HELMARK STEEL INC.


Delaware-based Helmark Steel has
completed projects nationwide for
private developments, government
agencies and institutions.

Experienced Fabricator
Helmark Steel Inc. is working on the East River Science Park project located along the East River in
Manhattan. Its extensive experience in the industry helped the company win this major project.

H elmark Steel Inc. claims to be one of the nation’s


leading fabricators and erectors of structural steel.
Headquartered in Wilmington, Del., the company
has completed various projects nationwide for private devel-
opers, government agencies and institutions requiring less
and forces most of the mechanical lines – plumbing, gas,
electric (and) fire protection – to run through penetrations
in the steel floor framing and transfer girders. A large num-
ber of built-up plate girders made from thick plates were
required to support (the) columns above while avoiding
than 100 to more than 20,000 tons of steel. interference with the required driving paths below in the
Erik Gross, project engineer, recently spoke with Construct- parking garage. Many of the column shafts supported by the
ion Today about the East River Science Park (ERSP) project transfer girders in the plaza level run the entire height of the
in Manhattan. ERSP consists of two 18-story towers – building, making the supporting girders extremely heavy.
using a total of more than 10,000 tons of steel – and a The tower cranes we are using on the job have a lifting
plaza-level parking deck and winter garden. The two build- capacities that (can’t) pick all of the heavy girders at the
ings are primarily for medical research radiuses required, so we are required to set these heavy
Helmark Steel Inc.
www.helmarksteel.com purposes, but the street level will be occu- members using a mobile crane from a very small radius.
Headquarters: Wilmington, Del. pied by restaurants and retail. (Also), the poor soil quality along the banks of the East
Employees: 280 Construction Today: What are some of River requires a pressure slab supported by pile caps to
Services: Steel fabricator and
erector the challenges you have encountered? support the slab below the plaza level where the future
Erik Gross, PE: “We specialize Erik Gross: The plaza level of the structure garage will sit.
in high-rise work and [the East is a parking garage to be outfitted with CT: How did you adapt to the ERSP’s complex floor system?
River project] is a fairly typical job
that we are very comfortable three-tier car jacks, (which) makes over- EG: The pressure slab is designed, so in theory, the soil
fabricating and erecting.” head space in the plaza a large concern between the pile caps supporting the slab and building