjectionatJ2

Table6.14:

Completion10YearsTrafficVolumeProjectionatJ3

Table6.15:

Completion10YearsTrafficVolumeProjectionatJ4

Table6.16:

Completion10YearsTrafficVolumeProjectionatJ5

Table6.17:

Completion10YearsTrafficVolumeProjectionatJ6

Table7.1:

J4PerformanceAnalysisWith&WithoutImprovementYear2016

Table7.2:

ProposedSignalPhasingattheJ4SignalisedJunctionYear2016

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

1.0

2011

INTRODUCTION

The proposed development is located on Lot 1683 (PT 4609), 16834 (PT 4610), 16835 (PT
4611),16836and16837,TamanMelawati,MukimSetapak,DaerahGombak,SelangorDarul
Ehsan.Thisareaisproposedtobedevelopedintoahighincomeresidentialarea.Adjacent
landuseactivitiesareresidentialareaswithinTamanMelawatiandinstitutionssuchasSJKT
TamanMelawati,SMKTamanMelawati,SKTamanMelawati2andInternationalSchoolof
KualaLumpur.

KI Integrated Consultants Sdn BhdwascommissionedtoconductacomprehensiveTraffic


ImpactAssessmenttoassessthecirculationoftheproposeddevelopmentandtodetermine
the impact of the development on the proposed road network. Corrective measures to
mitigateanytrafficimpactwillalsoberecommended.

This study report will form a supporting document in the developers submission for
approval.

2.0

STUDYOBJECTIVE

Themainobjectiveofthisstudyistoexaminetheimpactoftheproposeddevelopmenton
the road network within the vicinity of the development and to determine if the roadway
andjunctionlayoutcancopewiththefuturetrafficdemand.

3.0

THESTUDYAREA

ThestudyareaislocatedwithintheresidentialareaofTamanMelawatiandisborderedby
Jalan Taman Melawati. The area is accessible from the Middle Ring Road (MRRII) via Jalan
Taman Melawati. Existing landmarks located near to the site are the International School
locatedtothesouthwestandKClublocatedtothesoutheast.Thelocationoftheproposed
developmentisshowninFigure3.1.

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

2011

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

4.0

2011

EXISTINGTRAFFICCONDITIONS

Assessmentoftheexistingtrafficconditionsforthesurroundingroadnetworkinthevicinity
of the development site was ascertained through visual reconnaissance surveys as well as
conducting traffic count surveys. In addition, road inventory was also carried out to
determinethecharacteristicsoftheexistingroadsandjunctionsinthestudyarea.Thesewill
providebothaquantitativeandqualitativemeasuresoftheexistingtrafficconditionsaswell
asunderstandingofthepresenttrafficpatternandcharacteristics.

4.1

RoadandJunctionInventory

Site reconnaissance was conducted to determine the access points to the proposed
development. An inventory of the existing characteristics of the roads/junctions such as
lanes,trafficcirculation,junctioncontrolandlayoutwasalsodeveloped.

Therearetwoexistingaccesspointtowardsthedevelopmentfromthenorthandsouth.The
northernaccessisviaJalanG2whereasthesouthernaccessisviaJalanG1.

The proposed development is planned to gain access via both the northern and southern
accesspoints.

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

4.2

2011

ExistingTrafficVolume

A Manual Classified Count (MCC) was carried out to determine the existing traffic flow
patternsandtheperiodofpeakhoursontheexistingroadsandjunctionsinthevicinityof
thedevelopment.

Thetrafficcountsurveywasconductedon26thJuly2011from6.30am9.30amforAMpeak
and4.30pm7.30pmforPMpeak.Thetrafficsurveywasconductedmanuallyat15minutes
intervalsandwasclassifiedintothefollowingfivevehiclecategories:

i)

Car,taxiandprivateVans;

ii) Motorcycles;
iii) Lighttrucks(2axle);
iv) Heavytrucks;and
v) Buses.

ThetrafficsurveylocationsareshowninFigure4.1.Detailsofsurveylocationsareasfollows:

J1(Roundabout)JalanMelawati4JalanTamanMelawati(BukitEmasRoundabout)

J2(PriorityJunction)JalanMelawati4JalanG2

J3(Roundabout)JalanMelawati4JalanTamanMelawati(JadeHillsRoundabout)

J4(PriorityJunction)JalanTamanMelawatiJalanMelawati1

J5(PriorityJunction)JalanMelawati1JalanG1

J6(PriorityJunction)JalanMelawati1JalanTamanMelawati

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

2011

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

4.3

2011

AnalysisofSurveyData

Priortoanalyzingthetrafficdatacollectedfromthetrafficsurveys,allcountedvehicleswere
converted into passenger car unit (pcu) to account for the varying vehicular composition.
The factors used in converting the various classes of vehicles to passenger units were
adoptedfromtheTripGenerationManualbyMalaysiaHighwayPlanningUnit(HPU,2010)
andareshowninTable4.1

Table4.1:ConversionFactorstoPCU
TypeofVehicles

EquivalentValueinPCU

Motorcycle
Car
LightTruck
HeavyTruck
Bus

0.33
1.00
1.75
2.25
2.25

The findings of traffic surveys provide information not only on the vehicular turning
movementpatternsbutalsothetotaltrafficdemandsofeachconnectingroadlink.

Basedonthetrafficcounts,thepeakhourswasdeterminedwhichisfrom6.45am7.45am
forAMpeakand6.15pm7.15pmforPMpeak.Figure4.2showsthetrafficvolumeinthe
vicinityofstudyareaduringAM&PMpeak.

4.4

PerformanceofExistingRoad

Theoperationalperformanceofaroad,usuallymeasuredintermofvolumetocapacity(v/c)
ratio,isameasureofoccupancyofaparticularroadsection.Performanceanalysisiscarried
outfortheexistingroadleadingintothedevelopmentsite.

Table4.2indicatestherelationofLOSandV/Cratiosaswellastheirdefinitionsintermsof
urban road performance that are adopted in this study. (Source: Transportation Research
Board,HighwayCapacityManual,MinistryofWorks,Malaysia)

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

2011

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

2011

Table4.2:LevelofServiceandVolume/CapacityRatioCorrelation
LOS

V/CRatio

0.00to0.60

0.61to0.70

0.71to0.80

0.81to0.90

0.91to1.00

Morethan1

TrafficSituation
Freeflowwithlowvolumes,densitiesandhighspeeds.
Drivercanmaintaintheirdesiredspeedswithlittleorno
delay.
Stableflow.Operatingspeedsbeginningtoberestricted
somewhatbytrafficconditions.Someslightdelay.
Stableflow.Speedsandmaneuverabilityaremoreclosely
controlledbyhighervolumes.Acceptabledelay.
Approachingunstableflow.Tolerableoperatingspeeds
whichareconsiderablyaffectedbyoperatingconditions.
Tolerabledelay.
Unstableflow.Yetloweroperatingspeedsandperhaps
stoppagesofmomentaryduration.Volumesatornear
capacityandintolerabledelay.
Forcedflow.Speedsandvolumecandroptozero.
Stoppagecanoccurforlongperiods.Queuesofvehicles
backingupfromarestrictiondownstream.

The operational performances of the junctions were assessed using aaSIDRA. aaSIDRA is a
traffic engineering software developed by Akcelik & Associates as an aid to junction
performanceanalysis.

The performances of J1 until J6 were assessed and the results are summarized in Table 4.3
untilTable4.8.

J1isoperatingatLOSAintheAMpeakandPMpeak.IntheAMPeak,theapproachfrom
Jalan Taman Melawati (North) has the highest delay with an average queue of 9m. This is
because the heavy traffic from the west has to give way to a higher conflicting movement
circulatingtheroundabout.InthePMpeak,theapproachfromJalanH1(West)hasanaverage
queueof39m.J1junctionperformanceissummarizedinTable4.3.

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

2011

Table4.3:J1AnalysisAM&PMPeakcurrentyear2011
J1_AM 2011
Roundabout
----------------------------------------------------------------Mov
Mov
Total Total
Deg.
Aver.
LOS Longest Queue
ID
Typ
Flow
Cap.
of
Delay
95% Back
(veh
(veh
Satn
(vehs) (m)
/h)
/h)
(v/c) (sec)
----------------------------------------------------------------South: J6
1 L
39
608
0.064
5.4
A
0.1
0
2 T
246
989
0.249
4.3
A
0.8
4
3 R
170
684
0.249
11.4
A
0.8
4
----------------------------------------------------------------East: J2
4 L
200
1126
0.178
7.6
A
1.0
5
5 T
28
315
0.089
6.0
A
0.4
2
6 R
54
607
0.089
13.1
A
0.4
2
----------------------------------------------------------------North: Jalan Tmn Melawati
7 L
41
107
0.383
6.9
A
1.8
9
8 T
337
877
0.384
5.9
A
1.8
9
9 R
42
109
0.385*
12.8
A
1.8
9
----------------------------------------------------------------West: Jln H1
10 L
26
76
0.342
6.2
A
1.2
6
11 T
55
161
0.342
5.2
A
1.2
6
12 R
324
948
0.342
12.1
A
1.2
6
----------------------------------------------------------------ALL VEHICLES:
1562
0.385
A
1.8
9
----------------------------------------------------------------J1_PM 2011
Roundabout
----------------------------------------------------------------Mov
Mov
Total Total
Deg.
Aver.
LOS Longest Queue
ID
Typ
Flow
Cap.
of
Delay
95% Back
(veh
(veh
Satn
(vehs) (m)
/h)
/h)
(v/c) (sec)
----------------------------------------------------------------South: J6
1 L
46
328
0.140
6.3
A
0.5
2
2 T
559
1026
0.545
6.0
A
4.1
21
3 R
222
407
0.545
13.2
A
4.1
21
----------------------------------------------------------------East: J2
4 L
200
1071
0.187
6.3
A
0.7
4
5 T
215
638
0.337
5.0
A
1.9
10
6 R
220
652
0.337
12.1
A
1.9
10
----------------------------------------------------------------North: Jalan Tmn Melawati
7 L
26
53
0.491
9.6
A
4.1
21
8 T
284
574
0.495
8.7
A
4.1
21
9 R
81
164
0.494
15.5
A
4.1
21
-----------------------------------------------------------------

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

2011

West: Jln H1
10 L
9
12
0.750*
13.0
B
7.7
39
11 T
556
761
0.731
12.0
B
7.7
39
12 R
36
49
0.735
18.9
B
7.7
39
----------------------------------------------------------------ALL VEHICLES:
2454
0.750
B
7.7
39
-----------------------------------------------------------------

Basedonthejunctionperformanceanalysis,J2isoperatingwithintheavailablecapacitywith
LOSAduringbothpeakhours.Table4.4showsdetailsofJ2junctionperformance.

Table4.4:J2AnalysisAM&PMPeakCurrentYear2011
J2_AM
Give-Way Sign Controlled Intersection
----------------------------------------------------------------Mov
Mov
Total Total
Deg.
Aver.
LOS Longest Queue
ID
Typ
Flow
Cap.
of
Delay
95% Back
(veh
(veh
Satn
(vehs) (m)
/h)
/h)
(v/c) (sec)
----------------------------------------------------------------South: development
1 L
17
559
0.030
9.4
A
0.0
0
3 R
8
263
0.030
9.5
A
0.0
0
----------------------------------------------------------------East: J3
4 L
14
54
0.259*
8.2
A
0.0
0
5 T
1117
4343
0.257
0.0
A
0.0
0
----------------------------------------------------------------West: J1
11 T
214
4311
0.050
0.6
A
0.2
1
12 R
2
40
0.050
9.5
A
0.2
1
----------------------------------------------------------------ALL VEHICLES:
1372
0.259
0.4
NA
0.2
1
----------------------------------------------------------------J2_PM
----------------------------------------------------------------Mov
Mov
Total Total
Deg.
Aver.
LOS Longest Queue
ID
Typ
Flow
Cap.
of
Delay
95% Back
(veh
(veh
Satn
(vehs) (m)
/h)
/h)
(v/c) (sec)
----------------------------------------------------------------South: development
1 L
12
551
0.022
9.3
A
0.0
0
3 R
6
276
0.022
9.5
A
0.0
0
----------------------------------------------------------------East: J3
4 L
12
51
0.235*
8.2
A
0.0
0
5 T
1014
4346
0.233
0.0
A
0.0
0
----------------------------------------------------------------West: J1
11 T
429
4175
0.103
0.5
A
0.4
2
12 R
11
107
0.103
9.4
A
0.4
2
----------------------------------------------------------------ALL VEHICLES:
1484
0.235
0.4
NA
0.4
2

10

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

2011

ResultinTable4.5showsJ3isoperatingwithinacceptableLOS,LOSAforAMandPMpeak.
Asshownfromtheanalysis,thesouthernmovementexperiencesthehighestdelayduring
bothpeakhours.Thisisprimarilybecauseofthehighertrafficvolumecomingfromthesouth.
Table4.5:J3AM&PMPeakCurrentYear2011
J3_AM 2011
Roundabout
----------------------------------------------------------------Mov
Mov
Total Total
Deg.
Aver.
LOS Longest Queue
ID
Typ
Flow
Cap.
of
Delay
95% Back
(veh
(veh
Satn
(vehs) (m)
/h)
/h)
(v/c) (sec)
----------------------------------------------------------------South: J4
1 L
514
2050
0.251*
7.2
A
3.1
16
2 T
164
1329
0.123
6.0
A
1.5
7
3 R
89
721
0.123
13.4
A
1.5
7
----------------------------------------------------------------East: others new development
4 L
116
1239
0.094
8.4
A
1.3
6
5 T
58
619
0.094
6.7
A
1.3
6
6 R
178
1858
0.096
14.1
A
1.3
7
----------------------------------------------------------------North: jln tmn melawati
7 L
5
22
0.227
5.7
A
2.1
11
8 T
128
551
0.232
4.7
A
2.1
11
9 R
588
2531
0.232
11.5
A
2.1
11
----------------------------------------------------------------West: J2
10 L
28
909
0.031
6.2
A
0.3
2
11 T
56
1818
0.031
5.0
A
0.3
2
12 R
132
2727
0.048
11.9
A
0.5
3
----------------------------------------------------------------ALL VEHICLES:
2056
0.251
A
3.1
16
----------------------------------------------------------------J3_PM 2011
Roundabout
----------------------------------------------------------------Mov
Mov
Total Total
Deg.
Aver.
LOS Longest Queue
ID
Typ
Flow
Cap.
of
Delay
95% Back
(veh
(veh
Satn
(vehs) (m)
/h)
/h)
(v/c) (sec)
----------------------------------------------------------------South: J4
1 L
473
2174
0.218*
6.5
A
2.7
14
2 T
121
1020
0.119
5.4
A
1.5
7
3 R
137
1155
0.119
12.8
A
1.5
7
----------------------------------------------------------------East: others new development
4 L
107
1145
0.093
9.3
A
1.3
7
5 T
62
663
0.094
7.6
A
1.3
7
6 R
134
1434
0.093
14.9
A
1.3
7

11

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

2011

North: jln tmn melawati


7 L
6
28
0.214
6.4
A
2.4
12
8 T
34
156
0.218*
5.4
A
2.4
12
9 R
517
2376
0.218*
12.2
A
2.4
12
----------------------------------------------------------------West: J2
10 L
20
1219
0.016
6.1
A
0.2
1
11 T
26
1584
0.016
4.9
A
0.2
1
12 R
394
2803
0.141
11.9
A
1.5
8
----------------------------------------------------------------ALL VEHICLES:
2031
0.218
A
2.7
14
-----------------------------------------------------------------

EventhoughthereisatrafficlightsignalatJunctionJ4,thesignalisnotoperational.Assuch,
thejunctionisassessedasapriorityjunctionandtheresultoftheassessmentissummarized
inTable4.6.
Table4.6:J4AM&PMPeakCurrentYear2011
J4_AM
Give-Way Sign Controlled Intersection
----------------------------------------------------------------Mov
Mov
Total Total
Deg.
Aver.
LOS Longest Queue
ID
Typ
Flow
Cap.
of
Delay
95% Back
(veh
(veh
Satn
(vehs) (m)
/h)
/h)
(v/c) (sec)
----------------------------------------------------------------South: MRR2
1 L (Slp)
200
2200
0.091
7.6
A
0.0
0
2 T
703
4400
0.160
0.0
A
0.0
0
----------------------------------------------------------------North: J3
8 T
972
4128
0.235
0.0
A
0.0
0
9 R
61
259
0.236*
8.2
A
0.0
0
----------------------------------------------------------------West: J5
10 L
137
1167
0.117
8.2
A
0.0
0
12 R
299
2547
0.117
8.0
A
0.0
0
----------------------------------------------------------------ALL VEHICLES:
2372
0.236
NA
0.0
0
--------------------------------------------------------------------------------------------------------------------------------West: Jln Melawati 3
10 L
90
717
0.126
8.8
A
0.1
1
12 R
135
1075
0.126
8.8
A
0.1
1
----------------------------------------------------------------ALL VEHICLES:
1239
0.187
2.8
NA
0.1
1
-----------------------------------------------------------------

12

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

2011

J4_PM
Give-Way Sign Controlled Intersection
----------------------------------------------------------------Mov
Mov
Total Total
Deg.
Aver.
LOS Longest Queue
ID
Typ
Flow
Cap.
of
Delay
95% Back
(veh
(veh
Satn
(vehs) (m)
/h)
/h)
(v/c) (sec)
----------------------------------------------------------------South: MRR2
1 L (Slp)
156
2200
0.071
7.6
A
0.0
0
2 T
416
4400
0.095
0.0
A
0.0
0
----------------------------------------------------------------North: J3
8 T
411
4077
0.101*
0.0
A
0.0
0
9 R
31
308
0.101*
8.2
A
0.0
0
----------------------------------------------------------------West: J5
10 L
90
1857
0.048
8.2
A
0.0
0
12 R
35
1857
0.019
8.0
A
0.0
0
----------------------------------------------------------------ALL VEHICLES:
1139
0.101
NA
0.0
0
-----------------------------------------------------------------

The junction analysis conducted shows that J5 is operating within acceptable capacity with
LOS A during AM and PM peak. The movement from the East has the longest queue
comparatively,whichis3mand7mintheAMandPMpeakrespectively.Table4.7showsthe
junctionanalysisforJ5.
Table4.7:J5AM&PMPeakCurrentYear2011
J5_AM 2011
Give-Way Sign Controlled Intersection
----------------------------------------------------------------Mov
Mov
Total Total
Deg.
Aver.
LOS Longest Queue
ID
Typ
Flow
Cap.
of
Delay
95% Back
(veh
(veh
Satn
(vehs) (m)
/h)
/h)
(v/c) (sec)
----------------------------------------------------------------East: J5
5 T
273
4129
0.066*
0.4
A
0.6
3
6 R
21
318
0.066*
9.2
A
0.6
3
----------------------------------------------------------------North: J1
7 L
33
921
0.036
11.9
A
0.2
1
9 R
5
596
0.008
13.3
A
0.0
0
----------------------------------------------------------------West: J6
10 L
13
239
0.054
8.2
A
0.0
0
11 T
247
4549
0.054
0.0
A
0.0
0
----------------------------------------------------------------ALL VEHICLES:
592
0.066
NA
0.6
3
-----------------------------------------------------------------

13

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

2011

J5_PM 2011
Give-Way Sign Controlled Intersection
----------------------------------------------------------------Mov
Mov
Total Total
Deg.
Aver.
LOS Longest Queue
ID
Typ
Flow
Cap.
of
Delay
95% Back
(veh
(veh
Satn
(vehs) (m)
/h)
/h)
(v/c) (sec)
----------------------------------------------------------------East: J5
5 T
613
4376
0.140*
0.4
A
1.4
7
6 R
29
207
0.140*
9.2
A
1.4
7
----------------------------------------------------------------North: J1
7 L
18
960
0.019
11.7
A
0.1
0
9 R
1
341
0.003
18.4
A
0.0
0
----------------------------------------------------------------West: J6
10 L
1
22
0.045
8.2
A
0.0
0
11 T
216
4777
0.045
0.0
A
0.0
0
----------------------------------------------------------------ALL VEHICLES:
878
0.140
NA
1.4
7
-----------------------------------------------------------------

Fromtheanalysisconducted,J6isalsooperatingwithinacceptablecapacitywithLOSAand
LOSBduringbothpeakperiods.Table4.8tabulatestheresultsofJ6junctionanalysis.

Table4.8:J6AM&PMPeakCurrentYear2011
J6_AM 2011
Give-Way Sign Controlled Intersection
----------------------------------------------------------------Mov
Mov
Total Total
Deg.
Aver.
LOS Longest Queue
ID
Typ
Flow
Cap.
of
Delay
95% Back
(veh
(veh
Satn
(vehs) (m)
/h)
/h)
(v/c) (sec)
----------------------------------------------------------------South: MRR2
2 T
642
2200
0.292*
0.0
A
0.0
0
3 R
162
815
0.199
11.6
A
0.1
1
----------------------------------------------------------------East: J5
4 L
245
1221
0.201
8.8
A
0.3
2
6 R
21
1211
0.017
8.7
A
0.0
0
----------------------------------------------------------------North: J1
7 L
111
663
0.167
8.2
A
0.0
0
8 T
620
3704
0.167
0.0
A
0.0
0
----------------------------------------------------------------ALL VEHICLES:
1801
0.292
NA
0.3
2
-----------------------------------------------------------------

14

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

2011

J6_PM 2011
Give-Way Sign Controlled Intersection
----------------------------------------------------------------Mov
Mov
Total Total
Deg.
Aver.
LOS Longest Queue
ID
Typ
Flow
Cap.
of
Delay
95% Back
(veh
(veh
Satn
(vehs) (m)
/h)
/h)
(v/c) (sec)
----------------------------------------------------------------South: MRR2
2 T
488
2200
0.222
0.0
A
0.0
0
3 R
212
834
0.254
11.5
A
0.2
1
----------------------------------------------------------------East: J5
4 L
528
1306
0.404*
8.8
A
1.0
5
6 R
60
1274
0.047
8.6
A
0.1
0
----------------------------------------------------------------North: J1
7 L
85
766
0.111
8.2
A
0.0
0
8 T
399
3596
0.111
0.0
A
0.0
0
----------------------------------------------------------------ALL VEHICLES:
1772
0.404
NA
1.0
5
-----------------------------------------------------------------

Figure4.3showstheexistingoveralljunctionperformanceinthevicinityofstudyarea.

15

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

2011

16

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

5.0

THEPROPOSEDDEVELOPMENT

5.1

SiteLocation

2011

The proposed development is located on Lot 16833 (PT 4609), 16834 (PT 4610), 16835 (PT
4611),16836dan16837,TamanMelawati.Theproposedsiteiscurrentlyanemptylandandit
isplannedtobedevelopedinyear2012andcompletedinyear2016.

5.2ProposedAccess
Theproposeddevelopmentisaccessibleviatwo(2)newaccesses:
a) viaJalanG2(NorthenAccess)
JalanG2currentlyservedtheinternaltrafficforTamanMelawati.Thisroadwillallow
trafficfromJalanMelawati4towardstheproposeddevelopment.
b) viaJalanG1(SouthernAccess)
ThissouthernaccessconnectsJalanMelawati3towardstheproposeddevelopment.
ThisroadcurrentlyoperatesasapriorityTJunction.

ThelayoutforboththenorthernandsouthernaccessesisshowninFigure5.1.

17

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

2011

18

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

5.3

2011

DevelopmentComponent

The development site covers an area of about 42.24 acres (300,999.6 ft2) and will be
developedasahighincomeresidentialarea.Asummaryofthedevelopmentcomponentsis
showninTable5.1.
Table5.1:DevelopmentUnits
LanduseActivity

Units

StrataLink/TerraceLink
DetachedHouse
Condominium
TOTAL

22
116
72
210

5.4

TheProjectedTrafficGenerationPatterns

The future traffic generation patterns of the development upon its full completion and
operation are projected based on the traffic generation rates of the Traffic Generation
ManualdevelopedbytheHighwayPlanningUnit(HPU)ofMinistryofWorks,2010.

In this TIA report, the future traffic generation pattern of the development component is
calculatedfortheAMandPMpeakperiodstoprovideaworstcasescenarioforassessment.
TherelevanttrafficgenerationratesadoptedforthisstudyarelistedinTable5.2.

19

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

2011

Table5.2:AdoptedTripGenerationRates
Vehicle
Trips

PCU
Conversion

%Inbound

%Outbound

TerraceLink/Townhouse
AMPeak

0.78

0.89

0.29

0.71

PMPeak

0.76

0.85

0.60

0.40

LandUsage

Flat/Apartment/Condominium
AMPeak

0.48

0.91

0.27

0.73

PMPeak

0.45

0.88

0.63

0.37

SemiD/DetachedHouse
AMPeak

1.51

0.96

0.35

0.65

1.54

0.92

0.53

0.47

PMPeak

TheprojectedtrafficgenerationpatternofthedevelopmentissummarizedinTable5.3.It
representstheultimateortheworstfuturedevelopmentscenario,inwhichalldevelopment
componentsarefullyoccupied.

Table5.3:ProjectedTrafficGenerationfromProposedDevelopment
VehicleTrips

PCUTrips

Inbound
(PCU)

Outbound
(PCU)

AMPeak

17

15

11

PMPeak

16

15

DetachedHouse
AMPeak

175

168

59

109

PMPeak

178

164

87

77

Condominium
AMPeak

34

31

23

PMPeak

32

29

18

11

Total

Total
AMPeak

72

143

114

93

LandUsage
TerraceLink

PMPeak

Figure5.2showsthetrafficattractedandgeneratedbytheproposeddevelopment.

20

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

21

2011

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

6.0

2011

ASSESSMENTOFFUTURETRAFFICSCENARIO

Thefuturetrafficisdividedintotwotrafficcomponentsasdescribedbelow:

i)

the nonsite comprising traffic passing through the roads in the vicinity of the
projectsiteand,

ii)

siterelatedtrafficcomprisingtrafficgeneratedbyandattractedtotheproposed
developmentsite.

Thetrafficforecastfocusesontwocriticalhoursofthedayi.e.morningpeakandevening
peakhours.Itisexpectedthatonatypicalweekdaythehighesttrafficvolumesarerecorded
during these hours. Thus, the performances of road and junction are tested based on this
criticalconditionanddesign/improvementsofroad/junctionscanbemadeaccordingly.

Inforecastingthefuturetraffic,itisnecessarytodeterminethedesignyeartobeadopted.
In this traffic study, it is expected that the proposed development will be fully completed
and occupied by year 2016. A 10year traffic projection (i.e.: 2026) is also forecasted to
determinetheoperationsofthesurroundingroadnetwork.

6.1

NonSite(Base)Traffic

Thebasetrafficiscalculatedbyapplyingatrafficgrowthrateontotheexistingflowsupto
the design year when the proposed development is fully completed and occupied. The
adoptedannualtrafficgrowthwithinthestudyareais3%asthesurroundingdevelopmentis
alreadydeveloped.

Apart from this traffic growth, adjacent confirmed residential developments are also
included as the future traffic volume. When completed and occupied, these new
developments are expected to further contribute to the traffic volume on Jalan Taman
Melawati.ThetripgenerationsofthesedevelopmentsaretabulatedinTable6.1.

22

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

2011

Table6.1:TripsGeneratedbyadjacentnewresidentialdevelopment
Developers
(adjacentdevelopments
completedbefore
proposeddevelopment
comesinbyYear2016)
Contours
DsaraResidencesSdn
Bhd
20TreesWest
SDBPropertiesSdnBhd

SunwayRydgeway
SunwayDevelopment
Bhd

TripGeneration(PCU)
Landuse
Components

Area
(Units)

Bungalow

Peak

Inbound

Outbound

Total

41

am
pm

21
31

39
27

59
58

Detached
House

48

am
pm

24
36

45
32

70
68

Detached
House
Semi
Detached

40
30

am
pm

36
53

66
47

101
99

Note:NoconfirmedcompletiondateisavailablefordevelopersKLHMelawatiandIdoliteCorporation.
Thesedevelopmentsareassumedtobecompletedafteryear2016andassuchareexcludedfromthis
trafficstudy

Figure 6.1 shows the future traffic volume in the vicinity of study area. The above
assumptions present the worst future traffic scenario of the development site and its
immediatesurroundings.

23

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

24

2011

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

6.2

2011

DevelopmentTrafficForecast

The trips forecast for the proposed land use is generated according to the trip rates
describedinSection5andissummarisedinTable6.2.

Table6.2:FuturetripsbyproposeddevelopmentAM&PMpeak
FutureTripsGeneration(PCU)
AMPeak
PMPeak
Inbound
Outbound
Inbound
Outbound

Landuse
Component

Units

DetachedHouse

116

11

Condominium

72

59

109

87

77

TerraceLink

22

23

18

11

TOTAL

215

207

Thedevelopmentisexpectedtogenerateandattract215pcuintheAMpeakand207pcuin
thePMpeak.

6.3

TripsDistributionandAssignmentModel

Theproposeddevelopmentisaccessiblefromvia2junctions:
i)

Fromthenorthernjunction(JalanG2)

ii) Fromthesouthernjunction(JalanG1)

From the analysis of current traffic flow pattern, the traffic distributions for the trip
generatedbytheproposeddevelopmentareassumedtobeasfollows:

Table6.3:ProposedTripDistributionforproposeddevelopment

Ingress(%)

Egress(%)

NorthernAccess

50

50

SouthernAccess

50

50

Total

100

100

Of this equal distribution, the trip distribution for the northern and southern access is
furthertabulateinTable6.4andTable6.5.

25

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

2011

Table6.4:ProposedTripDistributionforNorthernAccess
Direction

Ingress(%)

Egress(%)

AMPeak

PMPeak

AMPeak

PMPeak

West

14

48

58

58

East

86

52

42

42

Table6.5:ProposedTripDistributionforSouthernAccess
Direction

Egress(%)

Ingress(%)
AMPeak

PMPeak

AMPeak

PMPeak

West

38

15

65

East

62

97

85

35

Figures 6.2 show the overall traffic volume after distribution for AM & PM peak with
development.

26

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

27

2011

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

6.4

2011

TrafficPerformanceAssessment

Trafficassessmentsarecarriedoutat J1untilJ6to determinetheimpactofthe proposed


development onto the surrounding road network. Tables 6.6 until 6.11 summarized the
resultsofthejunctionanalysisforbothAMPeakandPMPeakandprovidesacomparison
withyear2016withoutthedevelopment.

Table6.6:J1AnalysisFutureYear2016WithandWithoutDevelopment
WithoutDevelopment

Approaches

AMPEAK

PMPEAK

WithDevelopment
AMPEAK

ApproachfromJ6(South)

PMPEAK

PCU/hour

558

977

568

1031

Volume/Capacity

0.31

0.30

0.31

0.67

Delay(second)

7.3

7.2

7.4

8.6

L.O.S.

AveQueueLength(meter)

20

33

PCU/hour

327

622

435

698

Volume/Capacity

0.23

0.20

0.34

0.39

Delay(second)

9.4

10.3

9.4

10.6

L.O.S.

AveQueueLength(meter)

15

12

15

PCU/hour

487

453

487

448

Volume/Capacity

0.49

0.23

0.49

0.54

Delay(second)

8.0

8.1

8.1

10.2

L.O.S.

AveQueueLength(meter)

16

17

17

23

PCU/hour

470

465

470

465

Volume/Capacity

0.41

0.33

0.42

0.72

Delay(second)

11.2

14.1

11.3

21.9

L.O.S.

AveQueueLength(meter)

22

40

ApproachfromJ2(East)

ApproachfromJalanTmnMelawati
(North)

ApproachfromJalanH1(West)

OverallRoundaboutPerformance

28

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

2011

In year 2016, the analysis of J1 shows that the overall performance of the roundabout
without the development is operating at LOS A during AM and PM peak. With the
completion of the proposed development, the overall performance of J1 is at a LOS of A
during AM peak LOS B during PM peak. This is because the traffic generated by the
proposeddevelopmentislowatJ1roundabout.

Table6.7showsthejunctionperformanceanalysisforJ2inYear2016.Basedontheresult,
theapproachfromwestexperiencesalongestqueuelengthi.e1mand3mwithLOSofA
during AM and PM peak respectively. With the completion of the proposed development,
thisapproachwillstillperformwithintheavailablecapacitywiththelongestqueuelengthof
1mand3mduringtheAMandPMpeak.

Table6.7:J2PerformanceAnalysisYear2016WithandWithoutDevelopment
WithoutDevelopment

Approaches

AMPEAK

PMPEAK

WithDevelopment
AMPEAK

Approachfromthedevelopment(South)

PMPEAK

29

21

172

114

Volume/Capacity

0.04

0.03

0.24

0.16

Delay(second)

9.8

9.7

10.4

10.2

L.O.S.

AveQueueLength(meter)

PCU/hour

1336

1211

1398

1270

Volume/Capacity

0.30

0.28

0.32

0.29

Delay(second)

0.1

0.1

0.5

0.5

L.O.S.

AveQueueLength(meter)

PCU/hour

250

510

260

564

Volume/Capacity

0.06

0.12

0.06

0.15

Delay(second)

0.9

0.9

1.2

1.7

L.O.S.

0A

AveQueueLength(meter)

OverallPriorityTJunctionPerformance

PCU/hour

ApproachfromJ3(East)

ApproachfromJ1(West)

29

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

2011

Table 6.8 tabulates the junction performance of J3 comparing with and without the
developmentrespectively.TheanalysisshowsthattheroundaboutwilloperateatLevelof
Services (LOS) of A during AM and PM peak. It is expected that J3 roundabout will be
heavilyutilizedbythenewadjacentdevelopmentasJ3roundaboutwillbethemainaccess
roadtowardstheirdevelopment.

Table6.8:J3AnalysisFutureYear2016WithandWithoutDevelopment
WithoutDevelopment

Approaches

AMPEAK

PMPEAK

WithDevelopment
AMPEAK

ApproachfromJ4(South)

PMPEAK

PCU/hour

938

944

1000

1003

Volume/Capacity

0.38

0.31

0.42

0.35

Delay(second)

9.7

9.2

9.7

9.1

L.O.S.

AveQueueLength(meter)

26

22

29

24

PCU/hour

558

457

558

457

Volume/Capacity

0.19

0.19

0.19

0.19

Delay(second)

12.5

13.7

12.5

13.7

L.O.S.

AveQueueLength(meter)

14

15

14

15

PCU/hour

835

649

1022

871

Volume/Capacity

0.29

0.31

0.42

0.51

Delay(second)

10.5

12.6

10.8

13.9

L.O.S.

AveQueueLength(meter)

15

20

23

36

PCU/hour

280

529

368

704

Volume/Capacity

0.07

0.20

0.11

0.31

Delay(second)

9.6

11.7

10.5

12.5

L.O.S.

AveQueueLength(meter)

13

23

OverallRoundaboutPerformance

ApproachfromAdjacentNew
Development(East)

ApproachfromJlnTamanMelawati
(North)

ApproachfromJ2(West)

30

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

2011

Table6.9showsthejunctionperformanceofJ4inYear2016.Byyear2016,J4isoperatingat
lowest capacity with the lowest LOS of F during AM peak. The approach from west
experiencesthelongestqueuelengthof913mduringAMpeak.Withthecompletionofthe
development,thejunctionperformanceforJ4willcontinuetobeatLOSFandAduring
theAMandPMpeakperiods,respectively.TheimprovementatJ4willdiscussedfurtheron
chapter7.

Table6.9:J4PerformanceAnalysisYear2016WithandWithoutDevelopment
WithoutDevelopment

Approaches

AMPEAK

PMPEAK

WithDevelopment
AMPEAK

ApproachfromMRR2(South)

PMPEAK

PCU/hour

1095

760

1201

929

Volume/Capacity

0.19

0.13

0.21

0.15

Delay(second)

1.6

1.8

1.7

2.4

L.O.S.

AveQueueLength(meter)

ApproachfromJ3(North)

PCU/hour

1247

550

1247

550

Volume/Capacity

0.46

0.13

0.49

0.18

Delay(second)

7.1

0.5

6.0

4.3

L.O.S.

AveQueueLength(meter)

40

33

PCU/hour

506

261

506

261

Volume/Capacity

2.56

0.07

2.7

0.37

Delay(second)

1463

8.1

1600

19.7

913

942

15

ApproachfromJalanMelawati3(West)

L.O.S.
AveQueueLength(meter)
OverallPriorityTJunctionPerformance

Fromtheanalysiscarriedout,J5willoperateatLOSAduringbothpeakperiodsevenwhen
the developmentis completedandoccupied.The junctionanalysisissummarizedinTable
6.10.

31

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

2011

Table6.10:J5PerformanceAnalysisYear2016WithandWithoutDevelopment
WithoutDevelopment

Approaches

AMPEAK

PMPEAK

WithDevelopment
AMPEAK

ApproachfromJ4(East)

PMPEAK

PCU/hour

340

745

388

862

Volume/Capacity

0.07

0.16

0.09

0.22

Delay(second)

1.1

0.9

2.0

2.0

L.O.S.

AveQueueLength(meter)

Approachfromthedevelopment(North)

44

22

194

120

Volume/Capacity

0.04

0.02

0.19

0.23

Delay(second)

12.4

12.2

12.8

17.9

L.O.S.

AveQueueLength(meter)

PCU/hour

301

251

329

255

Volume/Capacity

0.06

0.05

0.07

0.05

Delay(second)

0.4

1.1

0.2

L.O.S.

AveQueueLength(meter)

OverallPriorityTJunctionPerformance

PCU/hour

ApproachfromJ6(West)

Similarly, junction J6 will operate at LOS A during both peak periods even when the
proposed development is completed and occupied. The junction analysis is summarized in
Table6.11.

32

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

2011

Table6.11:J6PerformanceAnalysisYear2016WithandWithoutDevelopment
WithoutDevelopment

Approaches

AMPEAK

WithDevelopment

PMPEAK AMPEAK

ApproachfromJalanTmnMelawati(South)

PMPEAK

PCU/hour

963

830

1000

888

Volume/Capacity

0.35

0.30

0.36

0.306

Delay(second)

2.3

3.5

2.6

3.3

L.O.S.

AveQueueLength(meter)

PCU/hour

308

682

308

682

Volume/Capacity

0.24

0.48

0.24

0.48

Delay(second)

9.0

8.9

9.0

9.0

L.O.S.

AveQueueLength(meter)

PCU/hour

848

562

848

562

Volume/Capacity

0.19

0.13

0.19

0.13

Delay(second)

1.2

1.4

1.2

1.4

L.O.S.

AveQueueLength(meter)

OverallPriorityTJunctionPerformance

ApproachfromJ5(East)

ApproachfromJ1(North)

Figure6.3showstheoveralljunctionperformanceinthevicinityofstudyareainYear2016.

33

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

2011

34

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

6.5

2011

10yearTrafficForecast(2026)

Inordertodeterminetheroadnetworkperformancewithinaperiodof10years,atraffic
growth of 3% per annum is applied to the total traffic generated within the study area in
year 2016. This 10year traffic volume projection is summarized in Table 6.12 until Table
6.17.

Thejunctionanalysisconductedforyear2026indicatesthattheJ1willbeatLevelofservice
(LOS) C and D during the AM and PM peaks. Table 6.12 summarised the junction
performanceforJ1.

Table6.12:Completionand10yearsTrafficVolumeProjectionatJ1
UponCompletion2016

Approaches

AMPEAK

PMPEAK

Projection2026
AMPEAK

ApproachfromJ6(South)

PMPEAK

PCU/hour

598

1031

749

1362

Volume/Capacity

0.31

0.67

0.42

0.51

Delay(second)

7.4

8.6

7.4

8.3

L.O.S.

AveQueueLength(meter)

33

10

39

PCU/hour

435

698

547

913

Volume/Capacity

0.34

0.39

0.63

0.41

Delay(second)

9.4

10.6

17.7

13.8

L.O.S.

AveQueueLength(meter)

12

15

41

34

PCU/hour

487

448

651

603

Volume/Capacity

0.49

0.54

0.84

0.47

Delay(second)

8.1

10.2

19.7

11.5

L.O.S.

AveQueueLength(meter)

17

23

67

39

ApproachfromJ2(East)

ApproachfromJalanTmnMelawati
(North)

35

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

2011

Table6.12:Completionand10yearsTrafficVolumeProjectionatJ1(cont)
UponCompletion2016

Approaches

Projection2026

AMPEAK

PMPEAK

AMPEAK

PMPEAK

PCU/hour

470

465

632

624

Volume/Capacity

0.42

0.72

0.62

0.90

Delay(second)

11.3

21.9

13.6

82.6

L.O.S.

AveQueueLength(meter)

40

23

162

ApproachfromJalanH1(West)

OverallRoundaboutPerformance

Note:Nogrowthisadoptedtodevelopmenttrafficafterfullycompletionandoccupied.

Thejunctionanalysisconductedforyear2026indicatesthattheJ2willbeatLevelofservice
(LOS)AduringtheAMandPMpeaks.Table6.13summarisedthejunctionperformancefor
J2.

Table6.13:Completionand10yearsTrafficVolumeProjectionatJ2
UponCompletion2016

Approaches

AMPEAK

PMPEAK

Projection2026
AMPEAK

Approachfromthedevelopment(South)

PMPEAK

PCU/hour

172

114

182

122

Volume/Capacity

0.24

0.16

0.33

0.22

Delay(second)

10.4

10.2

12.1

11.8

L.O.S.

AveQueueLength(meter)

PCU/hour

1398

1270

1849

1679

Volume/Capacity

0.32

0.29

0.42

0.38

Delay(second)

0.5

0.5

0.4

0.4

L.O.S.

AveQueueLength(meter)

ApproachfromJ3(East)

36

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

2011

Table6.13:Completionand10yearsTrafficVolumeProjectionatJ2(cont)
UponCompletion2016

Approaches

Projection2026

AMPEAK

PMPEAK

AMPEAK

PMPEAK

PCU/hour

260

564

346

740

Volume/Capacity

0.06

0.15

0.09

0.20

Delay(second)

1.2

1.7

1.8

2.1

L.O.S.

AveQueueLength(meter)

ApproachfromJ1(West)

A
A
A
OverallPriorityTJunctionPerformance
Note:Nogrowthisadoptedtodevelopmenttrafficafterfullycompletionandoccupied.

Thejunctionanalysisconductedforyear2026indicatesthattheJ3willbeatLevelofservice
(LOS) C and B during the AM and PM peaks respectively. Table 6.14 summarised the
junctionperformanceforJ3.

Table6.14:Completionand10yearsTrafficVolumeProjectionatJ3
UponCompletion2016

Approaches

AMPEAK

PMPEAK

Projection2026
AMPEAK

ApproachfromJ4(South)

PMPEAK

PCU/hour

1000

1003

1271

1241

Volume/Capacity

0.42

0.35

0.88

0.71

Delay(second)

9.7

9.1

44.6

17.7

L.O.S.

AveQueueLength(meter)

29

24

182

82

PCU/hour

558

457

698

578

Volume/Capacity

0.19

0.19

0.44

0.57

Delay(second)

12.5

13.7

20.9

42.6

L.O.S.

AveQueueLength(meter)

14

15

23

57

ApproachfromAdjacentDevelopment
(East)

37

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

2011

Table6.14:Completionand10yearsTrafficVolumeProjectionatJ3(cont)
UponCompletion2016

Approaches

Projection2026

AMPEAK

PMPEAK

AMPEAK

PMPEAK

PCU/hour

835

649

1022

871

Volume/Capacity

0.29

0.31

0.42

0.51

Delay(second)

10.5

12.6

10.8

13.9

L.O.S.

AveQueueLength(meter)

15

20

23

36

PCU/hour

280

529

368

704

Volume/Capacity

0.07

0.20

0.11

0.31

Delay(second)

9.6

11.7

10.5

12.5

L.O.S.

AveQueueLength(meter)

13

23

ApproachfromJlnTamanMelawati
(North)

ApproachfromJ2(West)

A
A
C
B
OverallRoundaboutPerformance
Note:Nogrowthisadoptedtodevelopmenttrafficafterfullycompletionandoccupied.

Thejunctionanalysisconductedforyear2026indicatesthattheJ4willbeatLevelofservice
(LOS)FandLOSCduringtheAMandPMpeakrespectively.Table 6.15summarisedthe
junctionperformanceforJ4.Theimprovementatthisjunctionwilldiscussedfurtheronthe
nextchapter.

Table6.15:Completionand10yearsTrafficVolumeProjectionatJ4
UponCompletion2016

Approaches

AMPEAK

ApproachfromJalanTmnMelawati
(South)

PMPEAK

Projection2026
AMPEAK

PMPEAK

PCU/hour

1201

929

1561

1157

Volume/Capacity

0.21

0.15

0.27

0.18

Delay(second)

1.7

2.4

1.7

2.3

L.O.S.

AveQueueLength(meter)

38

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

2011

Table6.15:Completionand10yearsTrafficVolumeProjectionatJ4(cont)
UponCompletion2016

Approaches

Projection2026

AMPEAK

PMPEAK

AMPEAK

PMPEAK

PCU/hour

1247

550

1659

726

Volume/Capacity

0.49

0.18

1.14

0.27

Delay(second)

6.0

4.3

14.8

4.7

L.O.S.

AveQueueLength(meter)

33

107

21

PCU/hour

506

261

679

350

Volume/Capacity

2.7

0.37

4.4

0.71

1600

19.7

3178

36.8

942

15

1505

38

ApproachfromJ3(North)

ApproachfromJalanMelawati3(West)

Delay(second)
L.O.S.
AveQueueLength(meter)

F
A
F
OverallPriorityTJunctionPerformance
Note:Nogrowthisadoptedtodevelopmenttrafficafterfullycompletionandoccupied.

Thejunctionanalysisconductedforyear2026indicatesthattheJ5willbeatLevelofservice
(LOS)AduringtheAMandPMpeaks.Table6.16summarisedthejunctionperformancefor
J5.

Table6.16:Completionand10yearsTrafficVolumeProjectionatJ5
UponCompletion2016

Approaches

AMPEAK

PMPEAK

Projection2026
AMPEAK

ApproachfromJ4(East)

PMPEAK

PCU/hour

388

862

505

1117

Volume/Capacity

0.09

0.22

0.13

0.28

Delay(second)

2.0

2.0

2.0

2.0

L.O.S.

AveQueueLength(meter)

14

39

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

2011

Table6.16:Completionand10yearsTrafficVolumeProjectionatJ5(cont)
UponCompletion2016

Approaches

Projection2026

AMPEAK

PMPEAK

AMPEAK

PMPEAK

PCU/hour

194

120

210

118

Volume/Capacity

0.19

0.23

0.23

0.37

Delay(second)

12.8

17.9

13.7

25.2

L.O.S.

AveQueueLength(meter)

PCU/hour

329

255

433

342

Volume/Capacity

0.07

0.05

0.09

0.07

Delay(second)

1.1

0.2

0.9

0.1

L.O.S.

AveQueueLength(meter)

Approachfromthedevelopment(North)

ApproachfromJ6(West)

A
A
A
OverallPriorityTJunctionPerformance
Note:Nogrowthisadoptedtodevelopmenttrafficafterfullycompletionandoccupied.

Thejunctionanalysisconductedforyear2026indicatesthattheJ6willbeatLevelofservice
(LOS) A and B during the AM and PM peaks respectively. Table 6.17 summarised the
junctionperformanceforJ6.

Table6.17:Completionand10yearsTrafficVolumeProjectionatJ6
UponCompletion2016

Approaches

AMPEAK

ApproachfromJalanTmnMelawati
(South)

PMPEAK

Projection2026
AMPEAK

PMPEAK

PCU/hour

1000

888

1321

1167

Volume/Capacity

0.36

0.306

0.47

0.45

Delay(second)

2.6

3.3

2.7

3.6

L.O.S.

AveQueueLength(meter)

40

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

2011

Table6.17:Completionand10yearsTrafficVolumeProjectionatJ6(cont)
UponCompletion2016

Approaches

Projection2026

AMPEAK

PMPEAK

AMPEAK

PMPEAK

PCU/hour

308

682

415

916

Volume/Capacity

0.24

0.48

0.36

0.67

Delay(second)

9.0

9.0

9.5

9.7

L.O.S.

AveQueueLength(meter)

15

PCU/hour

848

562

1139

754

Volume/Capacity

0.19

0.13

0.26

0.17

Delay(second)

1.2

1.4

1.2

1.4

L.O.S.

AveQueueLength(meter)

ApproachfromJ5(East)

ApproachfromJ1(North)

A
A
A
OverallPriorityTJunctionPerformance
Note:Nogrowthisadoptedtodevelopmenttrafficafterfullycompletionandoccupied.

Figure6.4showsthejunctionperformanceforyear2026.

41

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

2011

42

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

7.0

RECOMMENDATIONS

7.1

UponCompletion(Year2016)
7.1.1

2011

ConversionofPriorityConfigurationtoSignalisedConfigurationatJ4

Fromthisanalysis,inyear2016,theJ4priorityTjunctionisexpectedtooperateata
LOSFduringAMpeak.EventhoughthereisatrafficlightsignalatJunctionJ4,the
signalisnotoperational.Assuch,thejunctionisassessedasapriorityconfiguration
junction Hence it is recommended that this junction is upgraded to a signalized
configurationjunctionbyturnonbacktheexistingsignallight.

Tables7.1summarizetheresultsofthejunctionanalysisforbothAMPeakandPM
Peak and provides a comparison for year 2026 priority and signalized junction
configuration.

Table7.1:J4PerformanceAnalysisWith&WithoutImprovementYear2016
Without
Improvement
(priorityjunction)
2016

Approaches

AM
PEAK
ApproachfromMRR2
(South)

PM
PEAK

With
Improvement
(signalizedjunction)
2016
AM
PEAK

PM
PEAK

With
Improvement
(signalizedjunction)
2026
AM
PEAK

PMPEAK

PCU/hour

1201

929

1201

929

1561

1157

Volume/Capacity

0.21

0.15

0.70

0.38

0.93

0.49

Delay(second)

1.7

2.4

40.0

26.9

58.5

28.9

L.O.S.

AveQueueLength
(meter)

148

88

248

0.6

PCU/hour

1247

550

1247

550

1659

726

Volume/Capacity

0.49

0.18

0.70

0.38

0.93

0.50

Delay(second)

6.0

4.3

39.5

40.9

60.7

42.9

L.O.S.

AveQueueLength
(meter)

33

191

85

341

113

ApproachfromJ3
(North)

43

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

2011

Table7.1:J4PerformanceAnalysisWith&WithoutImprovementYear2016(cont)

Without
Improvement
(priorityjunction)
2016

Approaches

With
Improvement
(signalizedjunction)
2016

With
Improvement
(signalizedjunction)
2026

AM
PEAK

PM
PEAK

AM
PEAK

PM
PEAK

AM
PEAK

PM
PEAK

PCU/hour

506

261

506

261

679

350

Volume/Capacity

2.7

0.37

0.71

0.38

0.91

0.49

1600

19.7

69.7

65.7

88.1

66.3

942

15

129

70

199

91

ApproachfromJ5(West)

Delay(second)
L.O.S.
AveQueueLength
(meter)
OverallPriorityT
JunctionPerformance

The proposed signal phasing at the junction during AM and PM peak are listed in
Table7.2below:

Table7.2:ProposedSignalPhasingattheJ4SignalisedJunctionYear2016
ProposedPhasing

ProposedTiming(AM)

ProposedTiming(PM)

GreenTime=61sec
PhaseTime=66sec

GreenTime=50sec
PhaseTime=55sec

44

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

2011

GreenTime=44sec
PhaseTime=49sec

GreenTime=56sec
PhaseTime=61sec

GreenTime=30sec
PhaseTime=35sec

GreenTime=29sec
PhaseTime=34sec

45

TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.

8.0

2011

CONCLUSION

Basedonthetrafficimpactassessmentcarriedout,theproposeddevelopmentisexpected
togenerateandattract215pcuintheAMpeakand207pcuinthePMpeak.Theproposed
development is expected to gain access from the Northern Access via Jalan G2 as well as
fromtheSouthernAccessviaJalanG1.

Upon completion of the development in year 2016, adjacent junctions are expected to
operate within the available capacity with the lowest LOS of F at Junction 4 in the peak
period. Bear in mind, J4S failure is also contributed by trips generated from adjacent
development that expected to be completed before the proposed development is fully
occupiedinYear2016.

Oncealltheplanneddevelopmentsmatureinyear2016,J4isexpectedtooperateatLOSF
and A during AM & PM peak periods. To improve this junction, it is recommended to be
upgraded to a signalized controlled junction by turn on back the existing signal light for
bettermanagethetrafficflow.

It is recommended that the above junction improvement is cocoordinated with other


junctionimprovementsproposedbytheadjacentdevelopers.Thisistoensurethatamore
robust traffic management scheme is implemented and staged according to the traffic
demandofthearea.Itisalsorecommendedthatalldeveloperswithintheareacontributeto
improvingtheadjacentjunctionstoensurethattrafficflowissmoothforboththeexisting
andnewresidentialcommunities.

46