THERMAX LIMITED CUSTOMER: ARASMETA CAPTIVE POWER PLANT PROJECT: 43 MW CPP, ARASMETA

COGEN DIVISION

CONSULTANT:

DEVELOPMENT CONSULTANTS LTD, KOLKATA

BOILER DRIVE LOGIC & BOILER INTERLOCK LOGIC INDEX


SR NO.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

DESCRIPTION
BOILER FEED PUMP-1 BOILER FEED PUMP-2 BOILER FEED PUMP-3 LP DOSING PUMP-1 LP DOSING PUMP-2 LP DOSING AGITATOR HP DOSING PUMP-1 HP DOSING PUMP-2 HP DOSING PUMP-3 BOILER-1 ID FAN BOILER-2 ID FAN BOILER-2 FD FAN BOILER-2 FD FAN BOILER-1 PA FAN BOILER-2 PA FAN BOILER-1 DRAG CHAIN FDR-1 BOILER-1 DRAG CHAIN FDR-2 BOILER-1 DRAG CHAIN FDR-3 BOILER-1 DRAG CHAIN FDR-4 BOILER-2 DRAG CHAIN FDR-1 BOILER-2 DRAG CHAIN FDR-2 BOILER-2 DRAG CHAIN FDR-3 BOILER-2 DRAG CHAIN FDR-4 BLR-2 PA TO COMPARTMENT SOV

DRIVE TAG
10-M-003 10-M-004 10-M-005 10-M-010 10-M-011 10-M-012 10-M-021 10-M-022 10-M-023 11-M-100 12-M-100 11-M-200 12-M-200 11-M-300 12-M-300 11-M-401 11-M-402 11-M-403 11-M-404 12-M-401 12-M-402 12-M-403 12-M-404 11-UV-301-4

SR NO.
25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

DESCRIPTION
BFP-1 DISCHARGE MOV BFP-1 DISCHARGE MOV IBV BFP-2 DISCHARGE MOV BFP-2 DISCHARGE MOV IBV BFP-3 DISCHARGE MOV BFP-3 DICHARGE MOV IBV DEARATOR LEVEL CONT BYPASS MOV BLR-1 FLCV ISOLATION MOV BLR-1 FLCV ISO MOV IBV BLR-1 LLCV ISO MOV BLR-1 FW CONT STN BYP MOV BLR-1 ATTEMP CV ISO MOV BLR-1 MSSV MOV BLR-1 MSSV MOV IBV BLR-1 CBD MOV BLR-2 FLCV ISOLATION MOV BLR-2 FLCV ISO MOV IBV BLR-2 LLCV ISO MOV BLR-2 FW CONT STN BYP MOV BLR-2 ATTEMP CV ISO MOV BLR-2 MSSV MOV BLR-2 MSSV MOV IBV BLR-2 CBD MOV BLR-2 PA TO COMPARTMENT SOV

DRIVE TAG
10-XV-003A 10-XV-003B 10-XV-004A 10-XV-004B 10-XV-005A 10-XV-005B 10-XV-002 11-XV-600A 11-XV-600B 11-XV-600C 11-XV-601 11-XV-604 11-XV-605A 11-XV-605B 11-XV-550 12-XV-600A 12-XV-600B 12-XV-600C 12-XV-601 12-XV-604 12-XV-605A 12-XV-605B 12-XV-550 12-UV-301-4

1 0 REV NO.

21.9.2005 18.7.2005 DATE

FOR DCS ENGINEERING FOR DCS ENGINEERING PURPOSE REVISION HISTORY BY JB CHKD

JB JB APPD

TITLE :DRAWING NO.-

BOILER DRIVE LOGICS


PP 023 I 101 4 SHEET NO. 1 OF 25

THERMAX LIMITED CUSTOMER: ARASMETA CAPTIVE POWER CO. PVT. LTD PROJECT: 43 MW CPP

COGEN DIVISION

CONSULTANT: INTERLOCK & LOGIC SCHEMATICS SYMBOLS, NOTES AND LEGENDS

DEVELOPMENT CONSULTANTS PVT. LTD., KOLKATA

KEYBOARD SOFT COMMAND

A B A B A

&

"AND"

S R

SR FILP-FLOP

FIELD/MCC DEVICE INPUT

OR B

"OR" "NOT" "NO" "NC"

Q'
CLOSES ON ACTIVATION OPENS ON ACTIVATION

INPUT FROM LOCAL PANEL A OUTPUT CONTACT THROUGH INTERPOSING RELAY A DISPLAY ON CRT <X 2oo3 LOGIC FUNCTION BLOCK FOR 2/3 LOGIC >X FROM SHT. XX SIGNAL CROSS REF LIMIT VALUE MON < LOW (DIG O/P=1 WHEN ANALOGUE I/P < PRESET) LIMIT VALUE MON > HIGH (DIG O/P=1 WHEN ANALOGUE I/P >PRESET) MONOSHOT TO SHT XX SIGNAL CROSS REF B "OFF-DELAY" TIMER B "ON-DELAY" TIMER

ANALOGUE SIGNAL

SIGNAL

GRAPHICAL ATTRIBUTES ON SCREEN 1 MOTOR SYMBOL RED WHEN WHEN RUNNING/GREEN WHEN NOT RUNNING 2 MOTOR SYMBOL FLASHING RED WHEN THERMAL O/L/ TRIP/RUNTIME FAULT 3 MOTOR SYMBOL YELLOW WHEN START PERMISSIVE NOT AVAILABLE 4 MOV/BIRECTIONAL DRIVE TO FLASH YELLOW TILL END POSITION REACHED 5 MOV/BIRECTIONAL DRIVE TO FLASH RED ON TH OVERLOAD/TORQUE SWITCH ACTIVATION OUTPUT CONTACTS 1 "ON" & "UVOP" COMMANDS SHALL BE "NO" CONTACTS OF RELAYS 2 "LOC" CONTACTS SHALL BE "NC" CONTACTS OF RELAYS INPUTS ALL CONTACTS FOR AUTO STOP SHALL BE "NORMALLY CLOSED"

0 REV NO.

11/1/2005 DATE

FIRST ISSUE PURPOSE REVISION HISTORY BY

RS

JB CHKD

JB APPD

TITLE :DRAWING NO.-

BOILER DRIVE LOGIC


PP 023 I 101 4 SHEET NO. 2 OF 25

COGEN DIVISION THERMAX LIMITED CUSTOMER: ARASMETA CAPTIVE POWER PLANT CONSULTANT: DEVELOPMENT CONSULTANTS LTD., KOLKATA PROJECT: 43 MW INTERLOCK & LOGIC SCHEMATICS FOR UNI DIRECTIONAL DRIVES DCS/FIELD
MANUAL SEL START

DCS LOGIC & *


MAN START

MCC / UCP

DIGITAL OUTPUT TO MCC


REMOTE SEL AUTO SEL

& NC &
AUTO START

OR & S R NO

LOC Selected START Command

XX-LOC-YYY XX-ON-YYY

NO NO NC NO

AUTO START START PERM TRIP PROC. AUTO STOP

TDO = 2-10 sec

& &

OR

STOP NC
TRIP EQUIP

** TDO-5 SEC

S R
* TDO-5 SEC

&

DIGITAL INPUT FROM MCC XX-FBON-YYY

&

FBON RTS

STOP ERROR

NO NC

S
ON RUN TIME EROR RUNNING DRIVE NOT READY THERMAL OL * READY TO START & ** The STOP ERROR FF will reset when "reset" PB on drive pop-up is pressed The RUN TIME ERROR FF will reset when "reset" PB on drive pop-up is pressed NOTE:1 0 REV NO. 21.9.2005 11/1/2005 DATE SECOND ISSUE FIRST ISSUE PURPOSE REVISION HISTORY RS BY JB JB CHKD JB JB APPD SUB SYSTEM: DRAWING NO.OR

R
** XX-RTS-YYY

XX-TRP-YYY TH OL TRP NC

1- REFER NEXT SHEET FOR DETAILS OF PROCESS CONDITION AND RELATED TAGS. LOGIC FOR COAL FEEDERS (VFD) PP 023 I 101 4 SHEET NO. 3 OF 25

COGEN DIVISION THERMAX LIMITED CUSTOMER: ARASMETA CAPTIVE POWER PLANT CONSULTANT: DEVELOPMENT CONSULTANTS LTD., KOLKATA PROJECT: 43 MW INTERLOCK & LOGIC SCHEMATICS FOR UNI DIRECTIONAL DRIVES PROCESS CONDITIONS APPLICABLE FOR LOGIC SERVICE START PERM COAL FEEDER COMPARTMENT-1 COAL FEEDER COMPARTMENT-1 COAL FEEDER COMPARTMENT-1 COAL FEEDER COMPARTMENT-1 REF SHEET # REF SHEET # REF SHEET # REF SHEET #

DRIVE TAG 11-M-401 11-M-402 11-M-403 11-M404

AUTO STOP NA NA NA NA

AUTO START NA NA NA NA

TRIP (PROC.) REF SHEET # 05 REF SHEET # 05 REF SHEET # 05 REF SHEET # 05

RELATED TAG NOS. REFERENCE DRIVE TAG 11-M-401 11-M-402 11-M-403 11-M-404 DIGITAL INUPUT ON FEEDBACK 11-FBON-401 11-FBON-402 11-FBON-403 11-FBON-404 TH O/L 11-TRP-401 11-TRP-402 11-TRP-403 11-TRP-404 LSP OPRTD 11-RTS-401 11-RTS-402 11-RTS-403 11-RTS-404 LOC. SELECTION 11-LOC-401 11-LOC-402 11-LOC-403 11-LOC-404 11-ON-401 11-ON-402 11-ON-403 11-ON-404 DIGITALOUTPUT ON COMMAND OFF COMMAND

REMARKS / NOTES:-

1 0 REV NO.

21.9.2005 1.8.2005 DATE

SECOND ISSUE FIRST ISSUE PURPOSE REVISION HISTORY RS BY

JB JB CHKD

JB JB APPD SUB SYSTEM: DRAWING NO.LOGIC FOR COAL FEEDERS (VFD) PP 023 I 101 4 SHEET NO. 4 OF 25

BOILER DRIVE LOGICS


FEEDER START PERMISSIVE LOGIC DCS DRUM LEVEL LO LO
11-LALL-600

DCS LOGIC

FIELD

ID FAN FAN RUNNING


11-FBON-100

TRIP 11-M-401/402/403/404

AND

TO SHT 12

coal feeder

FD FAN RUNNING
11-FBON-200 PA FAN RUNNING 11-FBON-300

START PERM 11-M-401/402/403/404


AND

11-TAHH-YYY
SHT-06 BED TEMP HI HI AND

TO SHT 13

11-TALL-YYY
SHT-06 BED TEMP LO LO

DRIVE TAG 11-M-401 11-M-402 11-M-403 11-M-404

SERVICE DESCRIPTION BLR-1 COAL FEEDER-1 BLR-1 COAL FEEDER-2 BLR-1COAL FEEDER-3 BLR-1 COAL FEEDER-4 11-TAHH-YYY & 11-TALL-YYY YYY = 001 FOR 11-M-401 YYY = 002 FOR 11-M-402 YYY= 003 FOR 11-M-403 YYY= 004 FOR 11-M-404

XXX 401 402 403 404

YYY 001 002 003 004 COMPARTMENT-1 COMPARTMENT-2 COMPARTMENT-3 COMPARTMENT-4 ARASMETA CAPTIVE POWER CO. PVT. LTD REV 0 1 INTERLOCK AND LOGIC SCHEMATICS BOILER SECTION-COAL FEEDERS DWG NO. : PP O23 I 101 4 SHT 5 OF 25 REV NO. 1

BY

THERMAX CO-GEN DIVISION CHK APP DATE RS JB JB JB 4.8.2005 21.9.2005

BOILER DRIVE LOGICS


BED TEMPERATURE LOGIC DCS DCS LOGIC
COMP-1 BED TEMP LO-LO TO FEEDER 11-M-401

FIELD

or
COMP-1
11-TI-001B

sht-05
11-TALL-004

TRIP LOGIC

or
11-TI-001A

COMP-1 BED TEMP HI-HI

TO FEEDER 11-M-401

sht-05
COMP-2 BED TEMP LO-LO 11-TAHH-004

TRIP LOGIC

COMP-3
11-TI-002B

or
COMP-2 BED TEMP HI-HI

sht-05
11-TALL-003

TO FEEDER 11-M-402 TRIP LOGIC

or
11-TI-002A
COMP-3 BED TEMP LO-LO

sht-05
11-TAHH-003

TO FEEDER 11-M-402 TRIP LOGIC TO FDR 11-M-403

COMP-3
11-TI-003B

or or
COMP-3 BED TEMP HI HI

sht-05
11-TALL-002

sht-05 sht-05
11-TALL-001

TO FDR 11-M-403 TRIP LOGIC 11-TAHH-002 TO FDR 11-M-404 TRIP LOGIC

11-TI-003A
2/3 COMP-4 BED TEMP LO-LO

COMP-4
11-TI-004A 2/3 11-TI-004B 11-TI-004C
COMP-4 BED TEMP HI HI

sht-05
11-TAHH-001

TO FDR 11-M-404 TRIP LOGIC

DRIVE TAG

SERVICE DESCRIPTION TAHH S.P. = 980 DEG C TALL S.P. = 930 DEG C

ALL TEMP SET VALUES ARE SOFT SETTINGS FROM RTD INPUTS

THERMAX CO-GEN DIVISION BY RS CHK JB JB JB APP DATE 4.8.2005 21.9.2005 REV 0 1

ARASMETA CAPTIVE POWER CO. PVT. LTD. INTERLOCK AND LOGIC SCHEMATICS BOILER SECTION-COAL FEEDERS DWG NO. : PP O23 I 101 4 SHT 6 OF 25 REV NO. 1

COGEN DIVISION THERMAX LIMITED CUSTOMER: ARASMETA CAPTIVE POWER PLANT CONSULTANT: DEVELOPMENT CONSULTANTS LTD., KOLKATA PROJECT: 43 MW INTERLOCK & LOGIC SCHEMATICS FOR UNI DIRECTIONAL DRIVES DCS/FIELD
MANUAL SEL START

DCS LOGIC & *


MAN START

MCC / UCP

DIGITAL OUTPUT TO MCC


REMOTE SEL AUTO SEL

& NC &
AUTO START

OR & S R NO

LOC Selected START Command

XX-LOC-YYY XX-ON-YYY

NO NO NC NO

AUTO START START PERM TRIP PROC. AUTO STOP

TDO = 2-10 sec

& &

OR

STOP NC
TRIP EQUIP

** TDO-5 SEC

S R
* TDO-5 SEC

&

DIGITAL INPUT FROM MCC XX-FBON-YYY

&

FBON RTS

STOP ERROR

NO NC

S
ON RUN TIME EROR RUNNING DRIVE NOT READY THERMAL OL * ** The STOP ERROR FF will reset when "reset" PB on drive pop-up is pressed The RUN TIME ERROR FF will reset when "reset" PB on drive pop-up is pressed NOTE:1 0 REV NO. 21.9.2005 11/1/2005 DATE SECOND ISSUE FIRST ISSUE PURPOSE REVISION HISTORY BY RS JB JB CHKD JB JB APPD SUB SYSTEM: DRAWING NO.LOGIC FOR ID FAN (VFD) PP 023 I 101 4 SHEET NO. OR

R
** XX-RTS-YYY

XX-TRP-YYY TH OL NC

OF

25

COGEN DIVISION THERMAX LIMITED CUSTOMER: ARASMETA CAPTIVE POWER PLANT CONSULTANT: DEVELOPMENT CONSULTANTS LTD., KOLKATA PROJECT: 43 MW INTERLOCK & LOGIC SCHEMATICS FOR UNI DIRECTIONAL DRIVES PROCESS CONDITIONS APPLICABLE FOR LOGIC SERVICE START PERM ID FAN FOR BOILER-1 11-PAL-100* 11-ZSC-100 11-RTS-100

DRIVE TAG 11-M-100

AUTO STOP

AUTO START

TRIP (PROC.) 11-PALL-100

TRIP-EQPT

SAME LOGIC FOR BOILER-2 ID FAN 12-M-100

RELATED TAG NOS. REFERENCE DRIVE TAG 11-M-100 DIGITAL INPUT ON FEEDBACK 11-FBON-100 EQPT TRIP 11-TRP-100 RDY TO START 11-RTS-100 LOC. SELECTION 11-LOC-100 11-ON-100 DIGITALOUTPUT ON COMMAND OFF COMMAND PERMISSIVE 11-PER-100

REMARKS / NOTES:-

1 0 REV NO.

21.9.2005 1.8.2005 DATE

SECOND ISSUE FIRST ISSUE PURPOSE REVISION HISTORY RS BY

JB JB CHKD

JB JB APPD SUB SYSTEM: DRAWING NO.LOGIC FOR ID FAN (VFD) PP 023 I 101 4 SHEET NO. 8 OF 25

COGEN DIVISION THERMAX LIMITED CONSULTANT: CUSTOMER: DEVELOPMENT CONSULTANTS LTD. KOLKATA ARASMETA CAPTIVE POWER PLANT PROJECT: 43 MW CPP INTERLOCK & LOGIC SCHEMATICS FOR UNI DIRECTIONAL DRIVES DCS/FIELD
MANUAL SEL START

DCS LOGIC & *


MAN START

6.6 KV SWGR

READY TO START

0 = LOCAL SELECTED DIGITAL OUTPUT TO MCC

REMOTE SEL AUTO SEL

& NC &
AUTO START

OR & 0-08 Sec NO NO 0-08 Sec

LOC Selected START Command

XX-LOC-MYYY XX-ON-MYYY

NO NO NC NO

AUTO START START PERM TRIP PROC. AUTO STOP

TDO = 2-10 sec

STOP XX-OFF-MYYY Command

&

OR

1= STOP SIGNAL DIGITAL INPUT FROM SWGR

STOP
TRIP EQUIP.

** TDO- 5 SEC

S R
* TDO- 5 SEC

& XX-FBON-YYY &


TO FORCE OPEN OF DISCH MOV

NC

FBON

STOP ERROR

NO

S
ON RUN TIME EROR RUNNING NOT RUNNING THERMAL OL & READY TO START NOTE:1 0 REV NO. 21.9.2005 11/1/2005 DATE SECOND ISSUE FIRST ISSUE PURPOSE REVISION HISTORY BY RS JB JB CHKD * **

R
**

REFER SHEET NO.19

TDO-10SEC

XX-FBOF-YYY FBOF

NO

TO FORCE CLOSE DISCH MOV

XX-OL-YYY TH OL NC

The STOP ERROR FF will reset when "reset" PB on drive pop-up is pressed The RUN TIME ERROR FF will reset when "reset" PB on drive pop-up is pressed LSP OPRTD

NC

JB 1- REFER NEXT SHEET FOR DETAILS OF PROCESS CONDITION AND RELATED TAGS. JB APPD SUB SYSTEM: DRAWING NO.LOGIC FOR BOILER FEED PUMPS PP 023 I 101 4 SHEET NO. 9 OF 25

COGEN DIVISION THERMAX LIMITED CONSULTANT: CUSTOMER: DEVELOPMENT CONSULTANTS LTD. KOLKATA ARASMETA CAPTIVE POWER PLANT PROJECT: 43 MW CPP INTERLOCK & LOGIC SCHEMATICS FOR UNI DIRECTIONAL DRIVES PROCESS CONDITIONS APPLICABLE FOR LOGIC START PERM 10-ZIC-003A & 10-ZIO-003 10-ZIC-004A & 10-ZIO-004 10-ZIC-005A & 10ZIO-005

DRIVE TAG 10-M-003 10-M-004 10-M-005

SERVICE BOILER FEED PUMP-1 BOILER FEED PUMP-2 BOILER FEED PUMP-3

AUTO STOP NA NA NA

AUTO START 10-PAL-006 10-PAL-006 10-PAL-006

TRIP (PROC.) 10-LALL-002 10-LALL-002 10-LALL-002

TRIP (EQUIP) REFER SHT-2 REFER SHT-2 REFER SHT-2

The BFP is permitted to start only if the suction valve is open and the discharge valve is closed. During auto start, the stadby BFP is commanded to start when the discharge pressure falls and the corresonding discharge MOV is given a force open command

RELATED TAG NOS. REFERENCE DRIVE TAG 40-M-003 40-M-004 40-M-005 DIGITAL INPUT ON FEEDBACK 40-FBON-003 40-FBON-004 40-FBON-005 OFF FEEDBACK 40-FBOF-003 40-FBOF-004 40-FBOF-005 TH O/L 40-OL-003 40-OL-004 40-OL-005 LSP 10-LSP-003 10-LSP-004 10-LSP-005 LOC. SELECTION 40-LOC-003 40-LOC-004 40-LOC-005 DIGITAL OUTPUT ON COMMAND 40-ON-003 40-ON-004 40-ON-005 OFF COMMAND 40-OFF-003 40-OFF-004 40-OFF-005

1 0 REV NO.

21.9.2005 1.8.2005 DATE

SECOND ISSUE FIRST ISSUE PURPOSE REVISION HISTORY RS BY JB

JB JB CHKD

JB APPD SUB SYSTEM: DRAWING NO.LOGIC FOR BOILER FEED PUMPS PP 023 I 101 4 SHEET NO. 10 OF 25

COGEN DIVISION THERMAX LIMITED CONSULTANT: CUSTOMER: DEVELOPMENT CONSULTANTS LTD. KOLKATA ARASMETA CAPTIVE POWER PLANT PROJECT: 43 MW CPP INTERLOCK & LOGIC SCHEMATICS FOR UNI DIRECTIONAL DRIVES BFP START PERMISSIVE LOGIC DCS
BFP PUMP-X DE BRG TEMP

DCS LOGIC SP=85 DEG C

FIELD dearator level very low


10-LSLL103B

10-TI-XXXA& 10 TI 131A
BFP PUMP-X NDE BRG TEMP

NO

SP=85 DEG C
DEARATOR LEVEL V. LOW

10-TI-XXXB
BFP MTR-X DE BRG TEMP.

SP=110 DEG C

OR

TO SHT 3 TO TRIP

FIELD CONTACTS WILL BREAK WHEN LEVEL BECOMES VERY LOW.

10-TI-XXXC
BFP MTR-X NDE BRG TEMP.

SP=110 DEG C

10-TI-XXXD
BFP-X WDG TEMP-PH-R

SP=110 DEG C

OR

TO SHT3 START PERMISSIVE

10-TI-XXXE

BFP-X WDG TEMP-PH-R

SP=110 DEG C

10-TI-XXXF
BFP-X WDG TEMP-PH-Y

SP=110 DEG C

10-TI-XXXG
BFP-X WDG TEMP-PH-Y

SP=110 DEG C

COMP. (#)

10-TI-XXXH
BFP-X WDG TEMP-PH-B

SP=110 DEG C

10-TI-XXXI
BFP-X WDG TEMP-PH-B

SP=110 DEG C

# THIS BLOCK WILL BE USED IF ANY TWO OF THE SIX WINDING TEMP ARE HIGH, THEN PUMP SHOULD BE TRIPPED XXX003 FOR BFP-1 & 004 FOR BFP-2 & 005 FOR BFP-3 (RTD INPUTS) NOTE:-

10-TI-XXXJ

1 0 REV NO.

21.9.2005 1.8.2005 DATE

SECOND ISSUE FIRST ISSUE PURPOSE REVISION HISTORY BY RS

JB JB CHKD

JB JB APPD

1- REFER NEXT SHEET FOR DETAILS OF PROCESS CONDITION AND RELATED TAGS. SUB SYSTEM: DRAWING NO.LOGIC FOR BOILER FEED PUMPS PP 023 I 101 4 SHEET NO. 11 OF 25

COGEN DIVISION THERMAX LIMITED CUSTOMER: ARASMETA CAPATIVE POWER PLANT CONSULTANT: DEVELOPMENT CONSULTANTS LTD., KOLKATA PROJECT: 43 MW INTERLOCK & LOGIC SCHEMATICS FOR UNI DIRECTIONAL DRIVES DCS/FIELD
MANUAL SEL START

DCS LOGIC & *


MAN START

MCC / UCP

DIGITAL OUTPUT TO MCC


REMOTE SEL AUTO SEL

& NC &
AUTO START

OR & S R NO

LOC Selected START Command

XX-LOC-YYY XX-ON-YYY

NO NO NC NO

AUTO START START PERM TRIP PROC. AUTO STOP

TDO = 2-10 sec

& &

OR

STOP NC
TRIP EQUIP

** TDO-5 SEC

S R
* TDO-5 SEC

&

DIGITAL INPUT FROM MCC XX-FBON-YYY

&

FBON LSP OPRTD

STOP ERROR

NO NC

S
ON RUN TIME EROR RUNNING LSP OPERATED THERMAL OL * READY TO START & ** The STOP ERROR FF will reset when "reset" PB on drive pop-up is pressed The RUN TIME ERROR FF will reset when "reset" PB on drive pop-up is pressed NOTE:OR

R
**

XX-LSP-YYY

XX-OL-YYY TH OL NC

1- REFER NEXT SHEET FOR DETAILS OF PROCESS CONDITION AND RELATED TAGS. 0 REV NO. 11/1/2005 DATE FIRST ISSUE PURPOSE REVISION HISTORY BY RS JB CHKD JB APPD SUB SYSTEM: DRAWING NO.LOGIC FOR BOILER DOSING PUMPS AND AGITATOR PP 023 I 101 4 SHEET NO. 12 OF 25

COGEN DIVISION THERMAX LIMITED CUSTOMER: ARASMETA CAPATIVE POWER PLANT CONSULTANT: DEVELOPMENT CONSULTANTS LTD., KOLKATA PROJECT: 43 MW INTERLOCK & LOGIC SCHEMATICS FOR UNI DIRECTIONAL DRIVES PROCESS CONDITIONS APPLICABLE FOR LOGIC SERVICE START PERM LP DOSING PUMP-1 LP DOSING PUMP-2 LP DOSING AGITATOR HP DOSING PUMP-1 HP DOSING PUMP-2 HP DOSING PUMP-3 HP DOSING TANK AGITATOR 10-LSLL-012 10-LSLL-012 10-LSLLL-012 10-LSLL-020 10-LSLL-020 10-LSLL-020 10-LSLL-020

DRIVE TAG 10-M-010 10-M-011 10-M-012 10-M-021 10-M-022 10-M-023 10-M-020

AUTO STOP NA NA NA NA NA NA

AUTO START NA NA NA NA NA NA

TRIP (PROC.) 10-LSLL-012 10-LSLL-012 10-LSLL-012 10-LSLL-020 10-LSLL-020 10-LSLL-020

RELATED TAG NOS. REFERENCE DRIVE TAG 10-M-010 10-M-011 10-M-012 10-M-021 10-M-022 10-M-023 10-M-020 DIGITAL INUPUT ON FEEDBACK 10-FBON-010 10-FBON-011 10-FBON-012 10-FBON-021 10-FBON-022 10-FBON-023 10-FBON-020 TH O/L 10-OL-010 10-OL-011 10-OL-012 10-OL-021 10-OL-022 10-OL-023 10-OL-020 LSP OPRTD 10-LSP-010 10-LSP-011 10-LSP-012 10-LSP-021 10-LSP-022 10-LSP-023 10-LSP-020 LOC. SELECTION 10-LOC-010 10-LOC-011 10-LOC-012 10-LOC-021 10-LOC-022 10-LOC-023 10-LOC-020 10-ON-010 10-ON-011 10-ON-012 10-ON-021 10-ON-022 10-ON-023 10-ON-020 DIGITALOUTPUT ON COMMAND OFF COMMAND

REMARKS / NOTES:-

1 0 REV NO.

21.9.2005 1.8.2005 DATE

SECOND ISSUE RS PURPOSE REVISION HISTORY BY

JB JB CHKD

JB JB APPD SUB SYSTEM: DRAWING NO.LOGIC FOR BOILER DOSING PUMPS AND AGITATOR PP 023 I 101 4 SHEET NO. 13 OF 25

COGEN DIVISION THERMAX LIMITED CUSTOMER: ARASMETA CAPATIVE POWER PLANT CONSULTANT: DEVELOPMENT CONSULTANTS LTD., KOLKATA PROJECT: 43 MW INTERLOCK & LOGIC SCHEMATICS FOR UNI DIRECTIONAL DRIVES DCS/FIELD
MANUAL SEL START

DCS LOGIC & *


MAN START

MCC / UCP

DIGITAL OUTPUT TO MCC


REMOTE SEL AUTO SEL

& NC &
AUTO START

OR & S R NO

LOC Selected START Command

XX-LOC-YYY XX-ON-YYY

NO NO NC NO

AUTO START START PERM TRIP PROC. AUTO STOP

TDO = 2-10 sec

& &

OR

STOP NC
TRIP EQUIP

** TDO-5 SEC

S R
* TDO-5 SEC

&

DIGITAL INPUT FROM MCC XX-FBON-YYY

&

FBON LSP OPRTD

STOP ERROR

NO NC

S
ON RUN TIME EROR RUNNING LSP OPERATED THERMAL OL * ** The STOP ERROR FF will reset when "reset" PB on drive pop-up is pressed The RUN TIME ERROR FF will reset when "reset" PB on drive pop-up is pressed NOTE:1 0 REV NO. 21.9.2005 11/1/2005 DATE SECOND ISSUE FIRST ISSUE PURPOSE REVISION HISTORY BY RS JB JB CHKD JB JB APPD SUB SYSTEM: DRAWING NO.PP 023 I 101 4 LOGIC FOR PA FAN SHEET NO. OR

R
**

XX-LSP-YYY

XX-OL-YYY TH OL NC

14

OF

25

COGEN DIVISION THERMAX LIMITED CUSTOMER: ARASMETA CAPATIVE POWER PLANT CONSULTANT: DEVELOPMENT CONSULTANTS LTD., KOLKATA PROJECT: 43 MW INTERLOCK & LOGIC SCHEMATICS FOR UNI DIRECTIONAL DRIVES PROCESS CONDITIONS APPLICABLE FOR LOGIC SERVICE START PERM PA FAN FOR BOILER-1 11-FBON-100 11-FBON-200 11-ZSC-300

DRIVE TAG 11-M-300

AUTO STOP

AUTO START

TRIP (PROC.) 11-LALL-600*

SAME LOGIC FOR BOILER-2 PA FAN 12-M-300

RELATED TAG NOS. REFERENCE DRIVE TAG 11-M-300 DIGITAL INUPUT ON FEEDBACK 11-FBON-300 EQPT TRIP 11-OL-300 LSP OPRTD 11-LSP-300 LOC. SELECTION 11-LOC-300 11-ON-300 DIGITALOUTPUT ON COMMAND

REMARKS / NOTES:-

1 0 REV NO.

21,9,2005 1.8.2005 DATE

SECOND ISSUE RS PURPOSE REVISION HISTORY BY

JB JB CHKD

JB JB APPD SUB SYSTEM: DRAWING NO.PP 023 I 101 4 LOGIC FOR PA FAN SHEET NO. 15 OF 25

COGEN DIVISION THERMAX LIMITED CUSTOMER: CONSULTANT: ARASMETA CAPTIVE POWER PLANT DEVELOPMENT CONSULTANTS LTD. KOLKATA PROJECT: 43 MW CPP INTERLOCK & LOGIC SCHEMATICS FOR UNI DIRECTIONAL DRIVES DCS/FIELD
MANUAL SEL START

DCS LOGIC & *


MAN START

6.6 KV SWGR

READY TO START

0 = LOCAL SELECTED DIGITAL OUTPUT TO MCC

REMOTE SEL AUTO SEL

& NC &
AUTO START

OR & S R NO

LOC Selected START Command

XX-LOC-MYYY XX-ON-MYYY

NO NO NC NO

AUTO START START PERM TRIP PROC. AUTO STOP

TDO = 2-10 sec

&

OR

1= STOP SIGNAL DIGITAL INPUT FROM SWGR

STOP
TRIP EQUIP.

** TDO- 5 SEC

S R
* TDO- 5 SEC

& XX-FBON-YYY & FBON NO

NC

STOP ERROR

S
ON RUN TIME EROR RUNNING NOT RUNNING THERMAL OL & READY TO START NOTE:1 0 REV NO. 21.9.2005 11/1/2005 DATE SECOND ISSUE FIRST ISSUE PURPOSE REVISION HISTORY BY RS JB JB CHKD JB 1- REFER NEXT SHEET FOR DETAILS OF PROCESS CONDITION AND RELATED TAGS. JB APPD SUB SYSTEM: DRAWING NO.LOGIC FOR FORCED DRAFT FAN PP 023 I 101 4 SHEET NO. 16 OF 25 * ** The STOP ERROR FF will reset when "reset" PB on drive pop-up is pressed The RUN TIME ERROR FF will reset when "reset" PB on drive pop-up is pressed LSP OPRTD NC

R
** REFER SHEET NO XX-FBOF-YYY FBOF XX-OL-YYY TH OL NC NO

COGEN DIVISION THERMAX LIMITED CUSTOMER: CONSULTANT: ARASMETA CAPTIVE POWER PLANT DEVELOPMENT CONSULTANTS LTD. KOLKATA PROJECT: 43 MW CPP INTERLOCK & LOGIC SCHEMATICS FOR UNI DIRECTIONAL DRIVES PROCESS CONDITIONS APPLICABLE FOR LOGIC START PERM REF SHEET # 18

DRIVE TAG 11-M-200

SERVICE BOIER-1 FD FAN

AUTO STOP NA

AUTO START

TRIP (PROC.)

TRIP (EQUIP) REF SHT#

SAME LOGIC FOR BOILER-2 FD FAN 12-M-200

RELATED TAG NOS. REFERENCE DRIVE TAG 11-M-200 DIGITAL INPUT ON FEEDBACK 40-FBON-200 OFF FEEDBACK 40-FBOF-200 TH O/L 40-OL-200 LSP 10-LSP-200 LOC. SELECTION 40-LOC-200 DIGITAL OUTPUT ON COMMAND 40-ON-200 OFF COMMAND 40-OFF-200

1 0 REV NO.

21.9.2005 1.8.2005 DATE

SECOND ISSUE FIRST ISSUE PURPOSE REVISION HISTORY RS BY

JB JB CHKD

JB JB APPD SUB SYSTEM: DRAWING NO.PP 023 I 101 4 LOGIC FOR FD FANS SHEET NO. 17 OF 25

COGEN DIVISION THERMAX LIMITED CUSTOMER: CONSULTANT: ARASMETA CAPTIVE POWER PLANT DEVELOPMENT CONSULTANTS LTD. KOLKATA PROJECT: 43 MW CPP INTERLOCK & LOGIC SCHEMATICS FOR UNI DIRECTIONAL DRIVES BFP START PERMISSIVE LOGIC DCS
FD FAN DE BRG VIBRATION

DCS LOGIC SP= XX DEG C

FIELD

10-VI-XXXA& 10 TI 131A
FD FAN NDE BRG VIBRATION

SP= XX DEG C

10-TI-XXXB
FDFMTR-X DE BRG TEMP.

SP=110 DEG C TO SHT 16 TO TRIP EQUIP SP=110 DEG C

11-TI-200A
FDFMTR-X NDE BRG TEMP.

11-TI-200B
FDF WDG TEMP-PH-R

SP=110 DEG C

11-ZSC200 11-FBON100

OR

&

TO SHT16 START PERMISSIVE

11-TI-XXXC

FDF WDG TEMP-PH-R

SP=110 DEG C
11-LAL-600

11-TI-XXXD
FDF WDG TEMP-PH-Y

SP=110 DEG C FROM 11-LT-600A/B/C SP=110 DEG C

10-TI-XXXE
FDF WDG TEMP-PH-Y

COMP. (#)

10-TI-XXXF
FDF WDG TEMP-PH-B

SP=110 DEG C

10-TI-XXXG
FDF WDG TEMP-PH-B

SP=110 DEG C

# THIS BLOCK WILL BE USED IF ANY TWO OF THE SIX WINDING TEMP ARE HIGH, THEN PUMP SHOULD BE TRIPPED

10-TI-XXXH

NOTE:1 0 REV NO. 21.9.2005 1.8.2005 DATE SECOND ISSUE FIRST ISSUE PURPOSE REVISION HISTORY BY JB RS JB CHKD JB JB APPD SUB SYSTEM: DRAWING NO.PP 023 I 101 4 LOGIC FOR FD FANS SHEET NO. 18 OF 25 REFER NEXT SHEET FOR DETAILS OF PROCESS CONDITION AND RELATED TAGS.

THERMAX LIMITED CUSTOMER: PROJECT:


DCS/FIELD

COGEN DIVISION

CONSULTANT: ARASMETA CAPTIVE POWER PLANT DEVELOPMENT CONSULTANTS LTD. KOLKATA 43 MW CPP INTERLOCK & LOGIC SCHEMATICS FOR BI DIRECTIONAL DRIVES
DCS LOGIC * & OR & & READY TO START & NC LOC Selected XX-LOCX-YYY
OPEN COMMAND

MCC

OPEN

NO NO

FORCE OPEN OPEN PERM

REM SEL

&
AUTO SEL

S OR R

NO

ON (Forward)

XX-ONF-YYY

MANUAL SEL

OPEN LS

40-ZIO-YYY

NO

OR
STOP OPEN TS

40-WAO-YYY NC

CLOSE

& OR & CLOSE COMMAND OR & OR OR


CLOSE TS

&

& OR

S R

NO

NO NO READY TO START

FORCE CLOSE CLOSE PERM

ON (Reverse)

XX-ONR-YYY

S R
* TDO-1-50 SEC

40-WAC-YYY 40-ZIC-YYY

NC
NO

CLOSE LS

RUN TIME ERROR OPEN TORQUE ACT OPEN INDICATION CLOSE INDICATION CLOSE TORQUE ACT THERMAL OVERLOAD * 1 0 REV NO. 21.9.2005 11/1/2005 DATE SECOND ISSUE FIRST ISSUE PURPOSE REVISION HISTORY RS BY The RUN TIME ERROR FF will reset when "reset" PB on drive pop-up is pressed NOTE:JB JB CHKD JB JB APPD SUB SYSTEM: DRAWING NO.LSP OPRTD

40-LSPX-XXX

TH / OL

XX-OLX-YYY NC

1- REFER NEXT SHEET FOR DETAILS OF PROCESS CONDITION AND RELATED TAGS. LOGIC FOR AUX. COOLING WATER PUMPS DISCH. MOV PP 023 I 101 4 SHEET NO. 19 OF 25

DRIVE TAG 10-XV-003A 10-XV-003B 10-XV-004A 10-XV-004B 10-XV-005A 10-XV-005B 11-XV-605A 11-XV-605B

PROCESS CONDITIONS APPLICABLE FOR LOGIC SERVICE OPEN PERM BFP-1 DISCHARGE MOV BFP-1 DISCHARGE MOV IBV BFP-2 DISCHARGE MOV BFP-2 DISCHARGE MOV IBV BFP-3 DISCHARGE MOV BFP-3 DISCHARGE MOV IBV BOILER-1 MSSV BOILER-1 MSSV IBV 10-ZIO-003B NA 10-ZIO-004B NA 10-ZIO-005B NA 10-ZIO-605B NA

CLOSE PERMISSIVE NA NA NA NA NA NA NA NA

FORCE OPEN 10-FBON-003 NA 10-FBON-004 NA 10-FBON-005 NA


NA

FORCE CLOSE 10-FBOF-003 NA 10-FBOF-004 NA 10-FBOF-005 NA NA NA

NA

SAME LOGIC FOR BOILER-2 VALVES 12-XV-605A & 12-XV605B

RELATED TAG NOS. REFERENCE DRIVE TAG 10-XV-003A 10-XV-003B 10-XV-004A 10-XV-004B 10-XV-005A 10-XV-005B 10-XV-605A 10-XV-605B DIGITAL INPUT TH / OL 10-OLX-003A 10-OLX-003B 10-OLX-004A 10-OLX-004B 10-OLX-005A 10-OLX-005B 10-OLX-605A 10-OLX-605B CLS LS 10-ZIC-003A 10-ZIC-003B 10-ZIC-004A 10-ZIC-004B 10-ZIC-005A 10-ZIC-005B 10-ZIC-605A 10-ZIC-605B OPN LS 10-ZIO-003A 10-ZIO-003B 10-ZIO-004A 10-ZIO-004B 10-ZIO-005A 10-ZIO-005B 10-ZIO-605A 10-ZIO-605B OPEN TS 10-WAO-003A 10-WAO-003B 10-WAO-004A 10-WAO-004B 10-WAO-005A 10-WAO-005B 10-WAO-605A 10-WAO-605B CLOSE TS 10-WAC-003A 10-WAC-003B 10-WAC-004A 10-WAC-004B 10-WAC-005A 10-WAC-005B 10-WAC-605A 10-WAC-605B LSPX
10-LSPX-003A 10-LSPX-003B 10-LSPX-004A 10-LSPX-004B 10-LSPX-005A 10-LSPX-005B 10-LSPX-605A 10-LSPX-605B

REMARKS / NOTES:DIGITAL OUPUT LOC SEL. 10-LOCX-003A 10-LOCX-003B 10-LOCX-004A 10-LOCX-004B 10-LOCX-005A 10-LOCX-005B 10-LOCX-605A 10-LOCX-605B ON FORW 10-ONF-003A 10-ONF-003B 10-ONF-004A 10-ONF-004B 10-ONF-005A 10-ONF-005B 10-ONF-605A 10-ONF-605B ON REV 10-ONR-003A 10-ONR-003B 10-ONR-004A 10-ONR-004B 10-ONR-005A 10-ONR-005B 10-ONR-605A 10-ONR-605B

1 0 REV NO.

21.9.2005 1.8.2005 DATE

SECOND ISSUE FIRST ISSUE PURPOSE REVISION HISTORY RS BY JB

JB JB APPD CHKD

JB SUB SYSTEM: DRAWING NO.LOGIC FOR AUX. COOLING WATER PUMPS DISCH. MOV PP 023 I 101 4 SHEET NO. 20 OF 25

THERMAX LIMITED CUSTOMER: PROJECT:


DCS/FIELD

ARASMETA CAPTIVE POWER PLA 43 MW CPP INT

OPEN

& OR & &

NO NO

FORCE OPEN OPEN PERM

REM SEL

AUTO SEL

MANUAL SEL

STOP

CLOSE

& OR &

NO NO READY TO START

FORCE CLOSE CLOSE PERM

OR

RUN TIME ERROR OPEN TORQUE ACT OPEN INDICATION CLOSE INDICATION CLOSE TORQUE ACT THERMAL OVERLOAD * 1 0 REV NO. 21.9.2005 11/1/2005 DATE SECOND ISSUE FIRST ISSUE PURPOSE REVISION HISTORY

DRIVE TAG 11-XV-600A 11-XV-600B 11-XV-600C 11-XV-604 10-XV-002

PROCESS CONDITIONS APPLIC SERVICE OP FLCV ISOLATION MOV FLCV ISOLATION MOV IBV LLCV ISOLATION MOV SH SPRAY ISOLATION MOV DEARATOR LEVEL CONT BYP MOV 11

SAME LOGIC FOR BOILER-2 VALVES

RELATED TAG DRIVE TAG 11-XV-003A 11-XV-600B 11-XV-600C 11-XV-604 10-XV-002 DIGITAL INP TH / OL 11-OLX-600A 11-OLX-600B 11-OLX-600C 11-OLX-604 10-OLX-002 CLS LS 11-ZIC-600A 11-ZIC-600B 11-ZIC-600C 11-ZIC-604 10-ZIC-002 OPN LS 11-ZIO-600A 11-ZIO-600B 11-ZIO-600C 11-ZIO-604 10-ZIO-002 O 11-W 11-W 11-W 11-W 10-W

1 0 REV NO.

21.9.2005 1.8.2005 DATE

SECOND ISSUE FIRST ISSUE PURPOSE REVISION HISTORY

COGEN DIVISION

ANT

CONSULTANT:

DEVELOPMENT CONSULTANTS LTD. KOLKATA

ERLOCK & LOGIC SCHEMATICS FOR BI DIRECTIONAL DRIVES


DCS LOGIC & OR & & READY TO START & NC LOC Selected XX-LOCX-YYY
OPEN COMMAND

MCC

&

S OR R

NO

ON (Forward)

XX-ONF-YYY

OPEN LS

40-ZIO-YYY

NO

OR
OPEN TS

40-WAO-YYY NC

OR

& CLOSE COMMAND

& OR

S R

NO

ON (Reverse)

XX-ONR-YYY

OR & OR
CLOSE TS

S R
* TDO-1-50 SEC

40-WAC-YYY 40-ZIC-YYY

NC
NO

CLOSE LS

40-LSPX-XXX
LSP OPRTD

TH / OL

XX-OLX-YYY NC

The RUN TIME ERROR FF will reset when "reset" PB on drive pop-up is pressed NOTE:JB RS BY JB CHKD JB JB APPD SUB SYSTEM: DRAWING NO.LOGIC FOR AUX. COOLING WATER PUMPS DISCH. MOV PP 023 I 101 4 SHEET NO. 21 OF 25 1- REFER NEXT SHEET FOR DETAILS OF PROCESS CONDITION AND RELATED TAGS.

CABLE FOR LOGIC PEN PERM -ZIO-600B NA NA NA NA

CLOSE PERMISSIVE NA NA NA NA NA

FORCE OPEN NA NA NA NA NA

FORCE CLOSE NA 11-ZIO-600A NA NA NA

SAME LOGIC FOR BOILER-2 VALVES

NOS. REFERENCE PUT OPEN TS WAO-600A WAO-600B WAO-604 WAO-002 CLOSE TS 11-WAC-600A 11-WAC-600B 11-WAC-604 10-WAC-002 LSPX
11-LSPX-600A 11-LSPX-600B 11-LSPX-600C 11-LSPX-604 10-LSPX-002

REMARKS / NOTES:DIGITAL OUPUT LOC SEL. ON FORW ON REV 11-ONR-600A 11-ONR-600B 11-ONR-600C 11-ONR-604 10-ONR-002 11-LOCX-600A 11-ONF-600A 11-LOCX-600B 11-ONF-600B 11-LOCX-600C 11-ONF-600C 11-LOCX-604 10-LOCX-002 11-ONF-604 10-ONF-002

WAO-600C 11-WAC-600C

JB RS BY JB CHKD

JB JB APPD SUB SYSTEM: DRAWING NO.LOGIC FOR AUX. COOLING WATER PUMPS DISCH. MOV PP 023 I 101 4 SHEET NO. 22 OF 25

THERMAX LIMITED CUSTOMER: PROJECT:


DCS/FIELD

COGEN DIVISION

KANORIA CHEMICAL & INDUSTRIES LTD CONSULTANT: DEVELOPMENT CONSULTANTS LTD. 25 MW CPP UNIT-II, RENUKOOT INTERLOCK & LOGIC SCHEMATICS FOR BI DIRECTIONAL DRIVES (INCHING DUTY)
DCS LOGIC * 10SEC & OR & NC LOC Selected XX-LOC-YYY &
OPEN COMMAND

MCC

OPEN

NO NO

FORCE OPEN OPEN PERM

REM SEL

&
AUTO SEL MANUAL SEL

NO

ON (Forward)

XX-ONF-YYY

OPEN LS

40-ZIO-YYY
40-WAO-YYY

NO NC

OR
STOP OPEN &TS

CLOSE

& OR &
CLOSE

&

NO NO

FORCE CLOSE CLOSE PERM

&

NO

ON (Reverse)

XX-ONR-YYY

10 SEC

COMMAND OR

CLOSE TS

40-WAC-YYY

NC

S R
*

& OR

CLOSE LS

40-ZIC-YYY

NO

RUN TIME ERROR OPEN LIMIT SWITCH CLOSE LIMIT SWITCH LSP OPERATED THERMAL OVERLAOD NOTE:1 0 REV NO. 21.9.2005 1.8.2005 DATE SECOND ISSUE FIRST ISSUE PURPOSE REVISION HISTORY RS BY JB JB CHKD JB JB APPD SUB SYSTEM: DRAWING NO.LOGIC FOR BOILER FW 100% BYPASS & CBD INCHING MOV. PP 023 I 101 4 SHEET NO. 23 OF 25 1- REFER NEXT SHEET FOR DETAILS OF PROCESS CONDITION AND RELATED TAGS.
TH / OL LSP OPRTD

10-LSP-YYY

NC

XX-OL-YYY

NC

THERMAX LIMITED CUSTOMER: PROJECT:

COGEN DIVISION

KANORIA CHEMICAL & INDUSTRIES LTD CONSULTANT: DEVELOPMENT CONSULTANTS LTD. 25 MW CPP UNIT-II, RENUKOOT INTERLOCK & LOGIC SCHEMATICS FOR BI DIRECTIONAL DRIVES (INCHING DUTY)
PROCESS CONDITIONS APPLICABLE FOR LOGIC SERVICE OPEN PERM

DRIVE TAG 11-XV-601 11-XV-550

CLOSE PERMISSIVE NA NA

FORCE OPEN NA NA

FORCE CLOSE NA NA

FW CONTROL STN BYPASS MOV BOILER CBD MOV

NA NA

SAME LOGIC FOR BOILER-2 VALVES

RELATED TAG NOS. REFERENCE DRIVE TAG 11-XV-601 11-XV-550 DIGITAL INUPUT LSP 11-LSP-601 11-LSP-550 TH / OL 11-OLX-601 11-OLX-550 CLS LS 11-ZSC-601 11-ZSC-550 OPN LS 11-ZSO-601 11-ZSO-550 OPEN TS 11-WSO-601 11-WSO-550 CLOSE TS 11-WSC-601 11-WSC-550 LOC SEL. 11-LOCX-601 11-LOCX-550 DIGITAL OUTPUT ON FORW 11-ONF-601 11-ONF-550 ON REV 11-ONR-601 11-ONR-550

REMARKS / NOTES:-

1 0 REV NO.

21.9.2005 1.8.2005 DATE

SECOND ISSUE FIRST ISSUE PURPOSE REVISION HISTORY RS BY

JB JB CHKD

JB JB APPD SUB SYSTEM: DRAWING NO.LOGIC FOR BOILER FW 100% BYPASS & CBD INCHING MOV. PP 023 I 101 4 SHEET NO. 24 OF 25

BOILER DRIVE LOGICS


SOLENOID OPERATED DAMPERS DCS/FIELD
MANUAL SEL OPEN

DCS LOGIC &


MAN OPEN COMM

MCC

AUTO SEL

&
AUTO OPEN

OR & S R NO OPEN XX-UVOP-YYY

NO NO

AUTO OPEN OPEN PERM

OR NO
AUTO CLOSE

10-60 sec OR & OPEN XX-ZIO-YYY


CLOSED

CLOSE
RUNTIME ERROR

NO

NO

OPEN

XX-ZIC-YYY
CLOSED

DRIVE TAG 11-UV-301 11-UV-302 11-UV-303 11-UV-304 10-UV-002

SERVICE BL-1 PA TO COMP-1 BL-1 PA TO COMP-2 BL-1 PA TO COMP-3 BL-1 PA TO COMP-4 DEARATOR OVERFLOW VALVE

START PERM AUTO OPEN AUTO CLOSE YYY NA NA NA 301 NA NA NA 302 NA NA NA NA NA 10-LSHH-002 NA NA NA 303 304 OO2

REMARKS

P & ID REF D12-1FB-5031P D12-1FB-5031P D12-1FB-5031P D12-1FB-5031P D12-1FB-5032P

THERMAX CO-GEN DIVISION CHK APP BY DATE RS JB 21.9.2005

ARASMETA CAPTIVE POWER CO. PVT. LTD. 43 MW REV 0 INTERLOCK AND LOGIC SCHEMATICS BOILER SECTION-SOLENOID OPERATED VALVES DWG NO. : PP O23 I 101 4 SHT 25 OF 25 REV NO. 1