Sie sind auf Seite 1von 11

Sl No

Description of Item

Unit

Qty

Rate

Amount

All Contractors temporarty Site office Facilities 1 including all furnitures LS All Engineers temporary Site office Facilities 2 including all furnitures

200,000.00

LS

240,000.00

All Power for the works including all maintenance works till the completion of 3 the projecty LS 4 Temporary Fence Works LS Temporary Roads and Car Parking Facilities for the 4 Contractor and Engineer LS All Design and Engineering Charges for ATC Civil Scope 5 of works LS All Site Investigation and topographical survey 6 reports LS 7 Construction Programme LS

1 1

150,000.00 30,000.00

50,000.00

300,000.00

1 1

50,000.00 25,000.00

All HSE and PPE Charges for 8 adhering to safety norms LS All Post survey and As built 9 works 10 All Crane and other charges All cleaning and 11 demobilization charges 12 Total Amount-Qrs

250,000.00 50,000.00 1,200,000.00 35,000.00 2,580,000.00

Subject:Civil Scope List for 40MIGD SWRO Desalination Plant at RLIC SLNO Description of Item DAF Building -PreEngineered SteelStructure Shed(Total Area 80m L x51.2mW x7.6m Height 1 above the Ground) RCC Substructure works with all Concrete Protection works upto Ground Slab with Power Float Finish AllBlock works at the Periphery Walls upto 3.5mheight and the balance height with Al/Giwall Cladding works) All Roof Cladding with Al/GIRoof Cladding works Rate Qty Unit Amount-Qrs

LS

(i)

LS

(ii) (iii)

LS LS

1 No

6,250,000.00

(iv)

Allfinishing works including plaster paint ,Wooden /Steel and Aluminium Works) LS Flash Mixing Tank in RCC (8m x8mx5mHeight inRCC) DAF Flocculation Tank in RCC (8.5m x8.3mx7mHeight inRCC) DAF Flocculation Tank in RCC (8.5m x14.6mx7mHeight inRCC)

1a.

LS

1 No

480,000.00

1b.

LS

16 No

9,877,000.00

1c.

LS

16 No

17,374,000.00

1d. 1e.

RCC Intermediate Tank(Above Ground)-4.8m x51.2m x7m Height LS DAF Air Compressor onRCC Foundation/Base-3.5mx1.5m LS UF Building-SteelStructure Shed(TotalArea-60.6m 2 x51.2mx7.6mH Above Ground) RCC Substructure works with all Concrete Protection works upto Ground Slab with Power Float Finish

1 No 2 No

2,494,464.00 50,000.00

LS

(i)

LS

(ii)

AllBlock works at the Periphery Walls upto 3.5mheight and the balance height with Al/Giwall Cladding works) All Roof Cladding with Al/GIRoof Cladding works

LS

(iii)

LS

1 No

4,980,000.00

(iv) 2a.

2b.

Allfinishing works including plaster paint ,Wooden /Steel and Aluminium Works) LS RCC Plinth for the Ultra Filtration Skids(7.5m x2.5m) LS RCC Backwash Tank above Ground (15m x15mx5mHeight inRCC) LS RCC Plinth/Foundation for the UF Backflush Pumps(3.6mx1.4m) LS RCC Plinth/Foundation for the Self Cleaning Filters -1.5m Diameter LS US FeedPumps on RCC Foundation/Plinths (2.8m x1.1m) LS RCC Plinth/Foundation for the Polymer Dosing Sets -5m Diameter LS RCC Plinth/Foundation for the Sodium HydrochloriteDosing Sets1.6mDiameter LS RCC Plinth/Foundation for the Sodium Hydroxide Dosing Sets1.6mDiameter LS RCC Plinth/Foundation for the Hydrochloric acid Dosing Sets1.6mDiameter LS RCC Plinth/Foundation for the Acid Unloading Pumps-(2m x1.2m) LS Acid Storage HorizontalTank on RCC Saddle/Base (4.4m Diameter) LS RCC Plinth/Foundation for the Caustic Unloading Pumps-(2m x1.2m) LS Caustic Storage HorizontalTank on RCC Saddle/Base (4.6m Diameter) LS

30 No

420,000.00

1 No

1,406,250.00

2c.

3 No

26,000.00

2d.

2 No

15,000.00

2e.

17 No

101,745.00

2f.

1 No

20,606.25

2g.

1 No

5,000.00

2h.

1 No

5,000.00

2i.

1 No

5,000.00

2j.

2 No

19,000.00

2k.

1 No

23,400.00

2l.

2 No

15,840.00

2m.

1 No

25,000.00

2n.

RCC Plinth/Foundation for the Coagulant Unloading Pumps-(2m x1.2m)

LS

2 No

16,000.00

2o.

Caogulant Storage HorizontalTank on RCC Saddle/Base (5mDiameter) LS ROSkid Building -SteelStructure Shed(TotalArea-88m 3 x41mx7.6mH Above Ground) RCC Substructure works with all Concrete Protection works upto Ground Slab with Power Float Finish AllBlock works at the Periphery Walls upto 3.5mheight and the balance height with Al/Giwall Cladding works) All Roof Cladding with Al/GIRoof Cladding works Allfinishing works including plaster paint ,Wooden /Steel and Aluminium Works) ROPass Skids (1)on RCC Plinth(7.75m x8.5m) ROPass Skids (2)on RCC Plinth(7.75m x8.5m) RCC Plinth for ROFlushingTanks above Ground(12m x12m) RCC Plinth for ROFlushingpumps (3.6m x1.4m) RCC Plinth for Service Water pumps (3.6m x1.4m) RCC Plinth for Sodium Bisulphate Dosing Sets (6.2m Diameter) RCC Plinth for Antiscalant Dosing Sets (1.6m Diameter) RCC Plinth for SodiumHydroxide Dosing Sets (2.2m Diameter) RCC Plinth for hydro Chloric acid Dosing Sets (3.4m Diameter) RCC Plinth for RO Cleaning Tanks (5m Diameter)

1 No

25,000.00

(i)

LS

(ii) (iii)

LS LS

1 No

5,592,400.00

(iv) 3a. 3b.

LS LS LS 12 No 4 No 654,075.00 218,075.00

3c.

LS

1 No

120,000.00

3d. 3e.

LS LS

2 No 2 No

16,560.00 16,560.00

3f. 3g.

LS LS

1 No 1 No

49,000.00 9,500.00

3h.

LS

1 No

12,213.00

3i. 3j.

LS LS

1 No 1 No

17,310.00 27,000.00

3k.

RCC Plinth for RO Cleaning Pumps(2.8m x1.1m) RCC Plinth for RO Cleaning Cartdride Filters(1.5m diameter)

LS

2 No

25,080.00

3l.

LS

2 No

6,000.00

4 4a. 4b. 4c.

6 7

7a. 7b. 7c. 7d. 7e. 7f. 7g.

RCC ROPump Room&ElectricalBuilding.TotalDi mensions-(88m x12m x5mHeight above Ground +88m L x12m W x5mHeightabove Ground) RCC Plinth for RO Pass1High pressure pump(5m x1.5m ) RCC Plinth for PX Booster Pumps (3m x1.5m) RCC Plinth for RO Pass2High pressure pump(5m x1.5m ) RCC LV Switch gear building Building.TotalDimensions-(30.5m m x17m x5mHeight above Ground RCC MV Switch gear building Building.TotalDimensions-(30.5m m x17m x5mHeight above Ground Remineralization Open Plot75mx65m Limestone Storage Yard Maximum 3.5mHeight (22.5mLength and closedon threesideswith an RCC Floor) Limestone Filter Base inRCC works(5m Diameter) Activated Carbon Filter Base inRCC works(1.6m Diameter) CO2 absorber vessels Base inRCC works(2.4 Diameter) Degasser Tank Base inRCC works(15m x15m) Limestone Backwash Base inRCC works(2.8m x1.1m) Limestone AirBlower Base inRCC works(3m x1.2m) Degassed Water Transfer Pump Base inRCC works(3.6m x1.4m) Sedimentation Tank Base inRCC works(10mDiameter)

LS LS LS LS

1 No 12 No 12 No 4 No

7,000,000 87,000.00 63,000.00 126,000.00

LS

1 No

1,711,050.00

LS

1 No

1,711,050.00

LS LS LS LS LS LS LS

1 No 8 No 2 No 2 No 1 No 2 No 2 No

290,000.00 247,000.00 12,000.00 19,000.00 168,750.00 11,300.00 13,000.00

7h. 7i.

LS LS

2 No 1 No

16,560.00 84,187.00

7j. 7k. 7l.

Backwash water recovery Tank Base inRCC works (8 mDiameter) Polymer Dosing set Base inRCC works(.6mDiameter) Sludge PumpBase inRCC works(1.2m x.75m)

LS LS LS

1 No 1 No 2 No

58,151.00 1,980.00 4,000.00

7m. 7n. 7o.

DualMedia Filter feedPumpBase inRCC works(1.2m x.75m) LS DualMedia filters on RCC Base (1.6mDiameter) LS Caustic Dosing Skids on RCC Base (2mDiameter) LS Admin building TotalDimensions(25m m x25m x4mHeight above 8 Ground Remineralization Plant 9 75mx65m Product Water Storage Tank Cylindricalabove Ground Maximum of18m (Maximum Limit permissibleinRLIC) Product Water Transfer Pumps base (4m x1.6) 10 Others Asphalt Works Operating Space in Interlock 8mmHeavy duty Grey Colour Grass andSweet soilworks plus fixing 23 no of medium size palm trees Guard room All externalDrainage including soakways andRoad Gully works Substationand ControlBuilding Site Fencing Works TOTAL-AMOUNT(QRS)

2 No 1 No 1 No

4,000.00 6,000.00 6,750.00

LS

1 No

1,875,000.00

9a 9b 10a 10b

LS LS LS LS

1 No 3 No 1 Item 1 Item

27,190,812.00 29,250.00 1,961,000.00 75,000.00

10c 10d

LS LS

1 Item 2 Nos

250,000.00 216,000.00

10d 10e 10f

LS LS LS

1 Item 1 Item 1 Item

390,000.00 3,840,000.00 680,000.00 98,545,918.25

Subject:Civil Scope List for 10MIGD SWRO Desalination Plant at RLIC SLNO Description of Item Rate Qty Unit DAF Building -PreEngineered SteelStructure Shed(Total Area 41m L x30mW x7.6m Height 1 above the Ground) LS RCC Substructure works with all Concrete Protection works upto Ground Slab with Power Float Finish (i) LS AllBlock works at the Periphery Walls upto 3.5mheight and the balance height with Al/Giwall Cladding works) All Roof Cladding with Al/GIRoof Cladding works Allfinishing works including plaster paint ,Wooden /Steel and Aluminium Works) Flash Mixing Tank in RCC (5m x3.6mx5mHeight inRCC) DAF Flocculation Tank in RCC (8.5m x8.3mx7mHeight inRCC) DAF Floating Tank in RCC (8.5m x14.6mx7mHeight inRCC) RCC Intermediate Tank(Above Ground)-2.8m x30m x7m Height DAF Air Compressor onRCC Foundation/Base-2.2mx1.0m UF Building-SteelStructure Shed(TotalArea-32.5m 2 x30mx7.6mH Above Ground) RCC Substructure works with all Concrete Protection works upto Ground Slab with Power Float Finish AllBlock works at the Periphery Walls upto 3.5mheight and the balance height with Al/Giwall Cladding works)

Amount-Qrs

(ii) (iii)

LS LS

1 No

2,350,000.00

(iv)

LS

1a.

LS

1 No

126,000.00

1b.

LS

4 No

2,568,020.00

1c.

LS

4 No

4,343,500.00

1d. 1e.

LS LS

1 No 2 No

764,400.00 9,600.00

LS

(i)

LS

(ii)

LS

(iii)

(iv) 2a.

2b.

All Roof Cladding with Al/GIRoof Cladding works Allfinishing works including plaster paint ,Wooden /Steel and Aluminium Works) RCC Plinth for the Ultra Filtration Skids(7.5m x2.5m) RCC Backwash Tank above Ground (6.5m x6.5mx5mHeight inRCC)

LS

1 No

1,650,000.00

LS LS 9 No 207,506.00

LS

1 No

57,037.00

2c.

RCC Plinth/Foundation for the UF Backflush Pumps(3.6mx1.4m) LS RCC Plinth/Foundation for the Self Cleaning Filters -.9m Diameter LS US FeedPumps on RCC Foundation/Plinths (2.8m x1.1m) LS RCC Plinth/Foundation for the Polymer Dosing Sets -5m Diameter LS RCC Plinth/Foundation for the Sodium HydrochloriteDosing Sets1.6mDiameter RCC Plinth/Foundation for the Sodium Hydroxide Dosing Sets1.6mDiameter RCC Plinth/Foundation for the Hydrochloric acid Dosing Sets1.6mDiameter RCC Plinth/Foundation for the Acid Unloading Pumps-(1.5m x1.0m) Acid Storage HorizontalTank on RCC Saddle/Base (3.6m Diameter) RCC Plinth/Foundation for the Caustic Unloading Pumps-(1.5m x1.0m)

3 No

26,000.00

2d.

1 No

2,000.00

2e.

5 No

29,925.00

2f.

1 No

20,606.25

2g.

LS

1 No

5,000.00

2h.

LS

1 No

5,000.00

2i.

LS

1 No

5,000.00

2j.

LS

2 No

8,000.00

2k.

LS

1 No

21,000.00

2l.

LS

2 No

8,000.00

2m.

Caustic Storage HorizontalTank on RCC Saddle/Base (2.8m Diameter) LS

1 No

21,000.00

2n.

RCC Plinth/Foundation for the Coagulant Unloading Pumps(1.5m x1.0m)

LS

2 No

8,000.00

2o.

Caogulant Storage HorizontalTank on RCC Saddle/Base (2.8mDiameter) LS ROSkid Building -SteelStructure Shed(TotalArea-65m 3 x18mx7.6mH Above Ground) RCC Substructure works with all Concrete Protection works upto Ground Slab with Power Float Finish AllBlock works at the Periphery Walls upto 3.5mheight and the balance height with Al/Giwall Cladding works) All Roof Cladding with Al/GIRoof Cladding works Allfinishing works including plaster paint ,Wooden /Steel and Aluminium Works) ROPass Skids (1)on RCC Plinth(7.75m x8.5m) ROPass Skids (2)on RCC Plinth(7.75m x2.5m) RCC Plinth for ROFlushingTanks above Ground(6.5m x6.5m) RCC Plinth for ROFlushingpumps (3.6m x1.4m) RCC Plinth for Service Water pumps (3.6m x1.4m)

1 No

14,000.00

(i)

LS

(ii) (iii)

LS LS

1 No

2,150,000.00

(iv) 3a. 3b.

LS LS LS 3 No 1 No 199,500.00 24,500.00

3c.

LS

1 No

38,000.00

3d. 3e.

LS LS

2 No 2 No

16,560.00 16,560.00

3f. 3g.

RCC Plinth for Sodium Bisulphate Dosing Sets (3.8m Diameter) LS RCC Plinth for Antiscalant Dosing Sets (1.6m Diameter) LS RCC Plinth for SodiumHydroxide Dosing Sets (1.6m Diameter)

1 No 1 No

21,000.00 9,500.00

3h.

LS

1 No

9,500.00

3i. 3j. 3k. 3l.

RCC Plinth for hydro Chloric acid Dosing Sets (1.6m Diameter) RCC Plinth for RO Cleaning Tanks (5m Diameter) RCC Plinth for RO Cleaning Pumps(2.8m x1.1m) RCC Plinth for RO Cleaning Filters(1.5m diameter) RO Pump room Building building. TotalDimensions-(42m x12m x5mHeight above Ground RCC Plinth for Pressure Pumps(5m x1.5) RCC Plinth for Booster Pumps(3m x1.5) RCC Plinth for 2mHigh PressurePumps(5m x1.5) RCC LV Switch gear building Building.TotalDimensions-(11.4 m x12m x5mHeight above Ground RCC MV Switch gear building Building.TotalDimensions-(11.4 m x12m x5mHeight above Ground Others Asphalt Works Operating Space in Interlock 8mmHeavy duty Grey Colour Grass andSweet soilworks plus fixing 23 no of medium size palm trees Guard room All externalDrainage including soakways andRoad Gully works Substationand ControlBuilding Site Fencing Works TOTAL-AMOUNT(QRS)

LS LS LS LS

1 No 1 No 2 No 2 No

9,500.00 27,000.00 25,080.00 6,000.00

4 4a 4b. 4c.

LS LS LS LS

1 No 1 No 3 No 1 No

1,612,800.00 12,000.00 18,000.00 12,000.00

LS

1 No

490,000.00

6 7 7a 7b

LS LS LS

1 No 1 Item 1 Item

490,000.00 EXCLUDED EXCLUDED

7c 7d

LS LS

1 Item 1 Nos

EXCLUDED EXCLUDED

7e 7f 7g

LS LS LS

1 Item 1 Item 1 Item

EXCLUDED EXCLUDED EXCLUDED 17,437,094.25

SL No

Description of Item 1 Preliminaries 2 10 MIGD Desalination Plant 3 40 MIGD Desalination Plant 4 TOTAL AMOUNT-QRS

Amount-Qrs 2,580,000.00 17,437,094.25 98,545,918.25 118,563,012.50