ASSESSMENT
for Permohonan Pelan Kebenaran Merancang
bagi Pindaan Pelan Lulus Pembangunan
Perumahan (Kondominium) kepada Perumahan
Bercampur di atas Lot 16833 (PT 4609), 16834
(PT 4610), 16835 (PT 4611), 16836 dan 16837,
Taman Melawati, Mukim Setapak, Daerah
Gombak, Selangor Darul Ehsan
NOVEMBER 2011
KI Integrated
Consultants Sdn Bhd
BLOCK 8, TAMAN UNIPARK SURIA
JALAN IKRAM - UNITEN
43000 KAJANG
SELANGOR DARUL EHSAN
MALAYSIA
TEL: (603) 8738 3371
FAX: (603) 8926 6282
TRAFFIC IMPACT ASSESSMENT for Permohonan Pelan Kebenaran Merancang bagi Pindaan Pelan Lulus
Pembangunan Perumahan (Kondominium) kepada Perumahan Bercampur di atas Lot 16833 (PT 4609), 16834 (PT
4610), 16835 (PT 4611), 16836 dan 16837, Taman Melawati, Mukim Setapak, Daerah Gombak, Selangor Darul Ehsan.
TABLEOFCONTENTS
Section
PageNo
1.0
INTRODUCTION
2.0
STUDYOBJECTIVE
3.0
THESTUDYAREA
4.0
EXISTINGTRAFFICCONDITIONS
4.1
RoadandJunctionInventory
4.2
ExistingTrafficVolume
4.3
AnalysisofSurveyData
4.4
PerformanceofExistingRoad
ASSESSMENTOFFUTURETRAFFICSCENARIO
22
5.1
NonSite(Base)Traffic
22
5.2
DevelopmentTrafficForecast
25
5.3
TripsDistributionandAssignmentModel
25
5.4
TrafficPerformanceAssessment
28
5.5
10YearTrafficForecast(2026)
5.0
6.0
35
THEPROPOSEDDEVELOPMENT
17
5.1
SiteLocation
17
5.2
ProposedAccess
17
5.3
DevelopmentComponent
19
5.4
ProjectedTrafficGenerationPatterns
19
RECOMMENDATIONS
43
7.1
43
46
7.0
8.0
Title
UponCompletion(Year2016)
CONCLUSION
TRAFFIC IMPACT ASSESSMENT for Permohonan Pelan Kebenaran Merancang bagi Pindaan Pelan Lulus
Pembangunan Perumahan (Kondominium) kepada Perumahan Bercampur di atas Lot 16833 (PT 4609), 16834 (PT
4610), 16835 (PT 4611), 16836 dan 16837, Taman Melawati, Mukim Setapak, Daerah Gombak, Selangor Darul Ehsan.
LISTOFFIGURES
Figure3.1:
LocationPlan
Figure4.1:
StationSurveys
Figure4.2:
ExistingTrafficVolumeforAM&PMPeakinYear2011
Figure4.3:
OverallJunctionPerformanceinYear2011
Figure5.1:
AccessPoints
Figure5.2:
TripGeneration
Figure6.1:
FutureTrafficVolumeofStudyArea&AdjacentDevelopmentforAM&PM
PeakYear2016
Figure6.2:
TrafficDistributionincludingtheProposedDevelopment&Adjacent
DevelopmentYear2016
Figure6.3:
OverallJunctionPerformanceinYear2016
Figure6.4:
OverallJunctionPerformanceinYear2026
TRAFFIC IMPACT ASSESSMENT for Permohonan Pelan Kebenaran Merancang bagi Pindaan Pelan Lulus
Pembangunan Perumahan (Kondominium) kepada Perumahan Bercampur di atas Lot 16833 (PT 4609), 16834 (PT
4610), 16835 (PT 4611), 16836 dan 16837, Taman Melawati, Mukim Setapak, Daerah Gombak, Selangor Darul Ehsan.
LISTOFTABLES
Table4.1:
ConversionFactorstoPCU
Table4.2:
LevelofServiceandVolume/CapacityRatioCorrelation
Table4.3:
J1AnalysisAM&PMPeakcurrentyear2011
Table4.4:
J2AnalysisAM&PMPeakcurrentyear2011
Table4.5:
J3AnalysisAM&PMPeakcurrentyear2011
Table4.6:
J4AnalysisAM&PMPeakcurrentyear2011
Table4.7:
J5AnalysisAM&PMPeakcurrentyear2011
Table4.8:
J6AnalysisAM&PMPeakcurrentyear2011
Table5.1:
DevelopmentUnits
Table5.2:
TheAdoptedTripGenerationRates
Table5.3:
ProjectedTrafficGenerationPatternsfromProposedDevelopment
Table6.1:
TripGeneratedbyAdjacentDevelopment
Table6.2:
TripGeneratedbyProposedDevelopment
Table6.3:
MidBlockPerformanceAnalysisforAMandPMPeakHour
Table6.4:
ProposedTripDistributionforNorthernAccess
Table6.5:
ProposedTripDistributionforSouthernAccess
Table6.6:
J1AnalysisAM&PMPeakFutureYear2016With&WithoutDevelopment
Table6.7:
J2AnalysisAM&PMPeakFutureYear2016With&WithoutDevelopment
Table6.8:
J3AnalysisAM&PMPeakFutureYear2016With&WithoutDevelopment
Table6.9:
J4AnalysisAM&PMPeakFutureYear2016With&WithoutDevelopment
Table6.10:
J5AnalysisAM&PMPeakFutureYear2016With&WithoutDevelopment
Table6.11:
J6AnalysisAM&PMPeakFutureYear2016With&WithoutDevelopment
Table6.12:
Completion10YearsTrafficVolumeProjectionatJ1
Table6.13:
Completion10YearsTrafficVolumeProjectionatJ2
Table6.14:
Completion10YearsTrafficVolumeProjectionatJ3
Table6.15:
Completion10YearsTrafficVolumeProjectionatJ4
Table6.16:
Completion10YearsTrafficVolumeProjectionatJ5
Table6.17:
Completion10YearsTrafficVolumeProjectionatJ6
Table7.1:
J4PerformanceAnalysisWith&WithoutImprovementYear2016
Table7.2:
ProposedSignalPhasingattheJ4SignalisedJunctionYear2016
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
1.0
2011
INTRODUCTION
The proposed development is located on Lot 1683 (PT 4609), 16834 (PT 4610), 16835 (PT
4611),16836and16837,TamanMelawati,MukimSetapak,DaerahGombak,SelangorDarul
Ehsan.Thisareaisproposedtobedevelopedintoahighincomeresidentialarea.Adjacent
landuseactivitiesareresidentialareaswithinTamanMelawatiandinstitutionssuchasSJKT
TamanMelawati,SMKTamanMelawati,SKTamanMelawati2andInternationalSchoolof
KualaLumpur.
This study report will form a supporting document in the developers submission for
approval.
2.0
STUDYOBJECTIVE
Themainobjectiveofthisstudyistoexaminetheimpactoftheproposeddevelopmenton
the road network within the vicinity of the development and to determine if the roadway
andjunctionlayoutcancopewiththefuturetrafficdemand.
3.0
THESTUDYAREA
ThestudyareaislocatedwithintheresidentialareaofTamanMelawatiandisborderedby
Jalan Taman Melawati. The area is accessible from the Middle Ring Road (MRRII) via Jalan
Taman Melawati. Existing landmarks located near to the site are the International School
locatedtothesouthwestandKClublocatedtothesoutheast.Thelocationoftheproposed
developmentisshowninFigure3.1.
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
2011
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
4.0
2011
EXISTINGTRAFFICCONDITIONS
Assessmentoftheexistingtrafficconditionsforthesurroundingroadnetworkinthevicinity
of the development site was ascertained through visual reconnaissance surveys as well as
conducting traffic count surveys. In addition, road inventory was also carried out to
determinethecharacteristicsoftheexistingroadsandjunctionsinthestudyarea.Thesewill
providebothaquantitativeandqualitativemeasuresoftheexistingtrafficconditionsaswell
asunderstandingofthepresenttrafficpatternandcharacteristics.
4.1
RoadandJunctionInventory
Site reconnaissance was conducted to determine the access points to the proposed
development. An inventory of the existing characteristics of the roads/junctions such as
lanes,trafficcirculation,junctioncontrolandlayoutwasalsodeveloped.
Therearetwoexistingaccesspointtowardsthedevelopmentfromthenorthandsouth.The
northernaccessisviaJalanG2whereasthesouthernaccessisviaJalanG1.
The proposed development is planned to gain access via both the northern and southern
accesspoints.
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
4.2
2011
ExistingTrafficVolume
A Manual Classified Count (MCC) was carried out to determine the existing traffic flow
patternsandtheperiodofpeakhoursontheexistingroadsandjunctionsinthevicinityof
thedevelopment.
Thetrafficcountsurveywasconductedon26thJuly2011from6.30am9.30amforAMpeak
and4.30pm7.30pmforPMpeak.Thetrafficsurveywasconductedmanuallyat15minutes
intervalsandwasclassifiedintothefollowingfivevehiclecategories:
i)
Car,taxiandprivateVans;
ii) Motorcycles;
iii) Lighttrucks(2axle);
iv) Heavytrucks;and
v) Buses.
ThetrafficsurveylocationsareshowninFigure4.1.Detailsofsurveylocationsareasfollows:
J1(Roundabout)JalanMelawati4JalanTamanMelawati(BukitEmasRoundabout)
J2(PriorityJunction)JalanMelawati4JalanG2
J3(Roundabout)JalanMelawati4JalanTamanMelawati(JadeHillsRoundabout)
J4(PriorityJunction)JalanTamanMelawatiJalanMelawati1
J5(PriorityJunction)JalanMelawati1JalanG1
J6(PriorityJunction)JalanMelawati1JalanTamanMelawati
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
2011
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
4.3
2011
AnalysisofSurveyData
Priortoanalyzingthetrafficdatacollectedfromthetrafficsurveys,allcountedvehicleswere
converted into passenger car unit (pcu) to account for the varying vehicular composition.
The factors used in converting the various classes of vehicles to passenger units were
adoptedfromtheTripGenerationManualbyMalaysiaHighwayPlanningUnit(HPU,2010)
andareshowninTable4.1
Table4.1:ConversionFactorstoPCU
TypeofVehicles
EquivalentValueinPCU
Motorcycle
Car
LightTruck
HeavyTruck
Bus
0.33
1.00
1.75
2.25
2.25
The findings of traffic surveys provide information not only on the vehicular turning
movementpatternsbutalsothetotaltrafficdemandsofeachconnectingroadlink.
Basedonthetrafficcounts,thepeakhourswasdeterminedwhichisfrom6.45am7.45am
forAMpeakand6.15pm7.15pmforPMpeak.Figure4.2showsthetrafficvolumeinthe
vicinityofstudyareaduringAM&PMpeak.
4.4
PerformanceofExistingRoad
Theoperationalperformanceofaroad,usuallymeasuredintermofvolumetocapacity(v/c)
ratio,isameasureofoccupancyofaparticularroadsection.Performanceanalysisiscarried
outfortheexistingroadleadingintothedevelopmentsite.
Table4.2indicatestherelationofLOSandV/Cratiosaswellastheirdefinitionsintermsof
urban road performance that are adopted in this study. (Source: Transportation Research
Board,HighwayCapacityManual,MinistryofWorks,Malaysia)
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
2011
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
2011
Table4.2:LevelofServiceandVolume/CapacityRatioCorrelation
LOS
V/CRatio
0.00to0.60
0.61to0.70
0.71to0.80
0.81to0.90
0.91to1.00
Morethan1
TrafficSituation
Freeflowwithlowvolumes,densitiesandhighspeeds.
Drivercanmaintaintheirdesiredspeedswithlittleorno
delay.
Stableflow.Operatingspeedsbeginningtoberestricted
somewhatbytrafficconditions.Someslightdelay.
Stableflow.Speedsandmaneuverabilityaremoreclosely
controlledbyhighervolumes.Acceptabledelay.
Approachingunstableflow.Tolerableoperatingspeeds
whichareconsiderablyaffectedbyoperatingconditions.
Tolerabledelay.
Unstableflow.Yetloweroperatingspeedsandperhaps
stoppagesofmomentaryduration.Volumesatornear
capacityandintolerabledelay.
Forcedflow.Speedsandvolumecandroptozero.
Stoppagecanoccurforlongperiods.Queuesofvehicles
backingupfromarestrictiondownstream.
The operational performances of the junctions were assessed using aaSIDRA. aaSIDRA is a
traffic engineering software developed by Akcelik & Associates as an aid to junction
performanceanalysis.
The performances of J1 until J6 were assessed and the results are summarized in Table 4.3
untilTable4.8.
J1isoperatingatLOSAintheAMpeakandPMpeak.IntheAMPeak,theapproachfrom
Jalan Taman Melawati (North) has the highest delay with an average queue of 9m. This is
because the heavy traffic from the west has to give way to a higher conflicting movement
circulatingtheroundabout.InthePMpeak,theapproachfromJalanH1(West)hasanaverage
queueof39m.J1junctionperformanceissummarizedinTable4.3.
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
2011
Table4.3:J1AnalysisAM&PMPeakcurrentyear2011
J1_AM 2011
Roundabout
----------------------------------------------------------------Mov
Mov
Total Total
Deg.
Aver.
LOS Longest Queue
ID
Typ
Flow
Cap.
of
Delay
95% Back
(veh
(veh
Satn
(vehs) (m)
/h)
/h)
(v/c) (sec)
----------------------------------------------------------------South: J6
1 L
39
608
0.064
5.4
A
0.1
0
2 T
246
989
0.249
4.3
A
0.8
4
3 R
170
684
0.249
11.4
A
0.8
4
----------------------------------------------------------------East: J2
4 L
200
1126
0.178
7.6
A
1.0
5
5 T
28
315
0.089
6.0
A
0.4
2
6 R
54
607
0.089
13.1
A
0.4
2
----------------------------------------------------------------North: Jalan Tmn Melawati
7 L
41
107
0.383
6.9
A
1.8
9
8 T
337
877
0.384
5.9
A
1.8
9
9 R
42
109
0.385*
12.8
A
1.8
9
----------------------------------------------------------------West: Jln H1
10 L
26
76
0.342
6.2
A
1.2
6
11 T
55
161
0.342
5.2
A
1.2
6
12 R
324
948
0.342
12.1
A
1.2
6
----------------------------------------------------------------ALL VEHICLES:
1562
0.385
A
1.8
9
----------------------------------------------------------------J1_PM 2011
Roundabout
----------------------------------------------------------------Mov
Mov
Total Total
Deg.
Aver.
LOS Longest Queue
ID
Typ
Flow
Cap.
of
Delay
95% Back
(veh
(veh
Satn
(vehs) (m)
/h)
/h)
(v/c) (sec)
----------------------------------------------------------------South: J6
1 L
46
328
0.140
6.3
A
0.5
2
2 T
559
1026
0.545
6.0
A
4.1
21
3 R
222
407
0.545
13.2
A
4.1
21
----------------------------------------------------------------East: J2
4 L
200
1071
0.187
6.3
A
0.7
4
5 T
215
638
0.337
5.0
A
1.9
10
6 R
220
652
0.337
12.1
A
1.9
10
----------------------------------------------------------------North: Jalan Tmn Melawati
7 L
26
53
0.491
9.6
A
4.1
21
8 T
284
574
0.495
8.7
A
4.1
21
9 R
81
164
0.494
15.5
A
4.1
21
-----------------------------------------------------------------
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
2011
West: Jln H1
10 L
9
12
0.750*
13.0
B
7.7
39
11 T
556
761
0.731
12.0
B
7.7
39
12 R
36
49
0.735
18.9
B
7.7
39
----------------------------------------------------------------ALL VEHICLES:
2454
0.750
B
7.7
39
-----------------------------------------------------------------
Basedonthejunctionperformanceanalysis,J2isoperatingwithintheavailablecapacitywith
LOSAduringbothpeakhours.Table4.4showsdetailsofJ2junctionperformance.
Table4.4:J2AnalysisAM&PMPeakCurrentYear2011
J2_AM
Give-Way Sign Controlled Intersection
----------------------------------------------------------------Mov
Mov
Total Total
Deg.
Aver.
LOS Longest Queue
ID
Typ
Flow
Cap.
of
Delay
95% Back
(veh
(veh
Satn
(vehs) (m)
/h)
/h)
(v/c) (sec)
----------------------------------------------------------------South: development
1 L
17
559
0.030
9.4
A
0.0
0
3 R
8
263
0.030
9.5
A
0.0
0
----------------------------------------------------------------East: J3
4 L
14
54
0.259*
8.2
A
0.0
0
5 T
1117
4343
0.257
0.0
A
0.0
0
----------------------------------------------------------------West: J1
11 T
214
4311
0.050
0.6
A
0.2
1
12 R
2
40
0.050
9.5
A
0.2
1
----------------------------------------------------------------ALL VEHICLES:
1372
0.259
0.4
NA
0.2
1
----------------------------------------------------------------J2_PM
----------------------------------------------------------------Mov
Mov
Total Total
Deg.
Aver.
LOS Longest Queue
ID
Typ
Flow
Cap.
of
Delay
95% Back
(veh
(veh
Satn
(vehs) (m)
/h)
/h)
(v/c) (sec)
----------------------------------------------------------------South: development
1 L
12
551
0.022
9.3
A
0.0
0
3 R
6
276
0.022
9.5
A
0.0
0
----------------------------------------------------------------East: J3
4 L
12
51
0.235*
8.2
A
0.0
0
5 T
1014
4346
0.233
0.0
A
0.0
0
----------------------------------------------------------------West: J1
11 T
429
4175
0.103
0.5
A
0.4
2
12 R
11
107
0.103
9.4
A
0.4
2
----------------------------------------------------------------ALL VEHICLES:
1484
0.235
0.4
NA
0.4
2
10
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
2011
ResultinTable4.5showsJ3isoperatingwithinacceptableLOS,LOSAforAMandPMpeak.
Asshownfromtheanalysis,thesouthernmovementexperiencesthehighestdelayduring
bothpeakhours.Thisisprimarilybecauseofthehighertrafficvolumecomingfromthesouth.
Table4.5:J3AM&PMPeakCurrentYear2011
J3_AM 2011
Roundabout
----------------------------------------------------------------Mov
Mov
Total Total
Deg.
Aver.
LOS Longest Queue
ID
Typ
Flow
Cap.
of
Delay
95% Back
(veh
(veh
Satn
(vehs) (m)
/h)
/h)
(v/c) (sec)
----------------------------------------------------------------South: J4
1 L
514
2050
0.251*
7.2
A
3.1
16
2 T
164
1329
0.123
6.0
A
1.5
7
3 R
89
721
0.123
13.4
A
1.5
7
----------------------------------------------------------------East: others new development
4 L
116
1239
0.094
8.4
A
1.3
6
5 T
58
619
0.094
6.7
A
1.3
6
6 R
178
1858
0.096
14.1
A
1.3
7
----------------------------------------------------------------North: jln tmn melawati
7 L
5
22
0.227
5.7
A
2.1
11
8 T
128
551
0.232
4.7
A
2.1
11
9 R
588
2531
0.232
11.5
A
2.1
11
----------------------------------------------------------------West: J2
10 L
28
909
0.031
6.2
A
0.3
2
11 T
56
1818
0.031
5.0
A
0.3
2
12 R
132
2727
0.048
11.9
A
0.5
3
----------------------------------------------------------------ALL VEHICLES:
2056
0.251
A
3.1
16
----------------------------------------------------------------J3_PM 2011
Roundabout
----------------------------------------------------------------Mov
Mov
Total Total
Deg.
Aver.
LOS Longest Queue
ID
Typ
Flow
Cap.
of
Delay
95% Back
(veh
(veh
Satn
(vehs) (m)
/h)
/h)
(v/c) (sec)
----------------------------------------------------------------South: J4
1 L
473
2174
0.218*
6.5
A
2.7
14
2 T
121
1020
0.119
5.4
A
1.5
7
3 R
137
1155
0.119
12.8
A
1.5
7
----------------------------------------------------------------East: others new development
4 L
107
1145
0.093
9.3
A
1.3
7
5 T
62
663
0.094
7.6
A
1.3
7
6 R
134
1434
0.093
14.9
A
1.3
7
11
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
2011
EventhoughthereisatrafficlightsignalatJunctionJ4,thesignalisnotoperational.Assuch,
thejunctionisassessedasapriorityjunctionandtheresultoftheassessmentissummarized
inTable4.6.
Table4.6:J4AM&PMPeakCurrentYear2011
J4_AM
Give-Way Sign Controlled Intersection
----------------------------------------------------------------Mov
Mov
Total Total
Deg.
Aver.
LOS Longest Queue
ID
Typ
Flow
Cap.
of
Delay
95% Back
(veh
(veh
Satn
(vehs) (m)
/h)
/h)
(v/c) (sec)
----------------------------------------------------------------South: MRR2
1 L (Slp)
200
2200
0.091
7.6
A
0.0
0
2 T
703
4400
0.160
0.0
A
0.0
0
----------------------------------------------------------------North: J3
8 T
972
4128
0.235
0.0
A
0.0
0
9 R
61
259
0.236*
8.2
A
0.0
0
----------------------------------------------------------------West: J5
10 L
137
1167
0.117
8.2
A
0.0
0
12 R
299
2547
0.117
8.0
A
0.0
0
----------------------------------------------------------------ALL VEHICLES:
2372
0.236
NA
0.0
0
--------------------------------------------------------------------------------------------------------------------------------West: Jln Melawati 3
10 L
90
717
0.126
8.8
A
0.1
1
12 R
135
1075
0.126
8.8
A
0.1
1
----------------------------------------------------------------ALL VEHICLES:
1239
0.187
2.8
NA
0.1
1
-----------------------------------------------------------------
12
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
2011
J4_PM
Give-Way Sign Controlled Intersection
----------------------------------------------------------------Mov
Mov
Total Total
Deg.
Aver.
LOS Longest Queue
ID
Typ
Flow
Cap.
of
Delay
95% Back
(veh
(veh
Satn
(vehs) (m)
/h)
/h)
(v/c) (sec)
----------------------------------------------------------------South: MRR2
1 L (Slp)
156
2200
0.071
7.6
A
0.0
0
2 T
416
4400
0.095
0.0
A
0.0
0
----------------------------------------------------------------North: J3
8 T
411
4077
0.101*
0.0
A
0.0
0
9 R
31
308
0.101*
8.2
A
0.0
0
----------------------------------------------------------------West: J5
10 L
90
1857
0.048
8.2
A
0.0
0
12 R
35
1857
0.019
8.0
A
0.0
0
----------------------------------------------------------------ALL VEHICLES:
1139
0.101
NA
0.0
0
-----------------------------------------------------------------
The junction analysis conducted shows that J5 is operating within acceptable capacity with
LOS A during AM and PM peak. The movement from the East has the longest queue
comparatively,whichis3mand7mintheAMandPMpeakrespectively.Table4.7showsthe
junctionanalysisforJ5.
Table4.7:J5AM&PMPeakCurrentYear2011
J5_AM 2011
Give-Way Sign Controlled Intersection
----------------------------------------------------------------Mov
Mov
Total Total
Deg.
Aver.
LOS Longest Queue
ID
Typ
Flow
Cap.
of
Delay
95% Back
(veh
(veh
Satn
(vehs) (m)
/h)
/h)
(v/c) (sec)
----------------------------------------------------------------East: J5
5 T
273
4129
0.066*
0.4
A
0.6
3
6 R
21
318
0.066*
9.2
A
0.6
3
----------------------------------------------------------------North: J1
7 L
33
921
0.036
11.9
A
0.2
1
9 R
5
596
0.008
13.3
A
0.0
0
----------------------------------------------------------------West: J6
10 L
13
239
0.054
8.2
A
0.0
0
11 T
247
4549
0.054
0.0
A
0.0
0
----------------------------------------------------------------ALL VEHICLES:
592
0.066
NA
0.6
3
-----------------------------------------------------------------
13
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
2011
J5_PM 2011
Give-Way Sign Controlled Intersection
----------------------------------------------------------------Mov
Mov
Total Total
Deg.
Aver.
LOS Longest Queue
ID
Typ
Flow
Cap.
of
Delay
95% Back
(veh
(veh
Satn
(vehs) (m)
/h)
/h)
(v/c) (sec)
----------------------------------------------------------------East: J5
5 T
613
4376
0.140*
0.4
A
1.4
7
6 R
29
207
0.140*
9.2
A
1.4
7
----------------------------------------------------------------North: J1
7 L
18
960
0.019
11.7
A
0.1
0
9 R
1
341
0.003
18.4
A
0.0
0
----------------------------------------------------------------West: J6
10 L
1
22
0.045
8.2
A
0.0
0
11 T
216
4777
0.045
0.0
A
0.0
0
----------------------------------------------------------------ALL VEHICLES:
878
0.140
NA
1.4
7
-----------------------------------------------------------------
Fromtheanalysisconducted,J6isalsooperatingwithinacceptablecapacitywithLOSAand
LOSBduringbothpeakperiods.Table4.8tabulatestheresultsofJ6junctionanalysis.
Table4.8:J6AM&PMPeakCurrentYear2011
J6_AM 2011
Give-Way Sign Controlled Intersection
----------------------------------------------------------------Mov
Mov
Total Total
Deg.
Aver.
LOS Longest Queue
ID
Typ
Flow
Cap.
of
Delay
95% Back
(veh
(veh
Satn
(vehs) (m)
/h)
/h)
(v/c) (sec)
----------------------------------------------------------------South: MRR2
2 T
642
2200
0.292*
0.0
A
0.0
0
3 R
162
815
0.199
11.6
A
0.1
1
----------------------------------------------------------------East: J5
4 L
245
1221
0.201
8.8
A
0.3
2
6 R
21
1211
0.017
8.7
A
0.0
0
----------------------------------------------------------------North: J1
7 L
111
663
0.167
8.2
A
0.0
0
8 T
620
3704
0.167
0.0
A
0.0
0
----------------------------------------------------------------ALL VEHICLES:
1801
0.292
NA
0.3
2
-----------------------------------------------------------------
14
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
2011
J6_PM 2011
Give-Way Sign Controlled Intersection
----------------------------------------------------------------Mov
Mov
Total Total
Deg.
Aver.
LOS Longest Queue
ID
Typ
Flow
Cap.
of
Delay
95% Back
(veh
(veh
Satn
(vehs) (m)
/h)
/h)
(v/c) (sec)
----------------------------------------------------------------South: MRR2
2 T
488
2200
0.222
0.0
A
0.0
0
3 R
212
834
0.254
11.5
A
0.2
1
----------------------------------------------------------------East: J5
4 L
528
1306
0.404*
8.8
A
1.0
5
6 R
60
1274
0.047
8.6
A
0.1
0
----------------------------------------------------------------North: J1
7 L
85
766
0.111
8.2
A
0.0
0
8 T
399
3596
0.111
0.0
A
0.0
0
----------------------------------------------------------------ALL VEHICLES:
1772
0.404
NA
1.0
5
-----------------------------------------------------------------
Figure4.3showstheexistingoveralljunctionperformanceinthevicinityofstudyarea.
15
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
2011
16
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
5.0
THEPROPOSEDDEVELOPMENT
5.1
SiteLocation
2011
The proposed development is located on Lot 16833 (PT 4609), 16834 (PT 4610), 16835 (PT
4611),16836dan16837,TamanMelawati.Theproposedsiteiscurrentlyanemptylandandit
isplannedtobedevelopedinyear2012andcompletedinyear2016.
5.2ProposedAccess
Theproposeddevelopmentisaccessibleviatwo(2)newaccesses:
a) viaJalanG2(NorthenAccess)
JalanG2currentlyservedtheinternaltrafficforTamanMelawati.Thisroadwillallow
trafficfromJalanMelawati4towardstheproposeddevelopment.
b) viaJalanG1(SouthernAccess)
ThissouthernaccessconnectsJalanMelawati3towardstheproposeddevelopment.
ThisroadcurrentlyoperatesasapriorityTJunction.
ThelayoutforboththenorthernandsouthernaccessesisshowninFigure5.1.
17
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
2011
18
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
5.3
2011
DevelopmentComponent
The development site covers an area of about 42.24 acres (300,999.6 ft2) and will be
developedasahighincomeresidentialarea.Asummaryofthedevelopmentcomponentsis
showninTable5.1.
Table5.1:DevelopmentUnits
LanduseActivity
Units
StrataLink/TerraceLink
DetachedHouse
Condominium
TOTAL
22
116
72
210
5.4
TheProjectedTrafficGenerationPatterns
The future traffic generation patterns of the development upon its full completion and
operation are projected based on the traffic generation rates of the Traffic Generation
ManualdevelopedbytheHighwayPlanningUnit(HPU)ofMinistryofWorks,2010.
In this TIA report, the future traffic generation pattern of the development component is
calculatedfortheAMandPMpeakperiodstoprovideaworstcasescenarioforassessment.
TherelevanttrafficgenerationratesadoptedforthisstudyarelistedinTable5.2.
19
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
2011
Table5.2:AdoptedTripGenerationRates
Vehicle
Trips
PCU
Conversion
%Inbound
%Outbound
TerraceLink/Townhouse
AMPeak
0.78
0.89
0.29
0.71
PMPeak
0.76
0.85
0.60
0.40
LandUsage
Flat/Apartment/Condominium
AMPeak
0.48
0.91
0.27
0.73
PMPeak
0.45
0.88
0.63
0.37
SemiD/DetachedHouse
AMPeak
1.51
0.96
0.35
0.65
1.54
0.92
0.53
0.47
PMPeak
TheprojectedtrafficgenerationpatternofthedevelopmentissummarizedinTable5.3.It
representstheultimateortheworstfuturedevelopmentscenario,inwhichalldevelopment
componentsarefullyoccupied.
Table5.3:ProjectedTrafficGenerationfromProposedDevelopment
VehicleTrips
PCUTrips
Inbound
(PCU)
Outbound
(PCU)
AMPeak
17
15
11
PMPeak
16
15
DetachedHouse
AMPeak
175
168
59
109
PMPeak
178
164
87
77
Condominium
AMPeak
34
31
23
PMPeak
32
29
18
11
Total
Total
AMPeak
72
143
114
93
LandUsage
TerraceLink
PMPeak
Figure5.2showsthetrafficattractedandgeneratedbytheproposeddevelopment.
20
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
21
2011
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
6.0
2011
ASSESSMENTOFFUTURETRAFFICSCENARIO
Thefuturetrafficisdividedintotwotrafficcomponentsasdescribedbelow:
i)
the nonsite comprising traffic passing through the roads in the vicinity of the
projectsiteand,
ii)
siterelatedtrafficcomprisingtrafficgeneratedbyandattractedtotheproposed
developmentsite.
Thetrafficforecastfocusesontwocriticalhoursofthedayi.e.morningpeakandevening
peakhours.Itisexpectedthatonatypicalweekdaythehighesttrafficvolumesarerecorded
during these hours. Thus, the performances of road and junction are tested based on this
criticalconditionanddesign/improvementsofroad/junctionscanbemadeaccordingly.
Inforecastingthefuturetraffic,itisnecessarytodeterminethedesignyeartobeadopted.
In this traffic study, it is expected that the proposed development will be fully completed
and occupied by year 2016. A 10year traffic projection (i.e.: 2026) is also forecasted to
determinetheoperationsofthesurroundingroadnetwork.
6.1
NonSite(Base)Traffic
Thebasetrafficiscalculatedbyapplyingatrafficgrowthrateontotheexistingflowsupto
the design year when the proposed development is fully completed and occupied. The
adoptedannualtrafficgrowthwithinthestudyareais3%asthesurroundingdevelopmentis
alreadydeveloped.
Apart from this traffic growth, adjacent confirmed residential developments are also
included as the future traffic volume. When completed and occupied, these new
developments are expected to further contribute to the traffic volume on Jalan Taman
Melawati.ThetripgenerationsofthesedevelopmentsaretabulatedinTable6.1.
22
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
2011
Table6.1:TripsGeneratedbyadjacentnewresidentialdevelopment
Developers
(adjacentdevelopments
completedbefore
proposeddevelopment
comesinbyYear2016)
Contours
DsaraResidencesSdn
Bhd
20TreesWest
SDBPropertiesSdnBhd
SunwayRydgeway
SunwayDevelopment
Bhd
TripGeneration(PCU)
Landuse
Components
Area
(Units)
Bungalow
Peak
Inbound
Outbound
Total
41
am
pm
21
31
39
27
59
58
Detached
House
48
am
pm
24
36
45
32
70
68
Detached
House
Semi
Detached
40
30
am
pm
36
53
66
47
101
99
Note:NoconfirmedcompletiondateisavailablefordevelopersKLHMelawatiandIdoliteCorporation.
Thesedevelopmentsareassumedtobecompletedafteryear2016andassuchareexcludedfromthis
trafficstudy
Figure 6.1 shows the future traffic volume in the vicinity of study area. The above
assumptions present the worst future traffic scenario of the development site and its
immediatesurroundings.
23
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
24
2011
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
6.2
2011
DevelopmentTrafficForecast
The trips forecast for the proposed land use is generated according to the trip rates
describedinSection5andissummarisedinTable6.2.
Table6.2:FuturetripsbyproposeddevelopmentAM&PMpeak
FutureTripsGeneration(PCU)
AMPeak
PMPeak
Inbound
Outbound
Inbound
Outbound
Landuse
Component
Units
DetachedHouse
116
11
Condominium
72
59
109
87
77
TerraceLink
22
23
18
11
TOTAL
215
207
Thedevelopmentisexpectedtogenerateandattract215pcuintheAMpeakand207pcuin
thePMpeak.
6.3
TripsDistributionandAssignmentModel
Theproposeddevelopmentisaccessiblefromvia2junctions:
i)
Fromthenorthernjunction(JalanG2)
ii) Fromthesouthernjunction(JalanG1)
From the analysis of current traffic flow pattern, the traffic distributions for the trip
generatedbytheproposeddevelopmentareassumedtobeasfollows:
Table6.3:ProposedTripDistributionforproposeddevelopment
Ingress(%)
Egress(%)
NorthernAccess
50
50
SouthernAccess
50
50
Total
100
100
Of this equal distribution, the trip distribution for the northern and southern access is
furthertabulateinTable6.4andTable6.5.
25
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
2011
Table6.4:ProposedTripDistributionforNorthernAccess
Direction
Ingress(%)
Egress(%)
AMPeak
PMPeak
AMPeak
PMPeak
West
14
48
58
58
East
86
52
42
42
Table6.5:ProposedTripDistributionforSouthernAccess
Direction
Egress(%)
Ingress(%)
AMPeak
PMPeak
AMPeak
PMPeak
West
38
15
65
East
62
97
85
35
Figures 6.2 show the overall traffic volume after distribution for AM & PM peak with
development.
26
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
27
2011
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
6.4
2011
TrafficPerformanceAssessment
Table6.6:J1AnalysisFutureYear2016WithandWithoutDevelopment
WithoutDevelopment
Approaches
AMPEAK
PMPEAK
WithDevelopment
AMPEAK
ApproachfromJ6(South)
PMPEAK
PCU/hour
558
977
568
1031
Volume/Capacity
0.31
0.30
0.31
0.67
Delay(second)
7.3
7.2
7.4
8.6
L.O.S.
AveQueueLength(meter)
20
33
PCU/hour
327
622
435
698
Volume/Capacity
0.23
0.20
0.34
0.39
Delay(second)
9.4
10.3
9.4
10.6
L.O.S.
AveQueueLength(meter)
15
12
15
PCU/hour
487
453
487
448
Volume/Capacity
0.49
0.23
0.49
0.54
Delay(second)
8.0
8.1
8.1
10.2
L.O.S.
AveQueueLength(meter)
16
17
17
23
PCU/hour
470
465
470
465
Volume/Capacity
0.41
0.33
0.42
0.72
Delay(second)
11.2
14.1
11.3
21.9
L.O.S.
AveQueueLength(meter)
22
40
ApproachfromJ2(East)
ApproachfromJalanTmnMelawati
(North)
ApproachfromJalanH1(West)
OverallRoundaboutPerformance
28
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
2011
In year 2016, the analysis of J1 shows that the overall performance of the roundabout
without the development is operating at LOS A during AM and PM peak. With the
completion of the proposed development, the overall performance of J1 is at a LOS of A
during AM peak LOS B during PM peak. This is because the traffic generated by the
proposeddevelopmentislowatJ1roundabout.
Table6.7showsthejunctionperformanceanalysisforJ2inYear2016.Basedontheresult,
theapproachfromwestexperiencesalongestqueuelengthi.e1mand3mwithLOSofA
during AM and PM peak respectively. With the completion of the proposed development,
thisapproachwillstillperformwithintheavailablecapacitywiththelongestqueuelengthof
1mand3mduringtheAMandPMpeak.
Table6.7:J2PerformanceAnalysisYear2016WithandWithoutDevelopment
WithoutDevelopment
Approaches
AMPEAK
PMPEAK
WithDevelopment
AMPEAK
Approachfromthedevelopment(South)
PMPEAK
29
21
172
114
Volume/Capacity
0.04
0.03
0.24
0.16
Delay(second)
9.8
9.7
10.4
10.2
L.O.S.
AveQueueLength(meter)
PCU/hour
1336
1211
1398
1270
Volume/Capacity
0.30
0.28
0.32
0.29
Delay(second)
0.1
0.1
0.5
0.5
L.O.S.
AveQueueLength(meter)
PCU/hour
250
510
260
564
Volume/Capacity
0.06
0.12
0.06
0.15
Delay(second)
0.9
0.9
1.2
1.7
L.O.S.
0A
AveQueueLength(meter)
OverallPriorityTJunctionPerformance
PCU/hour
ApproachfromJ3(East)
ApproachfromJ1(West)
29
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
2011
Table 6.8 tabulates the junction performance of J3 comparing with and without the
developmentrespectively.TheanalysisshowsthattheroundaboutwilloperateatLevelof
Services (LOS) of A during AM and PM peak. It is expected that J3 roundabout will be
heavilyutilizedbythenewadjacentdevelopmentasJ3roundaboutwillbethemainaccess
roadtowardstheirdevelopment.
Table6.8:J3AnalysisFutureYear2016WithandWithoutDevelopment
WithoutDevelopment
Approaches
AMPEAK
PMPEAK
WithDevelopment
AMPEAK
ApproachfromJ4(South)
PMPEAK
PCU/hour
938
944
1000
1003
Volume/Capacity
0.38
0.31
0.42
0.35
Delay(second)
9.7
9.2
9.7
9.1
L.O.S.
AveQueueLength(meter)
26
22
29
24
PCU/hour
558
457
558
457
Volume/Capacity
0.19
0.19
0.19
0.19
Delay(second)
12.5
13.7
12.5
13.7
L.O.S.
AveQueueLength(meter)
14
15
14
15
PCU/hour
835
649
1022
871
Volume/Capacity
0.29
0.31
0.42
0.51
Delay(second)
10.5
12.6
10.8
13.9
L.O.S.
AveQueueLength(meter)
15
20
23
36
PCU/hour
280
529
368
704
Volume/Capacity
0.07
0.20
0.11
0.31
Delay(second)
9.6
11.7
10.5
12.5
L.O.S.
AveQueueLength(meter)
13
23
OverallRoundaboutPerformance
ApproachfromAdjacentNew
Development(East)
ApproachfromJlnTamanMelawati
(North)
ApproachfromJ2(West)
30
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
2011
Table6.9showsthejunctionperformanceofJ4inYear2016.Byyear2016,J4isoperatingat
lowest capacity with the lowest LOS of F during AM peak. The approach from west
experiencesthelongestqueuelengthof913mduringAMpeak.Withthecompletionofthe
development,thejunctionperformanceforJ4willcontinuetobeatLOSFandAduring
theAMandPMpeakperiods,respectively.TheimprovementatJ4willdiscussedfurtheron
chapter7.
Table6.9:J4PerformanceAnalysisYear2016WithandWithoutDevelopment
WithoutDevelopment
Approaches
AMPEAK
PMPEAK
WithDevelopment
AMPEAK
ApproachfromMRR2(South)
PMPEAK
PCU/hour
1095
760
1201
929
Volume/Capacity
0.19
0.13
0.21
0.15
Delay(second)
1.6
1.8
1.7
2.4
L.O.S.
AveQueueLength(meter)
ApproachfromJ3(North)
PCU/hour
1247
550
1247
550
Volume/Capacity
0.46
0.13
0.49
0.18
Delay(second)
7.1
0.5
6.0
4.3
L.O.S.
AveQueueLength(meter)
40
33
PCU/hour
506
261
506
261
Volume/Capacity
2.56
0.07
2.7
0.37
Delay(second)
1463
8.1
1600
19.7
913
942
15
ApproachfromJalanMelawati3(West)
L.O.S.
AveQueueLength(meter)
OverallPriorityTJunctionPerformance
Fromtheanalysiscarriedout,J5willoperateatLOSAduringbothpeakperiodsevenwhen
the developmentis completedandoccupied.The junctionanalysisissummarizedinTable
6.10.
31
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
2011
Table6.10:J5PerformanceAnalysisYear2016WithandWithoutDevelopment
WithoutDevelopment
Approaches
AMPEAK
PMPEAK
WithDevelopment
AMPEAK
ApproachfromJ4(East)
PMPEAK
PCU/hour
340
745
388
862
Volume/Capacity
0.07
0.16
0.09
0.22
Delay(second)
1.1
0.9
2.0
2.0
L.O.S.
AveQueueLength(meter)
Approachfromthedevelopment(North)
44
22
194
120
Volume/Capacity
0.04
0.02
0.19
0.23
Delay(second)
12.4
12.2
12.8
17.9
L.O.S.
AveQueueLength(meter)
PCU/hour
301
251
329
255
Volume/Capacity
0.06
0.05
0.07
0.05
Delay(second)
0.4
1.1
0.2
L.O.S.
AveQueueLength(meter)
OverallPriorityTJunctionPerformance
PCU/hour
ApproachfromJ6(West)
Similarly, junction J6 will operate at LOS A during both peak periods even when the
proposed development is completed and occupied. The junction analysis is summarized in
Table6.11.
32
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
2011
Table6.11:J6PerformanceAnalysisYear2016WithandWithoutDevelopment
WithoutDevelopment
Approaches
AMPEAK
WithDevelopment
PMPEAK AMPEAK
ApproachfromJalanTmnMelawati(South)
PMPEAK
PCU/hour
963
830
1000
888
Volume/Capacity
0.35
0.30
0.36
0.306
Delay(second)
2.3
3.5
2.6
3.3
L.O.S.
AveQueueLength(meter)
PCU/hour
308
682
308
682
Volume/Capacity
0.24
0.48
0.24
0.48
Delay(second)
9.0
8.9
9.0
9.0
L.O.S.
AveQueueLength(meter)
PCU/hour
848
562
848
562
Volume/Capacity
0.19
0.13
0.19
0.13
Delay(second)
1.2
1.4
1.2
1.4
L.O.S.
AveQueueLength(meter)
OverallPriorityTJunctionPerformance
ApproachfromJ5(East)
ApproachfromJ1(North)
Figure6.3showstheoveralljunctionperformanceinthevicinityofstudyareainYear2016.
33
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
2011
34
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
6.5
2011
10yearTrafficForecast(2026)
Inordertodeterminetheroadnetworkperformancewithinaperiodof10years,atraffic
growth of 3% per annum is applied to the total traffic generated within the study area in
year 2016. This 10year traffic volume projection is summarized in Table 6.12 until Table
6.17.
Thejunctionanalysisconductedforyear2026indicatesthattheJ1willbeatLevelofservice
(LOS) C and D during the AM and PM peaks. Table 6.12 summarised the junction
performanceforJ1.
Table6.12:Completionand10yearsTrafficVolumeProjectionatJ1
UponCompletion2016
Approaches
AMPEAK
PMPEAK
Projection2026
AMPEAK
ApproachfromJ6(South)
PMPEAK
PCU/hour
598
1031
749
1362
Volume/Capacity
0.31
0.67
0.42
0.51
Delay(second)
7.4
8.6
7.4
8.3
L.O.S.
AveQueueLength(meter)
33
10
39
PCU/hour
435
698
547
913
Volume/Capacity
0.34
0.39
0.63
0.41
Delay(second)
9.4
10.6
17.7
13.8
L.O.S.
AveQueueLength(meter)
12
15
41
34
PCU/hour
487
448
651
603
Volume/Capacity
0.49
0.54
0.84
0.47
Delay(second)
8.1
10.2
19.7
11.5
L.O.S.
AveQueueLength(meter)
17
23
67
39
ApproachfromJ2(East)
ApproachfromJalanTmnMelawati
(North)
35
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
2011
Table6.12:Completionand10yearsTrafficVolumeProjectionatJ1(cont)
UponCompletion2016
Approaches
Projection2026
AMPEAK
PMPEAK
AMPEAK
PMPEAK
PCU/hour
470
465
632
624
Volume/Capacity
0.42
0.72
0.62
0.90
Delay(second)
11.3
21.9
13.6
82.6
L.O.S.
AveQueueLength(meter)
40
23
162
ApproachfromJalanH1(West)
OverallRoundaboutPerformance
Note:Nogrowthisadoptedtodevelopmenttrafficafterfullycompletionandoccupied.
Thejunctionanalysisconductedforyear2026indicatesthattheJ2willbeatLevelofservice
(LOS)AduringtheAMandPMpeaks.Table6.13summarisedthejunctionperformancefor
J2.
Table6.13:Completionand10yearsTrafficVolumeProjectionatJ2
UponCompletion2016
Approaches
AMPEAK
PMPEAK
Projection2026
AMPEAK
Approachfromthedevelopment(South)
PMPEAK
PCU/hour
172
114
182
122
Volume/Capacity
0.24
0.16
0.33
0.22
Delay(second)
10.4
10.2
12.1
11.8
L.O.S.
AveQueueLength(meter)
PCU/hour
1398
1270
1849
1679
Volume/Capacity
0.32
0.29
0.42
0.38
Delay(second)
0.5
0.5
0.4
0.4
L.O.S.
AveQueueLength(meter)
ApproachfromJ3(East)
36
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
2011
Table6.13:Completionand10yearsTrafficVolumeProjectionatJ2(cont)
UponCompletion2016
Approaches
Projection2026
AMPEAK
PMPEAK
AMPEAK
PMPEAK
PCU/hour
260
564
346
740
Volume/Capacity
0.06
0.15
0.09
0.20
Delay(second)
1.2
1.7
1.8
2.1
L.O.S.
AveQueueLength(meter)
ApproachfromJ1(West)
A
A
A
OverallPriorityTJunctionPerformance
Note:Nogrowthisadoptedtodevelopmenttrafficafterfullycompletionandoccupied.
Thejunctionanalysisconductedforyear2026indicatesthattheJ3willbeatLevelofservice
(LOS) C and B during the AM and PM peaks respectively. Table 6.14 summarised the
junctionperformanceforJ3.
Table6.14:Completionand10yearsTrafficVolumeProjectionatJ3
UponCompletion2016
Approaches
AMPEAK
PMPEAK
Projection2026
AMPEAK
ApproachfromJ4(South)
PMPEAK
PCU/hour
1000
1003
1271
1241
Volume/Capacity
0.42
0.35
0.88
0.71
Delay(second)
9.7
9.1
44.6
17.7
L.O.S.
AveQueueLength(meter)
29
24
182
82
PCU/hour
558
457
698
578
Volume/Capacity
0.19
0.19
0.44
0.57
Delay(second)
12.5
13.7
20.9
42.6
L.O.S.
AveQueueLength(meter)
14
15
23
57
ApproachfromAdjacentDevelopment
(East)
37
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
2011
Table6.14:Completionand10yearsTrafficVolumeProjectionatJ3(cont)
UponCompletion2016
Approaches
Projection2026
AMPEAK
PMPEAK
AMPEAK
PMPEAK
PCU/hour
835
649
1022
871
Volume/Capacity
0.29
0.31
0.42
0.51
Delay(second)
10.5
12.6
10.8
13.9
L.O.S.
AveQueueLength(meter)
15
20
23
36
PCU/hour
280
529
368
704
Volume/Capacity
0.07
0.20
0.11
0.31
Delay(second)
9.6
11.7
10.5
12.5
L.O.S.
AveQueueLength(meter)
13
23
ApproachfromJlnTamanMelawati
(North)
ApproachfromJ2(West)
A
A
C
B
OverallRoundaboutPerformance
Note:Nogrowthisadoptedtodevelopmenttrafficafterfullycompletionandoccupied.
Thejunctionanalysisconductedforyear2026indicatesthattheJ4willbeatLevelofservice
(LOS)FandLOSCduringtheAMandPMpeakrespectively.Table 6.15summarisedthe
junctionperformanceforJ4.Theimprovementatthisjunctionwilldiscussedfurtheronthe
nextchapter.
Table6.15:Completionand10yearsTrafficVolumeProjectionatJ4
UponCompletion2016
Approaches
AMPEAK
ApproachfromJalanTmnMelawati
(South)
PMPEAK
Projection2026
AMPEAK
PMPEAK
PCU/hour
1201
929
1561
1157
Volume/Capacity
0.21
0.15
0.27
0.18
Delay(second)
1.7
2.4
1.7
2.3
L.O.S.
AveQueueLength(meter)
38
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
2011
Table6.15:Completionand10yearsTrafficVolumeProjectionatJ4(cont)
UponCompletion2016
Approaches
Projection2026
AMPEAK
PMPEAK
AMPEAK
PMPEAK
PCU/hour
1247
550
1659
726
Volume/Capacity
0.49
0.18
1.14
0.27
Delay(second)
6.0
4.3
14.8
4.7
L.O.S.
AveQueueLength(meter)
33
107
21
PCU/hour
506
261
679
350
Volume/Capacity
2.7
0.37
4.4
0.71
1600
19.7
3178
36.8
942
15
1505
38
ApproachfromJ3(North)
ApproachfromJalanMelawati3(West)
Delay(second)
L.O.S.
AveQueueLength(meter)
F
A
F
OverallPriorityTJunctionPerformance
Note:Nogrowthisadoptedtodevelopmenttrafficafterfullycompletionandoccupied.
Thejunctionanalysisconductedforyear2026indicatesthattheJ5willbeatLevelofservice
(LOS)AduringtheAMandPMpeaks.Table6.16summarisedthejunctionperformancefor
J5.
Table6.16:Completionand10yearsTrafficVolumeProjectionatJ5
UponCompletion2016
Approaches
AMPEAK
PMPEAK
Projection2026
AMPEAK
ApproachfromJ4(East)
PMPEAK
PCU/hour
388
862
505
1117
Volume/Capacity
0.09
0.22
0.13
0.28
Delay(second)
2.0
2.0
2.0
2.0
L.O.S.
AveQueueLength(meter)
14
39
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
2011
Table6.16:Completionand10yearsTrafficVolumeProjectionatJ5(cont)
UponCompletion2016
Approaches
Projection2026
AMPEAK
PMPEAK
AMPEAK
PMPEAK
PCU/hour
194
120
210
118
Volume/Capacity
0.19
0.23
0.23
0.37
Delay(second)
12.8
17.9
13.7
25.2
L.O.S.
AveQueueLength(meter)
PCU/hour
329
255
433
342
Volume/Capacity
0.07
0.05
0.09
0.07
Delay(second)
1.1
0.2
0.9
0.1
L.O.S.
AveQueueLength(meter)
Approachfromthedevelopment(North)
ApproachfromJ6(West)
A
A
A
OverallPriorityTJunctionPerformance
Note:Nogrowthisadoptedtodevelopmenttrafficafterfullycompletionandoccupied.
Thejunctionanalysisconductedforyear2026indicatesthattheJ6willbeatLevelofservice
(LOS) A and B during the AM and PM peaks respectively. Table 6.17 summarised the
junctionperformanceforJ6.
Table6.17:Completionand10yearsTrafficVolumeProjectionatJ6
UponCompletion2016
Approaches
AMPEAK
ApproachfromJalanTmnMelawati
(South)
PMPEAK
Projection2026
AMPEAK
PMPEAK
PCU/hour
1000
888
1321
1167
Volume/Capacity
0.36
0.306
0.47
0.45
Delay(second)
2.6
3.3
2.7
3.6
L.O.S.
AveQueueLength(meter)
40
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
2011
Table6.17:Completionand10yearsTrafficVolumeProjectionatJ6(cont)
UponCompletion2016
Approaches
Projection2026
AMPEAK
PMPEAK
AMPEAK
PMPEAK
PCU/hour
308
682
415
916
Volume/Capacity
0.24
0.48
0.36
0.67
Delay(second)
9.0
9.0
9.5
9.7
L.O.S.
AveQueueLength(meter)
15
PCU/hour
848
562
1139
754
Volume/Capacity
0.19
0.13
0.26
0.17
Delay(second)
1.2
1.4
1.2
1.4
L.O.S.
AveQueueLength(meter)
ApproachfromJ5(East)
ApproachfromJ1(North)
A
A
A
OverallPriorityTJunctionPerformance
Note:Nogrowthisadoptedtodevelopmenttrafficafterfullycompletionandoccupied.
Figure6.4showsthejunctionperformanceforyear2026.
41
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
2011
42
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
7.0
RECOMMENDATIONS
7.1
UponCompletion(Year2016)
7.1.1
2011
ConversionofPriorityConfigurationtoSignalisedConfigurationatJ4
Fromthisanalysis,inyear2016,theJ4priorityTjunctionisexpectedtooperateata
LOSFduringAMpeak.EventhoughthereisatrafficlightsignalatJunctionJ4,the
signalisnotoperational.Assuch,thejunctionisassessedasapriorityconfiguration
junction Hence it is recommended that this junction is upgraded to a signalized
configurationjunctionbyturnonbacktheexistingsignallight.
Tables7.1summarizetheresultsofthejunctionanalysisforbothAMPeakandPM
Peak and provides a comparison for year 2026 priority and signalized junction
configuration.
Table7.1:J4PerformanceAnalysisWith&WithoutImprovementYear2016
Without
Improvement
(priorityjunction)
2016
Approaches
AM
PEAK
ApproachfromMRR2
(South)
PM
PEAK
With
Improvement
(signalizedjunction)
2016
AM
PEAK
PM
PEAK
With
Improvement
(signalizedjunction)
2026
AM
PEAK
PMPEAK
PCU/hour
1201
929
1201
929
1561
1157
Volume/Capacity
0.21
0.15
0.70
0.38
0.93
0.49
Delay(second)
1.7
2.4
40.0
26.9
58.5
28.9
L.O.S.
AveQueueLength
(meter)
148
88
248
0.6
PCU/hour
1247
550
1247
550
1659
726
Volume/Capacity
0.49
0.18
0.70
0.38
0.93
0.50
Delay(second)
6.0
4.3
39.5
40.9
60.7
42.9
L.O.S.
AveQueueLength
(meter)
33
191
85
341
113
ApproachfromJ3
(North)
43
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
2011
Table7.1:J4PerformanceAnalysisWith&WithoutImprovementYear2016(cont)
Without
Improvement
(priorityjunction)
2016
Approaches
With
Improvement
(signalizedjunction)
2016
With
Improvement
(signalizedjunction)
2026
AM
PEAK
PM
PEAK
AM
PEAK
PM
PEAK
AM
PEAK
PM
PEAK
PCU/hour
506
261
506
261
679
350
Volume/Capacity
2.7
0.37
0.71
0.38
0.91
0.49
1600
19.7
69.7
65.7
88.1
66.3
942
15
129
70
199
91
ApproachfromJ5(West)
Delay(second)
L.O.S.
AveQueueLength
(meter)
OverallPriorityT
JunctionPerformance
The proposed signal phasing at the junction during AM and PM peak are listed in
Table7.2below:
Table7.2:ProposedSignalPhasingattheJ4SignalisedJunctionYear2016
ProposedPhasing
ProposedTiming(AM)
ProposedTiming(PM)
GreenTime=61sec
PhaseTime=66sec
GreenTime=50sec
PhaseTime=55sec
44
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
2011
GreenTime=44sec
PhaseTime=49sec
GreenTime=56sec
PhaseTime=61sec
GreenTime=30sec
PhaseTime=35sec
GreenTime=29sec
PhaseTime=34sec
45
TRAFFICIMPACTASSESSMENTforPermohonanPelanKebenaranMerancangbagiPindaan
PelanLulusPembangunanPerumahan(Kondominium)kepadaPerumahanBercampurdi
atasLot16833(PT4609),16834(PT4610),16835(PT4611),16836dan16837,Taman
Melawati,MukimSetapak,DaerahGombak,SelangorDarulEhsan.
8.0
2011
CONCLUSION
Basedonthetrafficimpactassessmentcarriedout,theproposeddevelopmentisexpected
togenerateandattract215pcuintheAMpeakand207pcuinthePMpeak.Theproposed
development is expected to gain access from the Northern Access via Jalan G2 as well as
fromtheSouthernAccessviaJalanG1.
Upon completion of the development in year 2016, adjacent junctions are expected to
operate within the available capacity with the lowest LOS of F at Junction 4 in the peak
period. Bear in mind, J4S failure is also contributed by trips generated from adjacent
development that expected to be completed before the proposed development is fully
occupiedinYear2016.
Oncealltheplanneddevelopmentsmatureinyear2016,J4isexpectedtooperateatLOSF
and A during AM & PM peak periods. To improve this junction, it is recommended to be
upgraded to a signalized controlled junction by turn on back the existing signal light for
bettermanagethetrafficflow.
46