No. C-DOT/ATM/AT-002
No of Pages. Issue No. Issued By: Approved By: Date of Issue 08 01 T&D, Circle CGM T&D Circle 12-03-2005 NIL
Amendment No (If Any) No of Pages Issued by: Approved By: Date of Issue
BHARAT SANCHAR NIGAM LIMITED (A Govt. of India Enterprise) TECHNICAL & DEVELOPMENT CIRCLE, SANCHAR VIKAS BHAWAN, RESIDENCY ROAD, JABALPUR, MP-482001
ENGINEERING INSTRUCTIONS
Page 2 of 2
Issue-1 Date
ENGINEERING INSTRUCTIONS
(B) TESTS BEFORE POWER-ON 1-Cable laying and termination Visual check of 48V power cables, earth distribution cables, etc with proper labeling and lacing. The system connectivity is verified for proper labeling as per Block schematic shown in Annexure - II (Ref: Item 3.1 of C-DOT A/T manual on C-DOT ATM switch & ATM Multiplexer) 2-Hardware conformity check Ensure correct label number and markings on Racks and boards on matching with the same given in the document. (Ref: As per Installation manual and Item 2.2 of C-DOT A/T manual on C-DOT ATM switch & ATM Multiplexer) 3-Check of Equipment Layout including cards in both Core & MUX Switch Ensure proper provision of equipments as mentioned in Plan document. Verify the cards availability as per Annexure I. (Ref: As per approved site plan) (C) TESTS AFTER POWER-ON: 1-Voltage Drop check - Maximum drop not to exceed 1 Volt (Ref: T&D circle Test Schedule) 2-Tertiary power supply check The lower & higher values not to exceed the given limits. (Ref: As per Item 3.3 of C-DOT A/T manual on C-DOT ATM switch & ATM Multiplexer) 3-Software conformity check Verification of checksum values labeled on the E-PROMs/chips with document. (Ref: As per Item 2.2 of C-DOT A/T manual on C-DOT ATM switch & ATM Multiplexer) 4-Check of Alarms Verify alarms during faults in eqpt, H/W failure, Synchronization timing source changes, diagnostic errors. Also verify proper fuse/protective equipment ratings and infrastructure alarms. (Ref: As per Item 4.1 & 4.2 of C-DOT A/T manual on C-DOT ATM switch & ATM Multiplexer) 5-System Initialization tests Also verify self test of equipments. (Ref: As per Item 7.1 & 7.2 of C-DOT A/T manual on C-DOT ATM switch & ATM Multiplexer) 6-System Back-up and restoration Verification of backed-up data & its restoration. Also note time taken for these activities. (Ref: As per Item 9.2 of C-DOT A/T manual on C-DOT ATM switch & ATM Multiplexer) 7-Verification of status of Interfaces & Cards by command. Check loopback facility in the interface cards. Also verify proper operation of LEDs and status indication on the terminal for all cards, links, etc. (Ref: C-DOT system configuration guide) 8-Redundancy/ Duplex working check, Active/Std-by status to be checked for all cards & equipments/ interfaces: AMC switch-over, CSC switch-over & SCP switch-over. Verify no disturbance in the established PVC connection during the change-over. (Ref: As per Item 9.1 of C-DOT A/T manual on C-DOT ATM switch & ATM Multiplexer) 9-Functional test on the cards ASC, APC,ATC, ATU & ATS and equipments Test on for their functionality like subs creation, contract creation, session creation, address assignment, etc.
BHARAT SANCHAR NIGAM LIMITED A Govt of India Enterprises Restricted to Telecom Staff
Page 3 of 3
Issue-1 Date
ENGINEERING INSTRUCTIONS
(Ref: As per Item 8.1 to 8.5 of C-DOT A/T manual on C-DOT ATM switch & ATM Multiplexer, C-DOT system config user guide & service provisioning user guide) 10-Physical Layer Tests on ATU, ATS, ATC, APC & ASC cards Tests to be conducted are BER, JITTER, Tolerance, LOS, LOF, AIS, RDI, REI, Pulse mask, etc.for E1 & E3 layers. See Annexure III for connection set-up. (Ref: As per Item 9.1 to 9.5 of C-DOT A/T manual on C-DOT ATM switch & ATM Multiplexer, C-DOT system) 11-Fault Management Create faults- verify error reporting on the display as well as designated terminal. Verify accuracy of error reporting as per fault dictionary. (Ref: As per C-DOT system config user guide & service provisioning user guide) 12-Connection and configuration management- Creation, deletion, modification and suppression of sessions on all cards. Also verify response time for these activities. Verify Establish, Release, modify, Add, Activate, remove, Deactivate for PVC~P2P, PVC~P2M crossconnections. The following entities are configured: ATM-NE, Modules, PIUs, Ports, interfaces,connections, traffic package. (Ref: As per Item 8.1 & 8.2 of C-DOT A/T manual on C-DOT ATM switch & ATM Multiplexer, C-DOT system config user guide & service provisioning user guide) 13-B-ISDN functions Sample operation & maintenance functions to be seen. (Ref: ITU-T recommendations 1.610) 14-Local & Remote Node management Verify manageability both locally and from remote NMS for configuration of parameters for Node name, Control card IP address, control and fabric redundancy, database management. (Ref: As per Item 8.1(2) &(3) of C-DOT A/T manual on C-DOT ATM switch & ATM Multiplexer) 15-Diagnostic TestsDiagnostic tests on CSC,SCP,AMC,ASC,APC,ATC,ATU & ATS cards & ports. Note time of detection of fault/restoration for each board. Detection of VPC & VCC failures in the network. (Ref: As per Item 10.1 of C-DOT A/T manual on C-DOT ATM switch & ATM Multiplexer) 16-Password/ security management Verify also the idle time-out feature for password protection (Ref: As per Item 7.2(5) &(9) of C-DOT A/T manual on C-DOT ATM switch & ATM Multiplexer) 17-Clock management Verify Clock synchronization test and its duplex working. (Ref: As per C-DOT system config user guide & service provisioning user guide) 18-Calender management Correct operation of tasks assigned in calender (Ref: As per C-DOT system config user guide & service provisioning user guide)
BHARAT SANCHAR NIGAM LIMITED A Govt of India Enterprises Restricted to Telecom Staff
Page 4 of 4
Issue-1 Date
ENGINEERING INSTRUCTIONS
19-Signaling & protocol tests Verify availability of mentioned protocols & signalling information by command. Perform tests on signaling link. (Ref: As per C-DOT system config user guide & service provisioning user guide) 20-Traffic management/ observation tests and statistical information Verification of different traffic parameters and analysis like busy hour traffic, individual board traffic, periodic traffic, outage reports to enable discounts, etc. Statistical information regarding Cell transmission & reception, the per port &per connection information regarding Physical layer & ATM layer. (Ref: As per Item 11.1 to 11.3 of C-DOT A/T manual on C-DOT ATM switch & ATM Multiplexer) 21-Charging management Account creation, deletion, generation of CDRs and matching with sample test calls. Matching of call details with approved tariff plan. Accounting information display, generation of bill records, central bill processing, back-up of bill data. Also verify storing of CDRs in the buffer by breaking link to LMS and on restoration of the link, the CDRs start transfer to CBS automatically. (Ref; As per Item 12(5) of C-DOT A/T manual on C-DOT ATM switch & ATM Multiplexer) 22-Check of system reports Generation of Reports like detailed billing, subs meter dump, call details, commercial bill record, subs and other observation, etc. (Ref: As per C-DOT system config user guide & service provisioning user guide) 23-Quality of service tests Verify the following: CLR (Cell loss ratio) CTD (Cell transfer delay) CDV (cell delay variation) (Ref: As per C-DOT system config user guide & service provisioning user guide) 24-NMS tests Should be able to perform config, fault & performance management from a centralized location. Verify capabilities for: Status of equipped cards physically installed, Remote Node Config, GUI functionality, Diagnostics, Fault reporting, Alarms, Link & Path management on sample basis. Note the time taken for downloading of software from NMS on creation commands. (Ref: As per C-DOT system config user guide & service provisioning user guide) 25-Load Testing- With only ASC cards in CAX & CAM for 72 hours as per Annexure- IV With all the cards for 72 hours as per Annexure-V (Ref: As per Item 12.1 to 12.3 of C-DOT A/T manual on C-DOT ATM switch & ATM Multiplexer) 3. CONCLUSION The above test procedure is very important for prompt A/T of C-DOT ATM System & services as well as in smooth commissioning of the switch and subsequent provisioning of services to the customers. If the standards mentioned in the A/T schedule are properly met during testing, there is no doubt that maintenance authorities will have any difficulty in rolling out one of the best services to the customers as well as ensure that future expansion will be effortless.
BHARAT SANCHAR NIGAM LIMITED A Govt of India Enterprises Restricted to Telecom Staff
Page 5 of 5
Issue-1 Date
ENGINEERING INSTRUCTIONS
Annexure I AVAILABILITY OF CARDS / BOARDS CORE SWITCH ASC (ATM synchronous card) APC (ATM Piesiochronous card) AMC (ATM Main Controller card) SCP (SOC Distribution and Clock and Power Card) CSC (Cell switching card) MULTIPLEXER ASC (ATM synchronous card) APC (ATM Piesiochronous card) AMC (ATM Main Controller card) SCP (SOC Distribution and Clock and Power Card) CSC (Cell switching card) ATC (E1 ATM card) ATU (E1 Unstructured card) ATS (E1 Structured card) AHC (E3 Unstructured card) ASI (ADSL Subs Interface card) Annexure II THE BUILT-UP OF ATM SYSTEM AT DELHI DELHI MTNL
ATM FDF
NTR
FDF OE DD F ADM 16
N/W
E
TO BLORE Interfaces A B C D E OE PCM (Tx/Rx) Tie cable 24 pr optical i/f Electrical i/f PCM optical to Electrical converter
BHARAT SANCHAR NIGAM LIMITED A Govt of India Enterprises Restricted to Telecom Staff
Page 6 of 6
Issue-1 Date
ENGINEERING INSTRUCTIONS
Tx
Rx
Rx Tx Rx
DELHI MUX
Tx
Tx Rx
Rx Tx
DELHI CS
STM-I LOOP
Rx Tx BLORE MUX
Tx
Rx Rx Tx Tx Rx
BLORE CS
BHARAT SANCHAR NIGAM LIMITED A Govt of India Enterprises Restricted to Telecom Staff
Page 7 of 7
Issue-1 Date
ENGINEERING INSTRUCTIONS
NE BLORE 1101 CS
Tx Rx Tx Rx
8001
Tx A T U Rx
RJ-45
STM-I LINK Tx
Tx Rx Tx Rx Tx
Rx
STM-I
Annexure IV In the core switch all line cards are equipped with ASC cards. From the 1st port of each ASC card to its 2nd port, sessions are created. Physical loopback connection from port2-2nd ASC to port1-3rd ASC, port2-3rd ASC to port1-4th ASC and so on to be done. From test equipment, test pattern injected into 1st port-2nd ASC and monitored from 2nd port-8th ASC. EFS and other parameter results to be observed for 72 hours. Annexure V Equip ASC & APC cards in Core switch and at least one ATC, ATU, ATS & APC card each in the multiplexer. Interconnect 2 NEs keeping same configuration in both NEs. For each Line card, create connection as: port1-CAM1 to port1-CAM2, port2-CAM1 to port2-CAM2 and so on till port1-CAM8 to port2-CAM8. Make physical loopback connections port2 to port3, port4 to port5, port6 to port7 and self loopback of port8. Load test started by connecting test equipment on port1-CAM1. Documents referred: This EI is prepared referring C-DOT ATM switching system A/T Document. ----END----